Article
Publication date: 14 March 2024

Umer Zaman, Laura Florez-Perez, Saba Abbasi and Muhammad Shahid Nawaz

Organizations are full of contradictions and leadership dilemmas. Managers often face challenges such as selecting between two contradicting options such that which one is more…

118

Abstract

Purpose

Organizations are full of contradictions and leadership dilemmas. Managers often face challenges such as selecting between two contradicting options such that which one is more important can hardly be judged. To manage contradicting dynamics, today’s managers can adopt the paradoxical leadership approach. We build a theoretical model to investigate the influence of paradoxical leadership on multi-dimensional project agility (proactivity, adaptability, and resilience), and multi-dimensional project success (management, investment, and ownership success).

Design/methodology/approach

Drawing on survey-based data from the China–Pakistan Economic Corridor (CPEC) megaproject (N = 209), we performed covariance-based structural equation modeling to test the conceptual model.

Findings

The findings show that (1) paradoxical leadership has a significant positive impact on megaproject success, (2) paradoxical leadership has a significant positive influence on project agility, (3) project agility has a significant positive effect on megaproject success, and (4) project agility has a significant effect that mediates the link between paradoxical leadership and megaproject success. This research provides a theoretical and practical comprehension of paradoxical leadership with a new perspective on megaprojects.

Originality/value

This study provides an extension of the existing studies on paradoxical leadership and identifies the role of contradicting dynamics and their impact on multiple facets of megaproject success. It not only clarifies the relationship between paradoxical leadership and megaproject success, but also identifies the mediating role of project agility that can play an effective role in mobilizing success in megaprojects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 15 March 2024

Mohammed Taha Alqershy, Qian Shi and Diana R. Anbar

This study aims to investigate the factors influencing the social responsibility performance of Belt and Road Initiative (BRI) megaprojects. Specifically, it examines the role of…

Abstract

Purpose

This study aims to investigate the factors influencing the social responsibility performance of Belt and Road Initiative (BRI) megaprojects. Specifically, it examines the role of isomorphic pressures and the joint influence of perceived benefits and top management support on megaproject social responsibility performance (MSRP).

Design/methodology/approach

Drawing from institutional theory, social exchange theory, and top management literature, this study established a conceptual model featuring eleven hypotheses. Subsequently, a questionnaire survey was administered to collect data from 238 actively engaged participants in BRI megaprojects. Structural Equation Modelling was utilised to analyse the data.

Findings

The empirical findings indicate that mimetic and coercive pressures positively influence MSRP. Perceived benefits and top management support significantly enhance MSRP. Moreover, perceived benefits and top management support partially mediate the effects of coercive and mimetic pressures. However, when it comes to normative pressures, their impact on MSRP is solely channelled through the support of top management.

Originality/value

This study is one of the early endeavours to explore the factors influencing the social responsibility performance of BRI megaprojects. It sheds light on the interplay between external pressures and internal factors in shaping social responsibility efforts in these projects. These findings are of particular significance for BRI actors and stakeholders, offering guidance for enhancing social responsibility strategies within the context of BRI megaprojects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 2 February 2024

Quntao Wu, Qiushi Bo, Lan Luo, Chenxi Yang and Jianwang Wang

This study aims to obtain governance strategies for managing the complexity of megaprojects by analyzing the impact of individual factors and their configurations using the…

Abstract

Purpose

This study aims to obtain governance strategies for managing the complexity of megaprojects by analyzing the impact of individual factors and their configurations using the fuzzy-set qualitative comparative analysis (fsQCA) method and to provide references for project managers.

Design/methodology/approach

With the continuous development of the economy, society and construction industry, the number and scale of megaprojects are increasing, and the complexity is becoming serious. Based on the relevant literature, the factors affecting the complexity of megaprojects are determined through case analysis, and the paths of factors affecting the complexity are constructed for megaprojects. Then, the fsQCA method is used to analyze the factors affecting the complexity of megaprojects through 245 valid questionnaires from project engineers in this study.

