Search results

1 – 10 of 300
Article
Publication date: 1 June 2006

David Eaton, Rifat Akbiyikli and Michael Dickinson

This paper identifies the theoretical stimulants and impediments associated with the implementation of PFI/PPP (Private Finance Initiative/Public Private Partnership)projects. A…

1780

Abstract

This paper identifies the theoretical stimulants and impediments associated with the implementation of PFI/PPP (Private Finance Initiative/Public Private Partnership)projects. A current defect of this procurement approach is the unintentional constraint upon the innovations incorporated into the development of PFI projects. A critical evaluation of the published literature has been utilized to synthesize a theoretical model. The paper proposes a theoretical model for the identification of potential innovation stimulants and impediments within this type of procurement. This theoretical model is then utilised to evaluate four previously completed PFI projects. These project case‐studies have been examined in detail. The evaluation demonstrates how ineffective current procedures are. The application of this model before project letting could eliminate unintentional constraints and stimulate improved innovation within the process.The implementation of the model could improve the successful delivery of innovation within the entire PFI/PPP procurement process.

Details

Construction Innovation, vol. 6 no. 2
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 19 September 2016

Zoe Dickinson and Michael Smit

The purpose of this paper is to examine the challenges presented by search engine visibility for public libraries. The paper outlines the results of a pilot study investigating…

5073

Abstract

Purpose

The purpose of this paper is to examine the challenges presented by search engine visibility for public libraries. The paper outlines the results of a pilot study investigating search engine visibility in two Canadian public libraries.

Design/methodology/approach

The study consists of semi-structured interviews with librarians from two multi-branch Canadian public library systems, combined with quantitative data provided by each library, as well as data obtained through site-specific searches in Google and Bing. Possible barriers to visibility are identified through thematic analysis of the interviews.

Findings

The initial findings of this pilot study identify a complex combination of barriers to visibility on search engines, in the form of attitudes, policies, organizational structures, and technological difficulties.

Research limitations/implications

This paper describes a small, preliminary pilot study. More research is needed before any firm conclusions can be reached.

Practical implications

A review of the literature shows the increasing importance of search engine visibility for public libraries. By delving into the underlying issues which may be affecting libraries’ progress on the issue, this paper may help inform libraries’ decision-making processes and practices.

Originality/value

There has been little original research investigating the reasons behind libraries’ lack of visibility in search engine results pages. This paper provides insight into a previously unexplored area by exploring public libraries’ relationships with search engines.

Details

Aslib Journal of Information Management, vol. 68 no. 5
Type: Research Article
ISSN: 2050-3806

Keywords

Article
Publication date: 1 July 2003

James E. Hosking and Robert J. Jarvis

With ageing hospital facilities spanning the USA, the healthcare construction business continues to grow. Today, questions about replacing existing facilities are becoming more…

Abstract

With ageing hospital facilities spanning the USA, the healthcare construction business continues to grow. Today, questions about replacing existing facilities are becoming more common in hospital boardrooms. Given the above situation, TriBrook Healthcare Consultants were recently retained to determine the market, operational and financial impact which facility redevelopment has had on other hospitals and health systems. Out of that effort came this paper. This paper assesses: the factors which are fuelling replacement facility growth; the impact that redevelopment has on market, operational and financial performance; an integrated development process to help organisations determine the feasibility of designing a new facility; and lessons learned working with clients who have pursued a replacement facility strategy. The objective of this effort is to provide hospital executives and board leaders with information that will be useful in reaching a final decision regarding execution of a replacement strategy.

Content available
Article
Publication date: 21 June 2011

Helen Dickinson, Ross Millar and Michael West

580

Abstract

Details

Journal of Health Organization and Management, vol. 25 no. 3
Type: Research Article
ISSN: 1477-7266

Article
Publication date: 1 January 1997

Joseph G. Eisenhauer

Insurance and asset holdings are modeled as the jointly determined outcomes of a constrained optimization problem. Consequently, (1) full coverage may be optimal despite limited…

Abstract

Insurance and asset holdings are modeled as the jointly determined outcomes of a constrained optimization problem. Consequently, (1) full coverage may be optimal despite limited premium loading, (2) insurance is normal if insurable assets are normal, (3) insurance cannot be a Giffen good, and (4) insurance is a complement to price‐elastic assets.

