Search results
1 – 10 of 125Adeel Akmal, Nataliya Podgorodnichenko, Richard Greatbanks, Jeff Foote, Tim Stokes and Robin Gauld
The various quality improvement (QI) frameworks and maturity models described in the health services literature consider some aspects of QI while excluding others. This paper aims…
Abstract
Purpose
The various quality improvement (QI) frameworks and maturity models described in the health services literature consider some aspects of QI while excluding others. This paper aims to present a concerted attempt to create a quality improvement maturity model (QIMM) derived from holistic principles underlying the successful implementation of system-wide QI programmes.
Design/methodology/approach
A hybrid methodology involving a systematic review (Phase 1) of over 270 empirical research articles and books developed the basis for the proposed QIMM. It was followed by expert interviews to refine the core constructs and ground the proposed QIMM in contemporary QI practice (Phase 2). The experts included academics in two academic conferences and 59 QI managers from the New Zealand health-care system. In-depth interviews were conducted with QI managers to ascertain their views on the QIMM and its applicability in their respective health organisations (HOs).
Findings
The QIMM consists of four dimensions of organisational maturity, namely, strategic, process, supply chain and philosophical maturity. These dimensions progress through six stages, namely, identification, ad-hoc, formal, process-driven, optimised enterprise and finally a way of life. The application of the QIMM by the QI managers revealed that the scope of QI and the breadth of the principles adopted by the QI managers and their HOs in New Zealand is limited.
Practical implications
The importance of QI in health systems cannot be overstated. The proposed QIMM can help HOs diagnose their current state and provide a guide to action achieving a desirable state of quality improvement maturity. This QIMM avoids reliance on any single QI methodology. HOs – using the QIMM – should retain full control over the process of selecting any QI methodology or may even cherry-pick principles to suit their needs as long as they understand and appreciate the true nature and scope of quality overstated. The proposed QIMM can help HOs diagnose their current state and provide a guide to action achieving a desirable state of quality improvement maturity. This QIMM avoids reliance on any single QI methodology. HOs – using the QIMM – should retain full control over the process of selecting any QI methodology or may even cherry-pick principles to suit their needs as long as they understand and appreciate the true nature and scope of quality.
Originality/value
This paper contributes new knowledge by presenting a maturity model with an integrated set of quality principles for HOs and their extended supply networks.
Details
Keywords
Sara Rashidian, Robin Drogemuller, Sara Omrani and Fereshteh Banakar
The application of integrated project delivery (IPD) in conjunction with building information modeling (BIM) and Lean Construction (LC) as the efficient method for improving…
Abstract
Purpose
The application of integrated project delivery (IPD) in conjunction with building information modeling (BIM) and Lean Construction (LC) as the efficient method for improving collaboration and delivering construction projects has been acknowledged by construction academics and professionals. Once organizations have fully embraced BIM, IPD and LC integration, a measurement tool such as a maturity model (MM) for benchmarking their progress and setting realistic goals for continuous improvement will be required. In the context of MMs literature, however, no comprehensive analysis of these three construction management methods has been published to reveal the current trends and common themes in which the models have approached each other.
Design/methodology/approach
Therefore, this study integrates systematic literature review (SLR) and thematic analysis techniques to review and categorize the related MMs; the key themes in which the interrelationship between BIM, IPD and LC MMs has been discussed and conceptualized in the attributes; the shared characteristics of the existing BIM, IPD and LC MMs, as well as their strengths and limitations. The Preferred Reporting Items for Systematic Reviews (PRISMA) method has been used as the primary procedure for article screening and reviewing published papers between 2007 and 2022.
Findings
Despite the growth of BIM, IPD and LC integration publications and acknowledgment in the literature, no MM has been established that holistically measures BIM, IPD and LC integration in an organization. This study identifies five interrelated and overlapping themes indicative of the collaboration of BIM, IPD and LC in existing MMs' structure, including customer satisfaction, waste minimization, Lean practices and cultural and legal aspects. Furthermore, the MMs' common characteristics, strengths and limitations are evaluated to provide a foundation for developing future BIM, IPD and LC-related MMs.
Practical implications
This paper examines the current status of research and the knowledge gaps around BIM, IPD and LC MMs. In addition, the highlighted major themes serve as a foundation for academics who intend to develop integrated BIM, IPD, and LC MMs. This will enable researchers to build upon these themes and establish a comprehensive list of maturity attributes fulfilling the BIM, IPD and LC requirements and principles. In addition, the MMs' BIM, IPD and LC compatibility themes, which go beyond themes' intended characteristics in silos, increase industry practitioners' awareness of the underlying factors of BIM, IPD and LC integration.
Originality/value
This review article is the first of a kind to analyze the interaction of IPD, BIM and LC in the context of MMs in current AEC literature. This study concludes that BIM, IPD and LC share several joint cornerstones according to the existing MMs.
