Article
Publication date: 26 March 2024

Duc-Anh Le, Chau Ngoc Dang, Long Le-Hoai and Viet Quoc Hoang

Official development assistance (ODA) education projects have played a crucial role in improving education and training fields in developing countries, but are often facing…

Abstract

Purpose

Official development assistance (ODA) education projects have played a crucial role in improving education and training fields in developing countries, but are often facing several considerable challenges (e.g. long implementation time). Thus, this study aims to identify critical success factors (CSFs) in ODA education projects and investigate the influences of CSFs on ODA project performance measured by 11 nonprofit outcomes (NPOs).

Design/methodology/approach

A comprehensive literature review and expert interviews were conducted to compile a list of 35 potential success factors for ODA education projects. Using a survey questionnaire, 143 valid responses were collected from practitioners joining ODA projects in Vietnam. Various statistical methods (e.g. mean score method, Spearman rank correlation test, analysis of variance test, factor analysis and regression analysis) were used to analyze the collected data.

Findings

This research identified seven CSFs for ODA education projects in Vietnam: comprehensive project management competency (C1), clarity and compliance in project execution (C2), transparency and committed funding (C3), external context conditions (C4), well-controlled design and project management procedures (C5), preparations in equipment and complexity insight (C6) and punctual site delivery (C7). Furthermore, the results of regression analysis indicated that comprehensive project management competency (C1) and transparency and committed funding (C3) could significantly affect various NPOs.

Originality/value

This study offers significant insights for practitioners (e.g. project managers) to improve ODA projects’ performance and effectiveness in the education and training sector of a developing country context (like Vietnam).

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 8 March 2024

Md. Mohaimenul Islam Sourav, Mohammed Russedul Islam, Sheikh Mohibur Rahman and Md. Istiak Jahan

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of…

Abstract

Purpose

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of delays by taking responses from the stakeholders who are responsible for planning, design, funding, approval and implementation. There are few studies that have related infrastructure project delays to heterogeneity in stakeholders’ perceptions.

Design/methodology/approach

A structural equation (SE) model is developed with 350 normally distributed data points to understand the heterogeneity in stakeholders’ perceptions regarding delays in infrastructure projects in BD. Additionally, the relative importance index (RII) approach is used to assess the responses, validating the SE model.

Findings

The study finds that among the three latent variables, “Project itself related delay” has more influence on delays in infrastructure projects. Among the observed variables under the “project itself related delay” latent variable, “DPP approval process” has the most significance. From the heterogeneity analysis, the study found differences in responses among the stakeholders from “the Engineering Department,” “the Planning Office” and “the Construction Firm/Industry.” An important class of stakeholders believes that their stage is not being delayed and that other stages require attention.

Research limitations/implications

The data sample is 350. More data can improve the accuracy of the findings. Most of the respondents are civil engineers (74%) and represent the owner of the project. Sample data from more stakeholders’ will enhance the accuracy of the result.

Practical implications

This study addresses the requirements of Bangladeshi project stakeholders and how their interactions cause delays in projects. Furthermore, the opinions of other stakeholders are taken into consideration when determining the specific factors of individual stakeholders that are causing delays. Practically, the distance between stakeholders should be reduced. A project manager can play a role in this regard. Initiatives should be taken on how to complete the project quickly by eliminating the requirements discussed among the stakeholders and bureaucratic complications. Instead of placing blame on one another, stakeholders should take the initiative to figure out how to work together to finish the project on schedule. The Planning Commission’s approval of the Development Project Proposal (DPP) and Revised Development Project Proposal (RDPP) should be obtained as soon as possible by owner stakeholders. In order to avoid frequently changing the DPP, owners should also exercise greater caution when choosing contractors. Contractor stakeholders should use efficient and proper manpower and equipment so that unexpected delays are not created during the execution of work. Since the role of the contractor stakeholder is the most important among the three types of stakeholders, the contractor should raise awareness and urge the owners to get the RDPP approved quickly.

