Open Access
Article
Publication date: 30 April 2024

Beheshte Momeni, Mario Rapaccini and Miia Martinsuo

Manufacturers face various challenges and risks during their digital servitization (DS), due to the complexity caused by introducing breakthrough technologies, increasingly…

Abstract

Purpose

Manufacturers face various challenges and risks during their digital servitization (DS), due to the complexity caused by introducing breakthrough technologies, increasingly complex product-service solutions and new stakeholders in the business network. The process necessitates the implementation of various changes that usually happen over a long period of time. Using complexity management as a theoretical lens, this paper delves into manufacturers’ DS journeys and explores how manufacturers manage the associated complexities.

Design/methodology/approach

This paper investigates the DS journey of two manufacturers in a longitudinal case study from 2014 to 2021.

Findings

Three main complexity management actions during the DS journey were identified: shaping the digital service system, shaping the organization and shaping the network. Tied to different types of complexities, these actions demonstrate how manufacturers navigate their journey. The findings also reveal different complexity management approaches used at the different stages of this journey.

Originality/value

This paper offers a comprehensive framework for understanding complexity management in the DS journey, including the types of complexities, complexity management actions and complexity management approaches and their rationale. This paper shows that different requirements are created during emerge, consolidate and evolve stages of the DS journey. Manufacturers need a dynamic approach that considers changes in complexities and actions over time.

Details

Journal of Manufacturing Technology Management, vol. 35 no. 9
Type: Research Article
ISSN: 1741-038X

Keywords

Article
Publication date: 8 January 2024

Kavita Bhangale, Kanchan Joshi, Ruchita Gupta and Bhaskar Gardas

Project complexity (PC) governs project success, but the project management literature primarily focuses on performance measures and rarely examines the complexity factors…

Abstract

Purpose

Project complexity (PC) governs project success, but the project management literature primarily focuses on performance measures and rarely examines the complexity factors, especially for megaprojects. This paper aims to determine the most significant complexity factors for the railway megaprojects in India.

Design/methodology/approach

A mixed approach using the Delphi and best–worst method (BWM) helped to identify, validate and determine the most critical factors that require intervention to diminish variance from project performance.

Findings

The BWM resulted in stakeholder management, followed by organizational and technological complexity as significant complexity factors, and the varied interests of the stakeholder as the most important among the 40 subfactors.

Practical implications

The finding indicates the necessity for strategic, tactical and operational-level interventions to effectively manage the complexity affecting project efficiency because of the varied stakeholders. This paper will guide the project and general managers to prioritize their resources to handle complexity for effective project performance measured in terms of time, cost and quality and help them make strategic decisions. The research findings of this study are expected to help researchers and practitioners in better planning and smoother execution of projects. In addition, this study would help the researchers formulate policies and strategies for better handling of the projects.

Originality/value

This study adds significant value to the body of knowledge related to PC in megaprojects in developing countries. The result of the investigation underlined that nine complexity factors and seven unique subfactors, namely, the sustainable environment, timely availability of information, communication in both directions, interdepartmental dependency and coordination, design, statutory norms, site challenges, socioeconomic conditions, the tendency of staff to accept new technology and the frequent changes in the requirements of stakeholders are significant in railway megaprojects. The BWM is applied to rank the complexity factors and subfactors in the case area.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 11 October 2021

Sharareh Kermanshachi, Thahomina Jahan Nipa and Bac Dao

The purpose of this study is to ascertain and list the most effective management strategies in efficiently handling the project complexities to enhance the performance of the…

Abstract

Purpose

The purpose of this study is to ascertain and list the most effective management strategies in efficiently handling the project complexities to enhance the performance of the project.

Design/methodology/approach

To fulfill the aim of this study, a comprehensive literature review was conducted, and the qualitative Delphi technique in two rounds was applied. Participants of the Delphi technique consisted of 12 subject matter experts (SMEs) with cumulative experience of 250 years in working in construction projects. In the first round of the Delphi technique, SMEs were asked to provide complexity management strategies to address the complexities due to 37 complexity indicators (CIs) under 11 complexity categories. In the second round of the Delphi technique, SMEs identified the top three management strategies for each of the 37 CIs.

Findings

This study collected the outcome of the two-round Delphi technique and based on the output developed the list of strategies to manage complexities related to each indicator. For example, establishing a well-informed governance team, assigning a Project Manager (PM) when the number of projects is more than one in an organization, and assigning a PM efficient enough to communicate with higher authority effectively will help in managing complexity that arises due to faulty assessment of the influence of a project on the organization’s overall success.

