Search results
1 – 10 of over 1000Søren Skjold Andersen, Mahesh C. Gupta and Diego Augusto de Jesus Pacheco
Charles Sanders Peirce (1839–1914), recognized as the father of philosophical pragmatism, has been described as a philosopher’s philosopher. Eliyahu Moshe Goldratt (1947–2011)…
Abstract
Purpose
Charles Sanders Peirce (1839–1914), recognized as the father of philosophical pragmatism, has been described as a philosopher’s philosopher. Eliyahu Moshe Goldratt (1947–2011), considered the father of the management philosophy theory of constraints (TOC), has been described as being, first and foremost, a philosopher. The TOC body of knowledge is mainly preserved as concrete methodologies used in the management discipline. By examining the foundational elements of synechism and the TOC, the purpose of this study is to investigate the intellectual connections between the arguments and legacies of Goldratt and Peirce. Although this connection is worthy of much further investigation, the research emphasizes the possible implications from a management philosophy perspective.
Design/methodology/approach
Based on a “review with an attitude,” the authors first examined the foundations of Goldratt’s TOC through the lens of Peirce’s synechism. Next, the authors then examined how the study of Peirce combined with a selection of contemporary research in the management and organizational studies domain could point out a direction toward completing Goldratt’s unfinished intellectual work to establish a unified science management while addressing some of the current gaps in the TOC body of knowledge.
Findings
Major findings show that synechism’s growth may extend TOC knowledge, improving managerial practice in organizations. Findings on the convergent ideas of both also reveal that Goldratt valued all synechism categories, emphasizing the importance of not overlooking Firstness. Furthermore, the study analyzes the abductive inference demonstrated in the two use cases, introducing an additional metaphor to the management of organizational systems inspired by Peirce’s philosophical concepts. The research concludes that incorporating TOC and synechism principles can enhance management and organizational practices and enrich management philosophy and theories.
Research limitations/implications
This pioneering research opens promising opportunities to draw parallels between Peirce and Goldratt. Interdisciplinary collaboration will enhance the rigor and validity of integrating synechism and TOC. Experts in organizational behavior, systems theory and complexity science can provide valuable insights into this debate, while practitioners and consultants could help identify barriers and opportunities for integrating synechistic principles.
Practical implications
The study proposes a novel abductive approach using Peirce’s cable metaphor as an initial framework to build a unified science of management based on evolutionary stages: TOC, common sense and connectedness.
Originality/value
This research reinforces the argument that contemporary management practices need philosophical thinking. The authors argue that re-evaluating the foundations of management thought enriches the decision-making process in organizations and the understanding of contemporary theories in management and organizational studies.
Details
Keywords
Kai Liu, Yuming Liu, Yuanyuan Kou and Xiaoxu Yang
The mega railway infrastructure projects are faced with complex environments and multi-level management challenges. Thus, the mega railway infrastructure project management system…
Abstract
Purpose
The mega railway infrastructure projects are faced with complex environments and multi-level management challenges. Thus, the mega railway infrastructure project management system not only needs to focus on its composition, but also needs to consider changes and impacts of internal and external environment.
Design/methodology/approach
This study attempts to introduce the concept of dissipative structure from the perspective of complexity theory and constructs a positive entropy and negentropy flow index system for mega railway infrastructure project management system in order to analyze the factors of management system more deeply. The Brusselator model is used to construct the structure of the mega railway infrastructure project management system, and the entropy method is used to calculate the positive entropy and negentropy values to verify whether the management system is a dissipative structure.
Findings
A plateau railway project in China was used as an example for an empirical study, not only its own characteristics are analyzed, but also the role of constraints and facilitation of the internal and external environment. Based on the research results, several effective suggestions are put forward to improve the stability and work efficiency of mega railway infrastructure project management system.
Originality/value
This study demonstrates that mega railway infrastructure project management system has the characteristics of dissipative structure. It can provide theoretical support for the development of mega railway infrastructure project management system from disorderly state to orderly state.
