Publication date: 14 March 2024

Umer Zaman, Laura Florez-Perez, Saba Abbasi and Muhammad Shahid Nawaz

Organizations are full of contradictions and leadership dilemmas. Managers often face challenges such as selecting between two contradicting options such that which one is more…

121

Abstract

Purpose

Organizations are full of contradictions and leadership dilemmas. Managers often face challenges such as selecting between two contradicting options such that which one is more important can hardly be judged. To manage contradicting dynamics, today’s managers can adopt the paradoxical leadership approach. We build a theoretical model to investigate the influence of paradoxical leadership on multi-dimensional project agility (proactivity, adaptability, and resilience), and multi-dimensional project success (management, investment, and ownership success).

Design/methodology/approach

Drawing on survey-based data from the China–Pakistan Economic Corridor (CPEC) megaproject (N = 209), we performed covariance-based structural equation modeling to test the conceptual model.

Findings

The findings show that (1) paradoxical leadership has a significant positive impact on megaproject success, (2) paradoxical leadership has a significant positive influence on project agility, (3) project agility has a significant positive effect on megaproject success, and (4) project agility has a significant effect that mediates the link between paradoxical leadership and megaproject success. This research provides a theoretical and practical comprehension of paradoxical leadership with a new perspective on megaprojects.

Originality/value

This study provides an extension of the existing studies on paradoxical leadership and identifies the role of contradicting dynamics and their impact on multiple facets of megaproject success. It not only clarifies the relationship between paradoxical leadership and megaproject success, but also identifies the mediating role of project agility that can play an effective role in mobilizing success in megaprojects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 15 March 2024

Mohammed Taha Alqershy, Qian Shi and Diana R. Anbar

This study aims to investigate the factors influencing the social responsibility performance of Belt and Road Initiative (BRI) megaprojects. Specifically, it examines the role of…

Abstract

Purpose

This study aims to investigate the factors influencing the social responsibility performance of Belt and Road Initiative (BRI) megaprojects. Specifically, it examines the role of isomorphic pressures and the joint influence of perceived benefits and top management support on megaproject social responsibility performance (MSRP).

Design/methodology/approach

Drawing from institutional theory, social exchange theory, and top management literature, this study established a conceptual model featuring eleven hypotheses. Subsequently, a questionnaire survey was administered to collect data from 238 actively engaged participants in BRI megaprojects. Structural Equation Modelling was utilised to analyse the data.

Findings

The empirical findings indicate that mimetic and coercive pressures positively influence MSRP. Perceived benefits and top management support significantly enhance MSRP. Moreover, perceived benefits and top management support partially mediate the effects of coercive and mimetic pressures. However, when it comes to normative pressures, their impact on MSRP is solely channelled through the support of top management.

Originality/value

This study is one of the early endeavours to explore the factors influencing the social responsibility performance of BRI megaprojects. It sheds light on the interplay between external pressures and internal factors in shaping social responsibility efforts in these projects. These findings are of particular significance for BRI actors and stakeholders, offering guidance for enhancing social responsibility strategies within the context of BRI megaprojects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 7 June 2023

Khalil Idrissi Gartoumi, Mohamed Aboussaleh and Smail Zaki

This paper aims to explore a framework for implementing Lean Construction (LC) to provide corrective actions for quality defects, customer dissatisfaction and value creation…

Abstract

Purpose

This paper aims to explore a framework for implementing Lean Construction (LC) to provide corrective actions for quality defects, customer dissatisfaction and value creation during the construction of megaprojects.

Design/methodology/approach

This paper presents a case study involving the construction of the Mohamed VI Tower in Morocco. It is the tallest tower in Africa, with 55 floors and a total height of 250 m. This study of the quality of the work and the involvement of the LC was carried out using the Define–Measure–Analysis–Improve–Control approach from Lean six sigma. It describes the Critical to Quality and analyses the root causes of quality defects, customer dissatisfaction and variation in the quality process.