Originality/value

The findings from the study can help mitigate delays in infrastructure projects in BD, taking into account the perceptions of various stakeholders.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 31 January 2024

Chau Ngoc Dang, Warit Wipulanusat, Peem Nuaklong and Boonsap Witchayangkoon

This study aims to explore the relationships between knowledge management (KM) enablers, employee innovativeness (EI) and market development performance (MDP) in architecture…

Abstract

Purpose

This study aims to explore the relationships between knowledge management (KM) enablers, employee innovativeness (EI) and market development performance (MDP) in architecture, engineering and construction (A/E/C) firms.

Design/methodology/approach

A questionnaire survey is conducted to collect empirical data from A/E/C practitioners in Vietnam. First, factor analysis is used to identify KM enablers in A/E/C firms. Then, a framework which shows the links between KM enablers, EI and MDP is proposed. Structural equation modeling (SEM) is used to examine the proposed relationships.

Findings

This study identifies five constructs which can enable A/E/C firms to achieve effective KM implementation, including mutual trust and collaboration, organizational values and norms, information and communication systems, organizational policies and empowerment. Furthermore, the SEM results show that except for organizational policies, four remaining KM enablers significantly affect EI. It is also found that EI has a significant impact on MDP.

Practical implications

The findings could help A/E/C firms to know which KM enablers are critical to EI and provide a better understanding of the link between EI and MDP. Hence, they could make appropriate investments in KM practices to improve both EI and MDP.

Originality/value

The results of this study fill the gap in knowledge by empirically structuring the relationships between KM enablers, EI and MDP. Such results may provide A/E/C firms with useful information to enhance EI and MDP in today’s intensively competitive construction environments.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 24 October 2022

Na Zhang, Bon-Gang Hwang, Xiaopeng Deng and Fiona Tay

The Singapore construction sector is promoting performance improvement by implementing collaborative contracting (CC). For CC's successful implementation, there is a need to sieve…

Abstract

Purpose

The Singapore construction sector is promoting performance improvement by implementing collaborative contracting (CC). For CC's successful implementation, there is a need to sieve out the critical success factors (CSFs). Hence, this paper aims to explore factors influencing the adoption of CC and investigate the potential performance improvement by implementing CC.

Design/methodology/approach

Based on the literature review, 23 CSFs were identified and packaged to a questionnaire to evaluate the CSF's priority as well as CC's potential impact on the project performance. After prior validation, 165 potential respondents were drawn from survey list by using simple random sampling. Finally, 31 valid responses were received.

Findings

The survey result showed that the top five CSFs are mutual trust, all parties to commit fully, openness between parties, commitment to a win–win attitude and resource availability. The majority of respondents hold that CC implementation would improve overall project performance, decision effectiveness, cost, time, quality and risk performance.

Research limitations/implications

Directors, project managers, contractor managers and site engineers have different perceptions of CSFs. Also rather than meeting the same requirements in the implementation of CC, there are differences among projects with different values.

Originality/value

This study provides an in-depth understanding of the CSFs for industry practitioners adopting CC and CC's potential impact on project performance. This study is also helpful for authorities to formulate effective policies to push the implementation of CC.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 15 February 2024

Chau Ngoc Dang, Warit Wipulanusat, Peem Nuaklong and Boonsap Witchayangkoon

In developing countries, construction organizations are seeking to effectively implement green innovation strategies. Thus, this study aims to assess the importance of green…

Abstract

Purpose

In developing countries, construction organizations are seeking to effectively implement green innovation strategies. Thus, this study aims to assess the importance of green innovation practices and develop a measurement model for quantifying the green innovation degrees of construction firms.

Design/methodology/approach

A mixed-methods research approach is adopted. First, an extensive literature review is performed to identify potential green innovation items, which are then used to design a preliminary questionnaire. Next, expert interviews are conducted to pilot-test this questionnaire. Subsequently, by using a convenience non-probability sampling method, 88 valid responses are collected from construction firms in Vietnam. Then, one-sample and independent-samples t tests are employed to assess the importance of green innovation practices. Fuzzy synthetic evaluation (FSE) is also applied to quantitatively compare such practices. Finally, green innovation level (GIL) is proposed to measure the green innovation indexes and validated by a case study of seven construction firms.