Originality/value

This study will help practitioners in effectively managing the project complexities, and thus will reduce the monetary loss associated with project complexities.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 6
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 29 December 2023

Dara Sruthilaya, Aneetha Vilventhan and P.R.C. Gopal

The purpose of this paper is to identify and analyze the interdependence of project complexity factors (PCFs) in metro rail projects using the Decision-Making Trial and Evaluation…

Abstract

Purpose

The purpose of this paper is to identify and analyze the interdependence of project complexity factors (PCFs) in metro rail projects using the Decision-Making Trial and Evaluation Laboratory (DEMATEL). The study provides qualitative and quantitative analysis of project complexities factors and their relationships. The results of the study facilitate effective project planning, proactive risk management and informed decision-making by stakeholders.

Design/methodology/approach

This study employs a case-based method for identifying PCFs and a DEMATEL method for analyzing the interdependence of complexity factors in metro rail projects. Initially, PCFs were identified through an extensive literature review. To validate and refine these factors, semi-structured interviews were conducted with thirty experienced professionals, each having 5–20 years of experience in roles such as project management, engineering, and planning. Further, elevated and underground metro rail projects were purposefully selected as cases, for identifying the similarities and differences in PCFs. A questionnaire survey was conducted with various technical experts in metro rail projects. These experts rated the impact of PCFs on a five-point Likert scale, for the evaluation of the interdependence of PCFs. The DEMATEL technique was used to analyze the interdependencies of the PCFs.

Findings

Metro rail projects are influenced by project complexity, which significantly impacts their performance. The analysis reveals that “design problems with existing structures,” “change in design or construction” and “land acquisition” are the key factors contributing to project complexity.

Originality/value

The study of project complexity in metro rail projects is limited because most of the studies have studies on examining complexity in mega projects. The existing literature lacks adequate attention in identifying project complexity and its effects on metro rail project performance. This research aims to bridge this gap by examining project complexity and interdependencies in metro rail projects.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Open Access
Article
Publication date: 12 January 2024

Patrik Jonsson, Johan Öhlin, Hafez Shurrab, Johan Bystedt, Azam Sheikh Muhammad and Vilhelm Verendel

This study aims to explore and empirically test variables influencing material delivery schedule inaccuracies?

Abstract

Purpose

This study aims to explore and empirically test variables influencing material delivery schedule inaccuracies?

Design/methodology/approach

A mixed-method case approach is applied. Explanatory variables are identified from the literature and explored in a qualitative analysis at an automotive original equipment manufacturer. Using logistic regression and random forest classification models, quantitative data (historical schedule transactions and internal data) enables the testing of the predictive difference of variables under various planning horizons and inaccuracy levels.

Findings

The effects on delivery schedule inaccuracies are contingent on a decoupling point, and a variable may have a combined amplifying (complexity generating) and stabilizing (complexity absorbing) moderating effect. Product complexity variables are significant regardless of the time horizon, and the item’s order life cycle is a significant variable with predictive differences that vary. Decoupling management is identified as a mechanism for generating complexity absorption capabilities contributing to delivery schedule accuracy.

Practical implications

The findings provide guidelines for exploring and finding patterns in specific variables to improve material delivery schedule inaccuracies and input into predictive forecasting models.

Originality/value

The findings contribute to explaining material delivery schedule variations, identifying potential root causes and moderators, empirically testing and validating effects and conceptualizing features that cause and moderate inaccuracies in relation to decoupling management and complexity theory literature?

Details

International Journal of Operations & Production Management, vol. 44 no. 13
Type: Research Article
ISSN: 0144-3577

Keywords

Article
Publication date: 2 February 2024

Quntao Wu, Qiushi Bo, Lan Luo, Chenxi Yang and Jianwang Wang

This study aims to obtain governance strategies for managing the complexity of megaprojects by analyzing the impact of individual factors and their configurations using the…

Abstract

Purpose

This study aims to obtain governance strategies for managing the complexity of megaprojects by analyzing the impact of individual factors and their configurations using the fuzzy-set qualitative comparative analysis (fsQCA) method and to provide references for project managers.

Design/methodology/approach

With the continuous development of the economy, society and construction industry, the number and scale of megaprojects are increasing, and the complexity is becoming serious. Based on the relevant literature, the factors affecting the complexity of megaprojects are determined through case analysis, and the paths of factors affecting the complexity are constructed for megaprojects. Then, the fsQCA method is used to analyze the factors affecting the complexity of megaprojects through 245 valid questionnaires from project engineers in this study.