Findings

Firstly, the results of this study map the causal factors of lack of quality as established in the literature. Secondly, the LC tools have reduced non-value-added sources of quality waste and, consequently, improved critical quality indicators.

Research limitations/implications

This document focuses on one part of the tower’s construction and is limited to a project case in a country where LC is rarely used.

Originality/value

This study reinforces the literature reviews, surveys and the small number of case studies that have validated the potential of LC and further clarifies future directions for the practical emergence of this quality improvement approach, especially for large-scale projects.

Details

Journal of Financial Management of Property and Construction , vol. 29 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 29 December 2023

Dara Sruthilaya, Aneetha Vilventhan and P.R.C. Gopal

The purpose of this paper is to identify and analyze the interdependence of project complexity factors (PCFs) in metro rail projects using the Decision-Making Trial and Evaluation…

Abstract

Purpose

The purpose of this paper is to identify and analyze the interdependence of project complexity factors (PCFs) in metro rail projects using the Decision-Making Trial and Evaluation Laboratory (DEMATEL). The study provides qualitative and quantitative analysis of project complexities factors and their relationships. The results of the study facilitate effective project planning, proactive risk management and informed decision-making by stakeholders.

Design/methodology/approach

This study employs a case-based method for identifying PCFs and a DEMATEL method for analyzing the interdependence of complexity factors in metro rail projects. Initially, PCFs were identified through an extensive literature review. To validate and refine these factors, semi-structured interviews were conducted with thirty experienced professionals, each having 5–20 years of experience in roles such as project management, engineering, and planning. Further, elevated and underground metro rail projects were purposefully selected as cases, for identifying the similarities and differences in PCFs. A questionnaire survey was conducted with various technical experts in metro rail projects. These experts rated the impact of PCFs on a five-point Likert scale, for the evaluation of the interdependence of PCFs. The DEMATEL technique was used to analyze the interdependencies of the PCFs.

Findings

Metro rail projects are influenced by project complexity, which significantly impacts their performance. The analysis reveals that “design problems with existing structures,” “change in design or construction” and “land acquisition” are the key factors contributing to project complexity.

Originality/value

The study of project complexity in metro rail projects is limited because most of the studies have studies on examining complexity in mega projects. The existing literature lacks adequate attention in identifying project complexity and its effects on metro rail project performance. This research aims to bridge this gap by examining project complexity and interdependencies in metro rail projects.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Content available
Article
Publication date: 19 April 2024

Derek Walker

Abstract

Details

International Journal of Managing Projects in Business, vol. 17 no. 2
Type: Research Article
ISSN: 1753-8378

Article
Publication date: 14 February 2024

Tiep Nguyen, Nicholas Chileshe, Duc Ty Ho, Viet Thanh Nguyen and Quang Phu Tran

Urban rail projects are typically large-scale transport infrastructure projects (megaprojects) which have many potential risks that can influence the strategic goals of owners…

Abstract

Purpose

Urban rail projects are typically large-scale transport infrastructure projects (megaprojects) which have many potential risks that can influence the strategic goals of owners. However, there is a paucity of studies which explore the impact of risks on both “urban rail” project time and cost together considering quantitative assessments. Therefore, this paper focuses on investigating critical risks and quantifying such risk impacts on urban railway project schedule and cost in practice.

Design/methodology/approach

A combination of qualitative and quantitative research methods comprising semi-interviews with five experts and a questionnaire survey of 132 professional respondents is used. The data were modeled using Monte Carlo Simulation to predict the probability of project schedule and cost.

Findings

The results show that 30 risk variables are categorized into seven main groups which have significant impacts on both project time and cost. Outstanding five risk variables were highlighted as follows: (1) project site clearance and land compensation; (2) design changes; (3) physical project resources; (4) contractors’ competencies and (5) project finance. Such findings were supported by Monte Carlo simulation which predicted in the worst case that the project may suffer 11.03 months’ delays and have cost overrun with a contingency of US$287.68 million.