Details
Keywords
Samuel Foli, Susanne Durst and Serdal Temel
Acknowledging, on the one hand, the increasing fragility of supply chains and the number of risks involved in supply chain operations and, on the other hand, the role of small…
Abstract
Purpose
Acknowledging, on the one hand, the increasing fragility of supply chains and the number of risks involved in supply chain operations and, on the other hand, the role of small- and medium-sized enterprises (SMEs) in supply chains and the high exposure of these firms to risks of different types, this study aims to examine the relationship between supply chain risk management (SCRM) and innovation performance in SMEs. Furthermore, the impact of technological turbulence on this relationship was studied to take into account recent technological changes.
Design/methodology/approach
Structural equation modelling was carried out on a sample of Turkish SMEs to test the hypotheses developed.
Findings
The findings presented allow the authors to better understand the link between SCRM and innovation performance in SMEs. More precisely, empirical evidence is provided about the impact of SCRM components such as maturity and ability on innovation performance. Furthermore, the findings show the impact of technological turbulence on both SCRM and innovation performance.
Originality/value
By focusing on SCRM in SMEs, this paper contributes to the body of knowledge with regard to SCRM in general and with regard to SMEs in particular; research on the latter has only started recently. Moreover, by having studied SMEs from a developing country (other than China), this paper helps to develop a broader and more diverse perspective of SCRM.
Details
Keywords
Vartenie Aramali, George Edward Gibson, Hala Sanboskani and Mounir El Asmar
Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on…
Abstract
Purpose
Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on their technical aspects rather than social. This study aims to hypothesize that improving both the technical maturity of EVMS and the social environment elements of EVMS applications together will significantly impact project performance outcomes. For the first time, empirical evidence supports a strong relationship between EVMS maturity and environment.
Design/methodology/approach
Data was collected from 35 projects through four workshops, attended by 31 industry practitioners with an average of 19 years of EVMS experience. These experts, representing 23 organizations, provided over 2,800 data points on sociotechnical integration and performance outcomes, covering projects totaling $21.8 billion. Statistical analyses were performed to derive findings on the impact of technical maturity and social environment on project success.
Findings
The results show statistically significant differences in cost growth, compliance, meeting project objectives and business drivers and customer satisfaction, between projects with high EVMS maturity and environment and projects with poor EVMS maturity and environment. Moreover, the technical and social dimensions were found to be significantly correlated.
Originality/value
Key contributions include a novel and tested performance-driven framework to support integrated project management using EVMS. The adoption of this detailed assessment framework by government and industry is driving a paradigm shift in project management of some of the largest and most complex projects in the U.S.; specifically transitioning from a project assessment based upon a binary approach for EVMS technical maturity (i.e. compliant/noncompliant to standards) to a wide-ranging scale (i.e. 0–1,000) across two dimensions.
Details
Keywords
Miguel Calvo and Marta Beltrán
This paper aims to propose a new method to derive custom dynamic cyber risk metrics based on the well-known Goal, Question, Metric (GQM) approach. A framework that complements it…
Abstract
Purpose
This paper aims to propose a new method to derive custom dynamic cyber risk metrics based on the well-known Goal, Question, Metric (GQM) approach. A framework that complements it and makes it much easier to use has been proposed too. Both, the method and the framework, have been validated within two challenging application domains: continuous risk assessment within a smart farm and risk-based adaptive security to reconfigure a Web application firewall.
Design/methodology/approach
The authors have identified a problem and provided motivation. They have developed their theory and engineered a new method and a framework to complement it. They have demonstrated the proposed method and framework work, validating them in two real use cases.
Findings
The GQM method, often applied within the software quality field, is a good basis for proposing a method to define new tailored cyber risk metrics that meet the requirements of current application domains. A comprehensive framework that formalises possible goals and questions translated to potential measurements can greatly facilitate the use of this method.
Originality/value
The proposed method enables the application of the GQM approach to cyber risk measurement. The proposed framework allows new cyber risk metrics to be inferred by choosing between suggested goals and questions and measuring the relevant elements of probability and impact. The authors’ approach demonstrates to be generic and flexible enough to allow very different organisations with heterogeneous requirements to derive tailored metrics useful for their particular risk management processes.
Details
Keywords
Anna Trubetskaya, Alan Ryan and Frank Murphy
This paper aims to introduce a model using a digital twin concept in a cold heading manufacturing and develop a digital visual management (VM) system using Lean overall equipment…
Abstract
Purpose
This paper aims to introduce a model using a digital twin concept in a cold heading manufacturing and develop a digital visual management (VM) system using Lean overall equipment effectiveness (OEE) tool to enhance the process performance and establish Fourth Industrial Revolution (I4.0) platform in small and medium enterprises (SMEs).
Design/methodology/approach
This work utilised plan, do, check, act Lean methodology to create a digital twin of each machine in a smart manufacturing facility by taking the Lean tool OEE and digitally transforming it in the context of I4.0. To demonstrate the effectiveness of process digitisation, a case study was carried out at a manufacturing department to provide the data to the model and later validate synergy between Lean and I4.0 platform.