Details

Studies in Economics and Finance, vol. 17 no. 2
Type: Research Article
ISSN: 1086-7376

Article
Publication date: 10 April 2007

Per Erik Eriksson, Michael Dickinson and Malik M.A. Khalfan

The aim of this paper is to investigate how a client's cooperative procurement procedures influence subcontractor involvement, value creation, and innovation in the construction…

5523

Abstract

Purpose

The aim of this paper is to investigate how a client's cooperative procurement procedures influence subcontractor involvement, value creation, and innovation in the construction of complex facilities.

Design/methodology/approach

Empirical data were collected through interviews, surveys and participation in workshops during a longitudinal action research case study. The case project was located in Sweden and concerned the construction of plant facilities for manufacturing of pharmaceutical products.

Findings

The case study findings reveal that the client's procurement procedures affect the level of subcontractor involvement and integration, but that this does not necessarily result in increased subcontractor value creation and innovation in the construction process.

Research limitations/implications

Since the empirical results are based on data collected from only one case project, the possibilities for generalisations are limited.

Practical implications

Clients' procurement procedures heavily affect subcontractor involvement, but in order to increase subcontractor contributions to innovation and value creation the actors should adopt a long‐term perspective and actively work to establish an innovation‐friendly climate.

Originality/value

This paper focuses on the often‐neglected importance of subcontractors and their contributions to innovation and value creation.

Details

Facilities, vol. 25 no. 5/6
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 19 June 2009

Adekunle S. Oyegoke, Michael Dickinson, Malik M.A. Khalfan, Peter McDermott and Steve Rowlinson

The purpose of this paper is to examine different categories of building project procurement routes based on organisational, contractual, financial and technical issues.

13264

Abstract

Purpose

The purpose of this paper is to examine different categories of building project procurement routes based on organisational, contractual, financial and technical issues.

Design/methodology/approach

The paper is based on review of literature and conditions of contracts. The UK construction industry serves as a general frame of reference. The Royal Institution of Chartered Surveyors survey of Contracts in Use from 1985 to 2004 is used to probe the share and value of contracts along different procurement routes and across different conditions of contracts in the UK. The logic is that the value and the share of contracts will indicate the behaviour of different procurement routes in the UK construction market while the in‐depth analysis of conditions of contracts will show the gaps and relationships between the general definition/categorisation and contractual context (conditions of contracts) of each of the procurement routes.

Findings

The preliminary result of the analysis shows that traditional routes remain the main type of procurement route for the construction project industry sector, within which different management and incentivisation systems are applied for greater efficiency. The conditions of contracts in the UK support this assertion by aligning different procurement routes to different conditions of contracts and additionally specifying different forms of agreements, special provisions and incentivisation in order to increase performance, reduce risks and improve compensation methods.

Research limitations/implications

The study can serve as a learning opportunity for construction project stakeholders internationally, and clients in particular, to differentiate between procurement routes, management‐oriented systems, relational contracting and incentivisation.

Originality/value

The research provides an original assessment of construction procurement which can be used as intervening tool in different levels of private and public procurement strategies.

Details

International Journal of Managing Projects in Business, vol. 2 no. 3
Type: Research Article
ISSN: 1753-8378

Keywords

Content available
Article
Publication date: 19 June 2009

Derek H.T. Walker

560

Abstract

Details

International Journal of Managing Projects in Business, vol. 2 no. 3
Type: Research Article
ISSN: 1753-8378

Article
Publication date: 1 January 1989

PMD have appointed David H. Ormerod to the position of printed circuits products manager as part of their marketing organisation.

Abstract

PMD have appointed David H. Ormerod to the position of printed circuits products manager as part of their marketing organisation.

Details

Circuit World, vol. 15 no. 2
Type: Research Article
ISSN: 0305-6120

Article
Publication date: 1 May 1993

Russell A. Eisenstat

The process described in Russell Eisenstat's presentation was developed by Eisenstat and Michael Beer in partnership with Becton Dickinson, a $2.5 billion medical technology…

Abstract

The process described in Russell Eisenstat's presentation was developed by Eisenstat and Michael Beer in partnership with Becton Dickinson, a $2.5 billion medical technology company. The presentation by James Wessel of Becton Dickinson, which follows Mr. Eisenstat's overview, outlines some of the implementation barriers encountered.

Details

Planning Review, vol. 21 no. 5
Type: Research Article
ISSN: 0094-064X

1 – 10 of 300