Originality/value

This study expands our knowledge about time and cost contingency of urban metro railway implementation across developing economies and particularly within the context of Vietnam. Policymakers will not only gain an understanding about risk structure but will also recognize the significant impacts of critical risk through risk impact modeling and simulation. Such an approach provides insights into risk treatment priorities for planners so that they can proactively establish suitable strategies for risk mitigation in practice.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 28 February 2023

Helen Dion and Martin Evans

The issue of energy efficiency is becoming increasingly prevalent globally due to factors such as the expansion of the population, economic growth and excessive consumption that…

1243

Abstract

Purpose

The issue of energy efficiency is becoming increasingly prevalent globally due to factors such as the expansion of the population, economic growth and excessive consumption that is not sustainable in the long run. Additionally, healthcare facilities and hospitals are facing challenges as their operational costs continue to rise. The research aim is to develop strategic frameworks for managing green hospitals, towards energy efficiency and corporate governance in hospitals and healthcare facilities.

Design/methodology/approach

This research employs a qualitative case study approach, with a sample of ten hospitals examined through interviews with senior management, executives and healthcare facilities managers. Relevant data was also collected from literature and analysed through critical appraisal and content analysis. The research methodology is based on the use of grounded theory research methodologies to build theories from case studies.

Findings

The research developed three integrated conceptual strategic frameworks for managing hospitals and healthcare facilities towards energy efficiency, green hospital initiatives and corporate governance. The research also outlined the concepts of green hospitals and energy efficiency management systems and best practices based on the conclusions drawn from the investigated case studies.

Research limitations/implications

The study is limited to the initiatives and experiences of the healthcare facilities studied in the Middle East and North Africa (MENA) region.

Originality/value

The research findings, conclusions, recommendations and proposed frameworks and concepts contribute significantly to the existing body of knowledge. This research also provides recommendations for hospital managers and policymakers on how to effectively implement and manage energy efficiency initiatives in healthcare facilities.

Details

Benchmarking: An International Journal, vol. 31 no. 2
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 11 October 2022

Teng Ma and Ya Liu

The role of corporate social responsibility (CSR) fulfillment is critical when building resilience of project-based organizations (PBOs). However, fulfilling CSR to build a highly…

Abstract

Purpose

The role of corporate social responsibility (CSR) fulfillment is critical when building resilience of project-based organizations (PBOs). However, fulfilling CSR to build a highly resilient PBO remains a black box problem. This study explores the different CSR combinations that enhance PBO resilience.

Design/methodology/approach

This study defines CSR in terms of shareholder, employee, and social CSR, and analyzes corporate characteristics in terms of corporate scale and nature. Data are collected from Hexun.com and the China Stock Market and Accounting Research Database (CSMAR). The qualitative comparative analysis (QCA) method is used to analyze 48 listed construction and engineering companies from China to explore the CSR configurations for PBOs in enhancing organizational resilience.

Findings

A large firm size is a necessary condition for high organizational resilience. We find six paths to build high and non-high resilience in PBOs, and the driving mechanisms of high and non-high resilience exhibit an asymmetric relationship.

Research limitations/implications

This study cracks the black box of CSR fulfillment and PBO resilience. It reveals the CSR configurations that enhance or inhibit the resilience of PBOs. It also provides scientific basis for PBOs in their fulfillment of CSR in response to crises, and the enhancement of organizational resilience. Future research can be expanded to other industries, as the study sample is only limited to civil engineering construction companies. Since this study uses cross-sectional data, time series can be introduced in the future to further explore the relationship between CSR and organizational resilience.

Practical implications

This study provides targeted suggestions that can help decision-makers of construction companies to determine how they can fulfill CSR to enhance organizational resilience. At the same time, it can provide intellectual support for PBOs to cope with systemic crises and promote the fulfillment of CSR.