Findings

The results support the correlation between the complexity factors of megaprojects, with six histological paths leading to high complexity and seven histological paths leading to low complexity.

Originality/value

It breaks the limitations of the traditional project complexity field through a “configuration perspective” and concludes that megaproject complexity is a synergistic effect of multiple factors. The study is important for enriching the theory of megaproject complexity and providing complexity governance strategies for managers in megaproject decision-making.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 11 April 2024

Handan Kunkcu, Kerim Koc and Asli Pelin Gurgun

Work–family conflict is one of the most challenging stressors for construction industry professionals to cope with emotional problems. This study aims to propose a model linking…

Abstract

Purpose

Work–family conflict is one of the most challenging stressors for construction industry professionals to cope with emotional problems. This study aims to propose a model linking work–family conflict and high-quality relationships among project team members and explore mediating effects of life and job satisfactions.

Design/methodology/approach

A theoretical framework was established based on the spillover theory and social exchange theory. Data were obtained by a questionnaire survey conducted with 328 respondents working in construction projects. Structural equation modeling (SEM) was used to test interrelationships among work–family conflict, job satisfaction, life satisfaction and high-quality relationship.

Findings

The results indicate that work–family conflict is negatively associated with both job and life satisfactions of construction professionals. In addition, there were direct and positive relationships between satisfaction domains and high-quality relationship capacity. The findings further support that job satisfaction plays a mediating role between work–family conflict and high-quality relationship among construction professionals, while life satisfaction does not mediate the relationship.

Originality/value

The effects of interrole conflicts on the context of satisfaction have been investigated previously; however, there is a lack of knowledge regarding its influence on high-quality relationship among project team members. This study extends the body of knowledge on high-quality relationships among project team members to understand how conflict and satisfaction factors influence interpersonal relationships in construction project management.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 6 March 2024

Xian Zheng, Xiao Hu, Chunlin Wu and Ju Bai

Although researchers have long recognized the importance of participating organizations’ (POs) relational behavior for mega construction projects (MCPs) performance, relational…

Abstract

Purpose

Although researchers have long recognized the importance of participating organizations’ (POs) relational behavior for mega construction projects (MCPs) performance, relational behavior may not be executed by POs without effective leadership from project owners. However, little is known about the mechanisms linking owners’ leadership styles to POs’ relational behavior. This study draws on full range leadership theory and role theory to examine the relationships between owners’ leadership styles (i.e. transformational and transactional) and relational behavior. POs’ role orientations (i.e. normative and economic) are considered as potential mediators.

Design/methodology/approach

Data were collected from 175 managers deeply involved in MCPs. Hierarchical regression model and bootstrapping methods were performed on the data to examine the direct effects of owners’ leadership on POs’ relational behavior and the mediating effects of POs’ role orientations.

Findings

The results revealed that both owners’ transformational and transactional leadership positively affect POs’ relational behavior, despite the former being higher than the latter, and indirectly influence relational behavior via POs’ normative and economic role orientation, respectively.

Practical implications

This study provides a clear picture of how owners’ leadership can motivate POs’ relational behavior to achieve high-quality inter-organizational relationships in MCPs. The findings can guide owners’ top manager selection by prioritizing those with transformational leadership, which is beneficial to achieving high-level relational behavior of POs. The results also imply that owners should pay greater attention to cultivating POs’ normative role orientation by encouraging teamwork and open communication to enhance their implementation of relational behavior.