Findings

The results support the correlation between the complexity factors of megaprojects, with six histological paths leading to high complexity and seven histological paths leading to low complexity.

Originality/value

It breaks the limitations of the traditional project complexity field through a “configuration perspective” and concludes that megaproject complexity is a synergistic effect of multiple factors. The study is important for enriching the theory of megaproject complexity and providing complexity governance strategies for managers in megaproject decision-making.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 21 July 2023

Tillmann Boehme, Joshua Fan, Thomas Birtchnell, James Aitken, Neil Turner and Eric Deakins

Delivering housing to resource-constrained communities (RCCs) is a complex process beset with difficulties. The purpose of this study is to use a complexity lens to examine the…

Abstract

Purpose

Delivering housing to resource-constrained communities (RCCs) is a complex process beset with difficulties. The purpose of this study is to use a complexity lens to examine the approach taken by a social enterprise (SE) in Australia to develop and manage a housebuilding supply chain for RCCs.

Design/methodology/approach

The research team used a longitudinal case study approach from 2017 to 2022, which used mixed methods to understand the phenomenon and gain an in-depth understanding of the complex issues and problem-solving undertaken by an SE start-up.

Findings

Balancing mission logic with commercial viability is challenging for an SE. The supply chain solution that evolved accommodated the particulars of geography and the needs of many stakeholders, including the end-user community and government sponsors. Extensive and time-consuming socialisation and customisation led to a successful technical design and sustainable supply chain operation.

Practical implications

Analysing supply chain intricacies via a complexity framework is valuable for scholars and practitioners, assisting in designing and developing supply chain configurations and understanding their dynamics. Meeting the housing construction needs of RCCs requires the SE to place societal focus at the centre of the supply chain rather than merely being a system output. The developed business model complements the engineering solution to empower a community-led housing construction supply chain.

Originality/value

This longitudinal case study contributes to knowledge by providing rich insights into the roles of SEs and how they develop and operate supply chains to fit with the needs of RCCs. Adding a contextual response dimension to an established complexity framework helped to explain how hybrid organisations balance commercial viability demands with social mission logic by amending traditional supply chain and governance practices. The case provides insights into supply chain configuration, needed changes and potential impacts when an SE as a focal actor inserts into a traditional for-profit construction supply chain.

Details

Supply Chain Management: An International Journal, vol. 29 no. 1
Type: Research Article
ISSN: 1359-8546

Keywords

Article
Publication date: 9 January 2024

Dara Sruthilaya, Aneetha Vilventhan and P.R.C. Gopal

The purpose of this research is to develop a project complexity index (PCI) model using the best and worst method (BWM) to quantitatively analyze the impact of project…

Abstract

Purpose

The purpose of this research is to develop a project complexity index (PCI) model using the best and worst method (BWM) to quantitatively analyze the impact of project complexities on the performance of metro rail projects.

Design/methodology/approach

This study employed a two-phase research methodology. The first phase identifies complexities through a literature review and expert discussions and categorizes different types of complexities in metro rail projects. In the second phase, BWM, a robust multi-criteria decision-making (MCDM) technique, was used to prioritize key complexities, and a PCI model was developed. Further, the developed PCI was validated through case studies, and sensitivity analysis was performed to check the accuracy and applicability of the developed PCI model.

Findings

The analysis revealed that location complexity exerted the most substantial influence on project performance, followed by environmental, organizational, technological and contractual complexities. Sensitivity analysis revealed the varying impacts of complexity indices on the overall project complexity.

Practical implications

The study's findings offer a novel approach for measuring project complexity's impact on metro rail projects. This allows stakeholders to make informed decisions, allocate resources efficiently and plan strategically.

Originality/value

The existing studies on project complexity identification and quantification were limited to megaprojects other than metro rail projects. Efforts to quantitatively study and analyze the impact of project complexity on metro rail projects are left unattended. The developed PCI model and its validation contribute to the field by providing a definite method to measure and manage complexity in metro rail projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 2 November 2022

Dharmendra Hariyani and Sanjeev Mishra

Scarcity of resources, ecological imbalance, global warming, rising energy prices and the ever-changing need for variety have attracted the government and manufacturers for…

Abstract

Purpose

Scarcity of resources, ecological imbalance, global warming, rising energy prices and the ever-changing need for variety have attracted the government and manufacturers for sustainable development of the industries. The integrated sustainable-green-lean-six sigma-agile manufacturing system (ISGLSAMS) provides a solid platform for meeting both the customers’ variety needs and business sustainability requirements. Many organizations opted for ISGLSAMS, but still due to various barriers organizations are not able to fully implement ISGLSAMS. The purpose of this paper is to identify the barriers to the ISGLSAMS, so that a more sustainable industrial manufacturing system and industrial symbiosis can be developed.