Details
Keywords
Thabo Khafiso, Clinton Aigbavboa and Samuel Adeniyi Adekunle
This study aims to examine the challenges in the implementation of energy management systems in residential buildings to lower the running cost and achieve a better…
Abstract
Purpose
This study aims to examine the challenges in the implementation of energy management systems in residential buildings to lower the running cost and achieve a better energy-efficient building.
Design/methodology/approach
This study adopted a mixed research method. Quantitative data was gathered by issuing a research questionnaire to 20 Delphi experts, while qualitative data was acquired through a Systematic Literature Review. Data received was analyzed using the descriptive analysis method.
Findings
The findings revealed that the main barriers to incorporating energy management systems (EMSs) in residential buildings consist of a lack of awareness of energy management systems, lack of management commitment to energy management, lack of knowledge about energy management systems, lack of funds for energy management systems, resistance to energy management technology by the property owners and property managers, distrust and resistance to energy management technology by the property owners, high initial cost of energy management technologies, shortage of technicians for energy management technologies, the nonexistence of local manufacturers of energy management equipment, lack of incentives for efficient energy management and high repair costs of energy management technologies.
Research limitations/implications
The specific focus on residential buildings may limit the applicability of findings to commercial or industrial sectors. Further research is warranted to accommodate other energy-consuming sectors.
Practical implications
People’s perceptions, either wrong or correct, affect their ability to make an informed decision to adopt energy management systems, denying them the opportunity to reap the associated benefits. Therefore, there is an urgent need for the residential industry stakeholders and the government to increase educational opportunities for property owners, managers and property tenants on the importance of energy management systems.
Originality/value
This research presents the potential obstacles and problematic areas that residents may encounter while using these energy management systems. Consequently, they will be able to make a well-informed choice when installing energy management systems. Moreover, the research elucidates the identification of novel perspectives and also unexamined obstacles that impede the widespread use of energy management systems in residential buildings.
Details
Keywords
Vartenie Aramali, George Edward Gibson, Hala Sanboskani and Mounir El Asmar
Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on…
Abstract
Purpose
Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on their technical aspects rather than social. This study aims to hypothesize that improving both the technical maturity of EVMS and the social environment elements of EVMS applications together will significantly impact project performance outcomes. For the first time, empirical evidence supports a strong relationship between EVMS maturity and environment.
Design/methodology/approach
Data was collected from 35 projects through four workshops, attended by 31 industry practitioners with an average of 19 years of EVMS experience. These experts, representing 23 organizations, provided over 2,800 data points on sociotechnical integration and performance outcomes, covering projects totaling $21.8 billion. Statistical analyses were performed to derive findings on the impact of technical maturity and social environment on project success.
Findings
The results show statistically significant differences in cost growth, compliance, meeting project objectives and business drivers and customer satisfaction, between projects with high EVMS maturity and environment and projects with poor EVMS maturity and environment. Moreover, the technical and social dimensions were found to be significantly correlated.
Originality/value
Key contributions include a novel and tested performance-driven framework to support integrated project management using EVMS. The adoption of this detailed assessment framework by government and industry is driving a paradigm shift in project management of some of the largest and most complex projects in the U.S.; specifically transitioning from a project assessment based upon a binary approach for EVMS technical maturity (i.e. compliant/noncompliant to standards) to a wide-ranging scale (i.e. 0–1,000) across two dimensions.
Details
Keywords
B.H.V.H. Jayamaha, B.A.K.S. Perera, K.D.M. Gimhani and M.N.N. Rodrigo
Enterprise resource planning (ERP) systems that are equipped with numerous features and functionalities help to improve the profitability of construction corporations around the…
Abstract
Purpose
Enterprise resource planning (ERP) systems that are equipped with numerous features and functionalities help to improve the profitability of construction corporations around the world through enhancing the efficiency of the functions related to cost management. Thus, the purpose of this study was to investigate the applicability of ERP systems for cost management of building construction projects in Sri Lanka.