Originality/value

Unlike previous research focusing more on intra-organizational leader–follower relationship within one PO, this study is one of the first to empirically confirm owners’ leadership as a critical antecedent of POs’ relational behavior, thus enhancing the theoretical understanding of inter-organizational relationship management in MCPs. Based on role theory, this study considers a novel organizational psychology mechanism, i.e. POs’ role orientations, as the mediator to unravel how owners’ leadership affects POs’ relational behavior, which was rarely invoked in MCP leadership literature.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 29 December 2023

Dara Sruthilaya, Aneetha Vilventhan and P.R.C. Gopal

The purpose of this paper is to identify and analyze the interdependence of project complexity factors (PCFs) in metro rail projects using the Decision-Making Trial and Evaluation…

Abstract

Purpose

The purpose of this paper is to identify and analyze the interdependence of project complexity factors (PCFs) in metro rail projects using the Decision-Making Trial and Evaluation Laboratory (DEMATEL). The study provides qualitative and quantitative analysis of project complexities factors and their relationships. The results of the study facilitate effective project planning, proactive risk management and informed decision-making by stakeholders.

Design/methodology/approach

This study employs a case-based method for identifying PCFs and a DEMATEL method for analyzing the interdependence of complexity factors in metro rail projects. Initially, PCFs were identified through an extensive literature review. To validate and refine these factors, semi-structured interviews were conducted with thirty experienced professionals, each having 5–20 years of experience in roles such as project management, engineering, and planning. Further, elevated and underground metro rail projects were purposefully selected as cases, for identifying the similarities and differences in PCFs. A questionnaire survey was conducted with various technical experts in metro rail projects. These experts rated the impact of PCFs on a five-point Likert scale, for the evaluation of the interdependence of PCFs. The DEMATEL technique was used to analyze the interdependencies of the PCFs.

Findings

Metro rail projects are influenced by project complexity, which significantly impacts their performance. The analysis reveals that “design problems with existing structures,” “change in design or construction” and “land acquisition” are the key factors contributing to project complexity.

Originality/value

The study of project complexity in metro rail projects is limited because most of the studies have studies on examining complexity in mega projects. The existing literature lacks adequate attention in identifying project complexity and its effects on metro rail project performance. This research aims to bridge this gap by examining project complexity and interdependencies in metro rail projects.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 28 February 2024

Thayla Zomer, Andy Neely and Paulo Savaget

How organisations interact with and respond to environmental pressures has been a long-term interest of organisational scholars. Still, it remains an under-theorised phenomenon…

Abstract

Purpose

How organisations interact with and respond to environmental pressures has been a long-term interest of organisational scholars. Still, it remains an under-theorised phenomenon from a project perspective. So far, there is limited understanding of how projects, which are composed by a constellation of organisations, “respond” to institutional pressures that are exerted on them. This research takes the perspective of projects as adopters/implementers of institutional pressures and analyses how they interact with, and respond to, such pressures. More specifically, this research explores how construction projects respond to the pressure of a Building Information Modelling (BIM) mandate.

Design/methodology/approach

Multiple in-depth case studies were conducted to explore the practical implementation of a BIM mandate in the UK and understand how the construction projects responded to the coercive pressures to implement a new policy mandate for process digitalisation. Multiple sources were employed for data collection and the data were analysed inductively. The findings identify a hybrid response comprising four distinct ways that projects might respond to an institutional pressure.

Findings

We find that projects decouple both from the content and from the intended purpose of a policy, i.e. there are two variance of a policy-practice decoupling phenomenon in projects. The findings also reveal the underlying conditions leading to decoupling.

Originality/value

We advance decoupling literature so that it better applies to the temporary, distributed and interdependent work conducted via projects. Second, we define decoupling in projects as a provisional and fragmented process of wayfinding through heterogeneous institutional spaces, and discuss the potential policy-practice assemblages in projects, influenced by how, if and when project members' activities decouple from the many and often contradicting institutional pressures they face. Third, we discuss how the qualitatively different forms of decoupling that we identified in our work may act as part of a legitimation process in ambiguous situations whereby projects might share a resemblance of conformity with institutional pressures when they are de facto only partially conforming to them.