Design/methodology/approach

A literature review, from the Web of Science and Google Scholar database, has been carried out to identify the various barriers to the implementation of ISGLSAMS in the entire value chain. A total of 168 research papers have been reviewed for identifying the ISGLSAMS barriers.

Findings

This paper elaborates the concept of the ISGLSAMS, its attributes and various barriers and contributes to a better understanding and successful implementation of ISGLSAMS to meet business’ sustainability and market performance goals in the entire value chain. The paper also projects the future research framework and directions for the ISGLSAMS, integrated sustainable-green-lean-six sigma-agile (ISGLSA) product and ISGLSA supply and value chain.

Practical implications

The study contributes to a better understanding of ISGLSAMS’ barriers. The government, stakeholders and policymakers may plan the policy, road map and strategies to overcome the ISGLSAMS’ barriers. In-depth knowledge of subclauses of ISGLSAMS’ barriers will help the practitioners to overcome the ISGLSAMS’ barriers strategically. By overcoming the ISGLSAMS barriers, a more sustainable 7 Rs based market focused manufacturing system can be designed. This will also increase the opportunities to enhance the industrial ecology, industrial symbiosis and better recovery of the product, process and supply chain residual value. This will reduce the waste to the ecosystem.

Originality/value

This work has been carried out in search of a more sustainable manufacturing system, i.e. ISGLSAMS (which is 7 Rs based, i.e. 6 Rs of sustainability with 7th R, reconfiguration) to meet the customer variety needs along with sustainability in the ever-changing customer market. This study adds value to the practitioners to identify and prioritize the ISGLSAMS’ industry-specific barriers and design the solution for the more sustainable development of (1) industries, (2) the industrial symbiosis system and (3) the ISGLSA product, process, system and supply value chain with minimum resource consumption and environmental impact. The research also contributes to the (a) ISGLSAMS (b) ISGLSA supply chain (c) reconfigurable, sustainable and modular products and (d) redesign, recovery and refurbishing of the product to increase the product life cycle.

Article
Publication date: 2 June 2023

Lina Gozali, Teuku Yuri M. Zagloel, Togar Mangihut Simatupang, Wahyudi Sutopo, Aldy Gunawan, Yun-Chia Liang, Bernardo Nugroho Yahya, Jose Arturo Garza-Reyes, Agustinus Purna Irawan and Yuliani Suseno

This research studies the development of the evolving dynamic system model and explores the important elements or factors and what detailed attributes are the main influences…

Abstract

Purpose

This research studies the development of the evolving dynamic system model and explores the important elements or factors and what detailed attributes are the main influences model in achieving the success of a business, industry and management. It also identifies the real and major differences between static and dynamic business management models and the detailed factors that influence them. Later, this research investigates the benefits/advantages and limitations/disadvantages of some research studies. The studies conducted in this research put more emphasis on the capabilities of system dynamics (SD) in modeling and the ability to measure, analyse and capture problems in business, industry, manufacturing etc.

Design/methodology/approach

The research presented in this work is a qualitative research based on a literature review. Publicly available research publications and reports have been used to create a research foundation, identify the research gaps and develop new analyses from the comparative studies. As the literature review progressed, the scope of the literature search was further narrowed down to the development of SD models. Often, references to certain selected literature have been examined to find other relevant literature. To do so, a supporting tool (that connects related articles) provided by Google Scholar, Scopus, and particular journals has been used.

Findings

The dynamic business and management model is very different from the static business model in complexity, formality, flexibility, capturing, relationships, advantages, innovation model, new goals, updated information, perspective and problem-solving abilities. The initial approach of a static system was applied in the canvas business model, but further developments can be continued with a dynamic system approach.

Research limitations/implications

Based on this study, which shows that businesses are developing more towards digitalisation, wanting the ability to keep up with the era that is moving so fast and the desire to increase profits, an instrument is needed that can help describe the difficulties of the needs and developments of the future world. This instrument, or tool of SD, is also expected to assist in drawing future models and in building a business with complex variables that can be predicted from the beginning.

Practical implications

This study will contribute to the SD study for many business incubator research studies. Many practical in business incubator management to have a benefit how to achieve the business performance management (BPM) in SD review.

Originality/value

The significant differences between static and dynamics to be used for business research and strategic performance management. This comparative study analyses some SD models from many authors worldwide. Their goals behind their strategic business models and encounter for their respective progress.

1 – 10 of over 7000