Design/methodology/approach
A qualitative technique was used in this study, which comprised two-round Delphi-based semistructured interviews. Purposive sampling was used to determine the interviewees. Content analysis was used to evaluate the collected data.
Findings
The findings of this study identified the ERP system as a strategic tool for gaining a competitive advantage for an organization while confirming 14 uses of ERP systems and 16 stages of the cost management process. Eighteen issues were finalized at the end of the interview rounds while categorizing the suitable ERP applications at each stage of the cost management process.
Originality/value
Even though there are numerous distinct studies conducted on cost management and ERP systems, there has been a lack of studies conducted on the synergy between these two areas that can be adapted for the building projects in the Sri Lankan context. Therefore, the findings of this study can bring a new paradigm to the Sri Lankan construction sector by influencing the adaption of correct ERP systems at numerous project stages by providing a competitive edge.
Details
Keywords
Petra Pekkanen and Timo Pirttilä
The aim of this study is to empirically explore and analyze the concrete tasks of output measurement and the inherent challenges related to these tasks in a traditional and…
Abstract
Purpose
The aim of this study is to empirically explore and analyze the concrete tasks of output measurement and the inherent challenges related to these tasks in a traditional and autonomous professional public work setting – the judicial system.
Design/methodology/approach
The analysis of the tasks is based on a categorization of general performance measurement motives (control-motivate-learn) and main stakeholder levels (society-organization-professionals). The analysis is exploratory and conducted as an empirical content analysis on materials and reports produced in two performance improvement projects conducted in European justice organizations.
Findings
The identified main tasks in the different categories are related to managing resources, controlling performance deviations, and encouraging improvement and development of performance. Based on the results, key improvement areas connected to output measurement in professional public organizations are connected to the improvement of objectivity and fairness in budgeting and work allocation practices, improvement of output measures' versatility and informativeness to highlight motivational and learning purposes, improvement of professional self-management in setting output targets and producing outputs, as well as improvement of organizational learning from the output measurement.
Practical implications
The paper presents empirically founded practical examples of challenges and improvement opportunities related to the tasks of output measurement in professional public organization.
Originality/value
This paper fulfils an identified need to study how general performance management motives realize as concrete tasks of output measurement in justice organizations.
Details
Keywords
Rami Alkhudary and Paul Gardiner
This paper explores how blockchain technology can enhance information quality within project management information systems (PMIS), thereby positively affecting knowledge…
Abstract
Purpose
This paper explores how blockchain technology can enhance information quality within project management information systems (PMIS), thereby positively affecting knowledge management, learning capabilities and project portfolio success.
Design/methodology/approach
We employ a literature review and a theory-based approach to develop a conceptual framework and set of propositions that integrate key principles from blockchain technology, project management and dynamic capabilities theory. Subsequently, a focus group is conducted to refine our propositions, providing insights and examples demonstrating the potential value of blockchain in project management.
Findings
The findings suggest that blockchain significantly impacts the information quality within PMIS. This improvement in information quality enhances traceability, reliability and security of project data, facilitating better decision-making and governance. The focus group revealed blockchain’s benefits in managing confidential data and streamlining knowledge sharing processes, ultimately contributing to project portfolio success.
Originality/value
This research offers a novel conceptual framework and original insights into the application of blockchain in project management, particularly within the context of Industry 4.0, paving the way for future research on digital transformation in project management.
Details
Keywords
Anna Prenestini, Stefano Calciolari and Arianna Rota
During the 1990s, Italian healthcare organisations (HOs) underwent a process of corporatisation, and the most innovative HOs introduced the balanced scorecard (BSC) to address the…
Abstract
Purpose
During the 1990s, Italian healthcare organisations (HOs) underwent a process of corporatisation, and the most innovative HOs introduced the balanced scorecard (BSC) to address the need for broader accountability. Currently, there is a limited understanding of the dynamics and outcomes of such a process. Therefore, this study aims to explore whether the BSC is still considered an effective performance management tool and analyse the factors driving and hindering its evolution and endurance in public and non-profit HOs.