Findings

This study identifies 13 green innovation variables, of which several key practices are highlighted for small/medium and large construction firms. The results of FSE analysis indicate that green process innovation is the most vital green category in construction firms, followed by green product and management innovations, respectively. As a quantitative measure, GIL could allow construction firms to frequently evaluate their green innovation indexes, thereby promoting green innovation practices comprehensively. Hence, construction firms would significantly enhance green competitive advantages and increasingly contribute to green and sustainable construction developments.

Originality/value

This research is one of the first attempts to integrate various green innovation practices into a comprehensive formulation. The established indexes offer detailed green innovation evaluations, which could be considered as valuable references for construction practitioners. Furthermore, a reliable and practical tool (i.e. GIL) is proposed to measure the GILs of construction firms in developing countries.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 29 November 2022

Minh Van Nguyen

This study aims to identify and prioritize barriers to corporate social responsibility (CSR) in the construction sector.

Abstract

Purpose

This study aims to identify and prioritize barriers to corporate social responsibility (CSR) in the construction sector.

Design/methodology/approach

A literature review was first conducted to identify barriers to CSR performance. After that, construction professionals were invited to validate the appropriateness of the obstacles. The discussion allowed the establishment of a list of barriers to CSR performance and their corresponding categories. Data collected from the survey were then analyzed to prioritize the importance of these barriers by the fuzzy DEMATEL-based ANP (DANP) technique.

Findings

The findings presented 16 barriers to CSR, which were categorized into four clusters. The fuzzy DANP analysis showed that strategic vision is the most crucial cluster, followed by the measurement system, stakeholder perspective and scarce resources. Among the sixteen barriers examined, lack of awareness, knowledge and information of CSR; low priority of CSR; lack of metrics to quantify CSR benefits; lack of guidelines and coherent strategies; and lack of CSR enforcement mechanism are the five most crucial barriers.

Originality/value

This study is one of the first that proposes a comprehensive model to prioritize barriers to CSR performance of contractors considering their interrelationships. It provides construction stakeholders with a framework for understanding the linkage between the barriers and CSR framework under the umbrella of stakeholder theory. Thus, the findings might assist construction practitioners and academics in fostering the success of CSR implementation.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 15 August 2022

Gokhan Kazar, Ugur Mutlu and Onur Behzat Tokdemir

Cost overruns remain a persistent problem in the construction industry. Although various cost management strategies have been implemented, innovative approaches are still…

Abstract

Purpose

Cost overruns remain a persistent problem in the construction industry. Although various cost management strategies have been implemented, innovative approaches are still required. Therefore, the authors attempted to introduce and test a new cost management strategy for the construction industry.

Design/methodology/approach

Zero-based budgeting (ZBB) is one such method whose effectiveness has been proven in different industries over many years. Therefore, the authors initially developed two different frameworks related to the integration of ZBB into a multinational construction contractor and the application process of ZBB for a construction project in this study. Then, the effectiveness and feasibility of the proposed frameworks are tested via an actual field study in a mega construction project.

Findings

The results show savings of 0.81% of the total project budget and 4.74% of the focused cost items by following the ZBB framework compared to the traditionally estimated project budget. The feedback received from the employees in the construction company shows that ZBB could be efficiently implemented during ongoing construction projects.

Research limitations/implications

The authors believe that implementing new cost management strategies such as ZBB will open doors to deal with the complex cost overrun issues and improve construction cost performances.

Originality/value

This manuscript is the first actual application of the ZBB cost management approach in the construction industry.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 22 October 2021

Fredrick Ahenkora Boamah, Jianhua Zhang and Md. Helal Miah

The effective and efficient implementation of daily work activities necessitates tacit knowledge sharing, boosting firm productivity. However, the link between tacit knowledge…

Abstract

Purpose

The effective and efficient implementation of daily work activities necessitates tacit knowledge sharing, boosting firm productivity. However, the link between tacit knowledge sharing within a company and its effects on organizational performance is unclear, so the purpose of this study is to examine the impact of sharing tacit knowledge on the success of a company.