Details

International Journal of Managing Projects in Business, vol. 17 no. 2
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 11 October 2022

Teng Ma and Ya Liu

The role of corporate social responsibility (CSR) fulfillment is critical when building resilience of project-based organizations (PBOs). However, fulfilling CSR to build a highly…

Abstract

Purpose

The role of corporate social responsibility (CSR) fulfillment is critical when building resilience of project-based organizations (PBOs). However, fulfilling CSR to build a highly resilient PBO remains a black box problem. This study explores the different CSR combinations that enhance PBO resilience.

Design/methodology/approach

This study defines CSR in terms of shareholder, employee, and social CSR, and analyzes corporate characteristics in terms of corporate scale and nature. Data are collected from Hexun.com and the China Stock Market and Accounting Research Database (CSMAR). The qualitative comparative analysis (QCA) method is used to analyze 48 listed construction and engineering companies from China to explore the CSR configurations for PBOs in enhancing organizational resilience.

Findings

A large firm size is a necessary condition for high organizational resilience. We find six paths to build high and non-high resilience in PBOs, and the driving mechanisms of high and non-high resilience exhibit an asymmetric relationship.

Research limitations/implications

This study cracks the black box of CSR fulfillment and PBO resilience. It reveals the CSR configurations that enhance or inhibit the resilience of PBOs. It also provides scientific basis for PBOs in their fulfillment of CSR in response to crises, and the enhancement of organizational resilience. Future research can be expanded to other industries, as the study sample is only limited to civil engineering construction companies. Since this study uses cross-sectional data, time series can be introduced in the future to further explore the relationship between CSR and organizational resilience.

Practical implications

This study provides targeted suggestions that can help decision-makers of construction companies to determine how they can fulfill CSR to enhance organizational resilience. At the same time, it can provide intellectual support for PBOs to cope with systemic crises and promote the fulfillment of CSR.

Originality/value

In terms of theoretical value, on the one hand, this study verifies the relationship between CSR fulfillment and PBO resilience, revealing its mechanism of action and multiple paths; on the other hand, it provides a new way of thinking for management research methods and enriches the theoretical study of organizational resilience.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 14 February 2024

Tiep Nguyen, Nicholas Chileshe, Duc Ty Ho, Viet Thanh Nguyen and Quang Phu Tran

Urban rail projects are typically large-scale transport infrastructure projects (megaprojects) which have many potential risks that can influence the strategic goals of owners…

Abstract

Purpose

Urban rail projects are typically large-scale transport infrastructure projects (megaprojects) which have many potential risks that can influence the strategic goals of owners. However, there is a paucity of studies which explore the impact of risks on both “urban rail” project time and cost together considering quantitative assessments. Therefore, this paper focuses on investigating critical risks and quantifying such risk impacts on urban railway project schedule and cost in practice.

Design/methodology/approach

A combination of qualitative and quantitative research methods comprising semi-interviews with five experts and a questionnaire survey of 132 professional respondents is used. The data were modeled using Monte Carlo Simulation to predict the probability of project schedule and cost.

Findings

The results show that 30 risk variables are categorized into seven main groups which have significant impacts on both project time and cost. Outstanding five risk variables were highlighted as follows: (1) project site clearance and land compensation; (2) design changes; (3) physical project resources; (4) contractors’ competencies and (5) project finance. Such findings were supported by Monte Carlo simulation which predicted in the worst case that the project may suffer 11.03 months’ delays and have cost overrun with a contingency of US$287.68 million.

Originality/value

This study expands our knowledge about time and cost contingency of urban metro railway implementation across developing economies and particularly within the context of Vietnam. Policymakers will not only gain an understanding about risk structure but will also recognize the significant impacts of critical risk through risk impact modeling and simulation. Such an approach provides insights into risk treatment priorities for planners so that they can proactively establish suitable strategies for risk mitigation in practice.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Expert briefing
Publication date: 27 February 2024

The sector will nevertheless remain mired in uncertainty for some time to come due to grassroots opposition, government efforts to overhaul sector regulations, and mining…