Design/methodology/approach
We conducted a retrospective longitudinal analysis of two pioneering cases in the adoption of the BSC: one in a public hospital and the other in a non-profit hospital. Data collection relied on accessing institutional documents and reports from the early 2000s to the present, as well as conducting semi-structured interviews with the internal sponsors of the BSC.
Findings
We found evidence of three main categories of factors that trigger or hinder the adoption and development of the BSC: (1) the role of the internal sponsor and professionals’ commitment; (2) information technology and the controller’s technological skills; and (3) the relationship between the management and professionalism logics during the implementation process. At the same time, there is no evidence to suggest that specific technical features of the BSC influence its endurance.
Originality/value
The paper contributes to the debate on the key factors for implementing and sustaining multidimensional control systems in professional organisations. It emphasises the importance of knowledge-based assets and distinctive internal capabilities for the success of the business. The implications of the BSC legacy are discussed, along with future developments of multidimensional control tools aimed at supporting strategy execution.
Details
Keywords
Minggong Zhang, Xiaolong Xue, Ting Luo, Mengmeng Li and Xiaoling Tang
This study aims to establish an evaluation method for cross-regional major infrastructure project (CRMIP) supportability. The focus is to identify evaluation indicators from a…
Abstract
Purpose
This study aims to establish an evaluation method for cross-regional major infrastructure project (CRMIP) supportability. The focus is to identify evaluation indicators from a complexity perspective and develop an evaluation model using qualitative and quantitative methods. Case studies are carried out to verify the reliability of the evaluation model, thereby providing theoretical and practical guidance for CRMIP operations and maintenance (O&M).
Design/methodology/approach
Guided by the idea of complexity management, the evaluation indicators of CRMIP supportability are determined through literature analysis, actual O&M experience and expert interviews. A combination of qualitative and quantitative methods, consisting of sequential relationship analysis, entropy weighting, game theory and cloud model, is developed to determine the indicator weights. Finally, the evaluation model is used to evaluate the supportability of the Hong Kong–Zhuhai–Macao Bridge (HZMB), which tests the rationality of the model and reveals its supportability level.
Findings
The results demonstrate that CRMIPs' supportability is influenced by 6 guideline-level and 18 indicator-level indicators, and the priority of the influencing factors includes “organization,” “technology,” “system,” “human resources,” “material system,” and “funding.” As for specific indicators, “organizational objectives,” “organizational structure and synergy mechanism,” and “technical systems and procedures” are critical to CRMIPs' O&M supportability. The results also indicate that the supportability level of the HZMB falls between good and excellent.
Originality/value
Under the guidance of complexity management thinking, this study proposes a supportability evaluation framework based on the combined weights of game theory and the cloud model. This study provides a valuable reference and scientific judgment for the health and safety of CRMIPs' O&M.
Details
Keywords
In today’s rapidly evolving business landscape, innovation is the cornerstone for every organization. Knowledge management (KM) is crucial for developing sustainable competitive…
Abstract
Purpose
In today’s rapidly evolving business landscape, innovation is the cornerstone for every organization. Knowledge management (KM) is crucial for developing sustainable competitive advantage by fostering innovation. This study aims to identify the key drivers of KM in the context of digital transformation through qualitative research.
Design/methodology/approach
This study employs a qualitative approach based on in-depth interviews with senior KM officers, including chief knowledge officers and directors who spearhead KM in their respective organizations. This research identifies four key dimensions, shedding new light on the drivers of KM in the context of digital transformation.
Findings
This study’s findings reveal that the integration of important drivers from the lens of social-technical system (STS) theory is categorized into the four dimensions of KM, namely, motivation, technology, people interaction and organizational drivers. These factors jointly impact and design the effectiveness of KM in the digital age.
Originality/value
This study makes a unique contribution to the field of digital transformation. It presents a conceptual framework from the lens of the STS theory that encompasses four critical dimensions of KM: motivation, technology, people interaction and organizational dimensions, each with sub-codes. This framework can be utilized by practitioners and scholars alike.
Details