Originality/value

In terms of theoretical value, on the one hand, this study verifies the relationship between CSR fulfillment and PBO resilience, revealing its mechanism of action and multiple paths; on the other hand, it provides a new way of thinking for management research methods and enriches the theoretical study of organizational resilience.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 28 February 2024

Thayla Zomer, Andy Neely and Paulo Savaget

How organisations interact with and respond to environmental pressures has been a long-term interest of organisational scholars. Still, it remains an under-theorised phenomenon…

Abstract

Purpose

How organisations interact with and respond to environmental pressures has been a long-term interest of organisational scholars. Still, it remains an under-theorised phenomenon from a project perspective. So far, there is limited understanding of how projects, which are composed by a constellation of organisations, “respond” to institutional pressures that are exerted on them. This research takes the perspective of projects as adopters/implementers of institutional pressures and analyses how they interact with, and respond to, such pressures. More specifically, this research explores how construction projects respond to the pressure of a Building Information Modelling (BIM) mandate.

Design/methodology/approach

Multiple in-depth case studies were conducted to explore the practical implementation of a BIM mandate in the UK and understand how the construction projects responded to the coercive pressures to implement a new policy mandate for process digitalisation. Multiple sources were employed for data collection and the data were analysed inductively. The findings identify a hybrid response comprising four distinct ways that projects might respond to an institutional pressure.

Findings

We find that projects decouple both from the content and from the intended purpose of a policy, i.e. there are two variance of a policy-practice decoupling phenomenon in projects. The findings also reveal the underlying conditions leading to decoupling.

Originality/value

We advance decoupling literature so that it better applies to the temporary, distributed and interdependent work conducted via projects. Second, we define decoupling in projects as a provisional and fragmented process of wayfinding through heterogeneous institutional spaces, and discuss the potential policy-practice assemblages in projects, influenced by how, if and when project members' activities decouple from the many and often contradicting institutional pressures they face. Third, we discuss how the qualitatively different forms of decoupling that we identified in our work may act as part of a legitimation process in ambiguous situations whereby projects might share a resemblance of conformity with institutional pressures when they are de facto only partially conforming to them.

Details

International Journal of Managing Projects in Business, vol. 17 no. 2
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 6 March 2024

Xian Zheng, Xiao Hu, Chunlin Wu and Ju Bai

Although researchers have long recognized the importance of participating organizations’ (POs) relational behavior for mega construction projects (MCPs) performance, relational…

Abstract

Purpose

Although researchers have long recognized the importance of participating organizations’ (POs) relational behavior for mega construction projects (MCPs) performance, relational behavior may not be executed by POs without effective leadership from project owners. However, little is known about the mechanisms linking owners’ leadership styles to POs’ relational behavior. This study draws on full range leadership theory and role theory to examine the relationships between owners’ leadership styles (i.e. transformational and transactional) and relational behavior. POs’ role orientations (i.e. normative and economic) are considered as potential mediators.

Design/methodology/approach

Data were collected from 175 managers deeply involved in MCPs. Hierarchical regression model and bootstrapping methods were performed on the data to examine the direct effects of owners’ leadership on POs’ relational behavior and the mediating effects of POs’ role orientations.

Findings

The results revealed that both owners’ transformational and transactional leadership positively affect POs’ relational behavior, despite the former being higher than the latter, and indirectly influence relational behavior via POs’ normative and economic role orientation, respectively.

Practical implications

This study provides a clear picture of how owners’ leadership can motivate POs’ relational behavior to achieve high-quality inter-organizational relationships in MCPs. The findings can guide owners’ top manager selection by prioritizing those with transformational leadership, which is beneficial to achieving high-level relational behavior of POs. The results also imply that owners should pay greater attention to cultivating POs’ normative role orientation by encouraging teamwork and open communication to enhance their implementation of relational behavior.

Originality/value

Unlike previous research focusing more on intra-organizational leader–follower relationship within one PO, this study is one of the first to empirically confirm owners’ leadership as a critical antecedent of POs’ relational behavior, thus enhancing the theoretical understanding of inter-organizational relationship management in MCPs. Based on role theory, this study considers a novel organizational psychology mechanism, i.e. POs’ role orientations, as the mediator to unravel how owners’ leadership affects POs’ relational behavior, which was rarely invoked in MCP leadership literature.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of 103