Findings
The OEE parameter can be increased by 10% using a proposed digital twin model with the introduction of a Level 0 into VM platform to clearly define the purpose of each data point gathered further replicate in projects across the value stream.
Research limitations/implications
The findings suggest that researchers should look beyond conversion of stored data into visualisations and predictive analytics to improve the model connectivity. The development of strong big data analytics capabilities in SMEs can be achieved by shortening the time between data gathering and impact on the model performance.
Originality/value
The novelty of this study is the application of OEE Lean tool in the smart manufacturing sector to allow SME organisations to introduce digitalisation on the back of structured and streamlined principles with well-defined end goals to reach the optimal OEE.
Details
Keywords
Mohammad Hossein Zolfaghar Arani, Mahmoud Lari Dashtbayaz and Mahdi Salehi
This study aims to determine the contributing factors to technical knowledge valuation at the related quadruple levels of commercialisation, including the idea, benchtop technical…
Abstract
Purpose
This study aims to determine the contributing factors to technical knowledge valuation at the related quadruple levels of commercialisation, including the idea, benchtop technical knowledge, prototype technical knowledge and commercialised technical knowledge, and then classify the factors by the valuation objectives.
Design/methodology/approach
The study method is descriptive-causal, and documentation tools of published scientific research articles in authentic local and international journals were used to extract the contributing factors to technical knowledge valuation. Moreover, the Likert spectrum-based questionnaire is used to determine the weight of each determined component. On the other hand, hierarchical analysis is used based on the extracted results from the distributed classification questionnaire among scholars to determine the allocable weight of each component.
Findings
The results indicate that at the idea step, the highest ranks among the contributing factors to technical knowledge valuation are for the indicators of innovation rate enhancement, novelty, creation of new products, profitability growth and dependence decline. In the benchtop technical knowledge step, the indicators of profitability growth, product quality enhancement, novelty, production risk drop, innovation rate enhancement, production costs drop, product price competitiveness and independence from rare machinery have the highest impact coefficients on valuation. Moreover, the prioritisation of factors in prototype technical knowledge shows that the indicators of productive risk decline, infrastructure, decrease in product delivery time, productivity growth and profitability growth are the most critical factors in technical knowledge valuation. Finally, profitability growth factors, production cost drop, productive risk drop, creating a new product, product price competitiveness and dependence decline determine the most valuable technical knowledge in the commercialisation phase.
Research limitations/implications
The most salient innovation of the study involves the development levels of technical knowledge in the commercialisation cycle for determining the contributing factors to technical knowledge valuation and using multivariate decision-making methods to classify the so-called factors. The major limitation can be the context of the study because the paper was carried out by Iranian assessors and specialists using the experiences, opinions and approaches of opinion leaders based on the dominant social, cultural and accounting background of a developing country, not a developed one.
Originality/value
This paper is applicable because it elucidates the technical knowledge valuation factors for managers and owners of technological and knowledge-based companies to facilitate value determination and register the technical knowledge of innovative products in financial statements for the logical presentation of available intangible assets in the economic unit. Besides, in the high-tech area, collecting information from the contributing factors to technical knowledge valuation provides an opportunity to support intellectual property rights and facilitate transaction processes. Finally, in legal areas, in cases of breaching intellectual property rights relative to technical knowledge, the determination of technical knowledge value provides a solid basis for estimating the damage rate.
Details
Keywords
Giulia Piantoni, Laura Dell'Agostino, Marika Arena and Giovanni Azzone
Measuring shared value (SV) created in innovation ecosystems (IEs) is increasingly relevant but complex, given the multidimensional and multiactor nature of both concepts, which…
Abstract
Purpose
Measuring shared value (SV) created in innovation ecosystems (IEs) is increasingly relevant but complex, given the multidimensional and multiactor nature of both concepts, which challenges traditional performance measurement systems (PMSs). Moving from this gap, the authors propose an integrated approach to extend the balanced scorecard (BSC) for measuring and monitoring SV creation at IE level.
Design/methodology/approach
The proposed approach combines the most recent contributions on PMS in IEs and SV to define perspectives and dimensions that are better suited to deal with the nature of both IEs and SV. The approach is also applied to the real case (Alpha) of an Italian IE through a step wise method. Starting from the IE vision, the authors identify in the strategy map the specific objectives related to each perspective/dimension combination and then associate a performance indicator with each objective.
Findings
The resulting SV BSC is composed of indicators interconnected along different perspectives and dimensions. The application of the approach to the real case proves its feasibility and highlights characteristics, advantages and disadvantages of the SV BSC when used at IE level. The authors also provide guidelines for its application to other IEs.
Originality/value
The study contributes to the research on PMS by introducing and applying to a real case an integrated approach to assess SV in IEs, overcoming the shortcomings of PMS framed for single firms. It can be of interest for both researchers in the field of ecosystems value creation and practitioners managing or promoting such complex structures.
Details