Design/methodology/approach

Construction managers and senior managers were the study’s target participants. The correlation matrix was used to assess the significant correlation between study frameworks and the statistical approach of multiple regression was also used to test the hypotheses using statistical package for social sciences (SPSS) v.26.

Findings

The findings suggest that companies will be more willing and capable of making decisions based on experience when knowledge systems are used successfully. Furthermore, new organizational knowledge and particular evaluation procedures, such as anxiety and conflict resolution preparation, personal relationship and training improvement, mediation and task clarity, are explained, which can aid in success.

Originality/value

The study contributes to construction companies’ perception of knowledge sharing and recommends organizations to build capacity to encourage, improve engagement and review to maintain the dissemination of knowledge.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 6
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 7 September 2021

Christian Nnaemeka Egwim, Hafiz Alaka, Luqman Olalekan Toriola-Coker, Habeeb Balogun, Saheed Ajayi and Raphael Oseghale

This paper aims to establish the most underlying factors causing construction projects delay from the most applicable.

Abstract

Purpose

This paper aims to establish the most underlying factors causing construction projects delay from the most applicable.

Design/methodology/approach

The paper conducted survey of experts using systematic review of vast body of literature which revealed 23 common factors affecting construction delay. Consequently, this study carried out reliability analysis, ranking using the significance index measurement of delay parameters (SIDP), correlation analysis and factor analysis. From the result of factor analysis, this study grouped a specific underlying factor into three of the six applicable factors that correlated strongly with construction project delay.

Findings

The paper finds all factors from the reliability test to be consistent. It suggests project quality control, project schedule/program of work, contractors’ financial difficulties, political influence, site conditions and price fluctuation to be the six most applicable factors for construction project delay, which are in the top 25% according to the SIDP score and at the same time are strongly associated with construction project delay.

Research limitations/implications

This paper is recommending that prospective research should use a qualitative and inductive approach to investigate whether any new, not previously identified, underlying factors that impact construction projects delay can be discovered as it followed an inductive research approach.

Practical implications

The paper includes implications for the policymakers in the construction industry in Nigeria to focus on measuring the key suppliers’ delivery performance as late delivery of materials by supplier can result in rescheduling of work activities and extra time or waiting time for construction workers as well as for the management team at site. Also, construction stakeholders in Nigeria are encouraged to leverage the amount of data produced from backlog of project schedules, as-built drawings and models, computer-aided designs (CAD), costs, invoices and employee details, among many others through the aid of state-of-the-art data driven technologies such as artificial intelligence or machine learning to make key business decisions that will help drive further profitability. Furthermore, this study suggests that these stakeholders use climatological data that can be obtained from weather observations to minimize impact of bad weather during construction.

Originality/value

This paper establishes the three underlying factors (late delivery of materials by supplier, poor decision-making and Inclement or bad weather) causing construction projects delay from the most applicable.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 5
Type: Research Article
ISSN: 1726-0531

Keywords

Content available
Article
Publication date: 28 November 2023

Amir Faraji, Shima Homayoon Arya, Elnaz Ghasemi, Maria Rashidi, Srinath Perera, Vivian Tam and Payam Rahnamayiezekavat

In the construction industry, various parties are involved in a project. Consequently, claims and disputes are inevitable in this industry. This paper aims to develop Integrated…

Abstract

Purpose

In the construction industry, various parties are involved in a project. Consequently, claims and disputes are inevitable in this industry. This paper aims to develop Integrated project delivery (IPD) practices including early involvement of stakeholders and multiparty contracts which its combination with advanced technologies such as blockchain can lead to better dispute management and improve the whole construction process.

Design/methodology/approach

Based on literature review, the alternative dispute resolution (ADR) for IPD contacts were identified, and three formats of IPD contracts were selected, and the dispute resolution process of them has been analyzed. Then, based on blockchain review, a conceptual blockchain-based dispute management (BDM) model was generated for ADR in IPD. Model validation was done by an interview. Experts were asked to compare the BDM model with the traditional system regarding the ADR duration.

Findings

Analyses of the collected data from the experts demonstrated that the BDM model has better function in terms of time and cost for ADR process when the project is facing serious and considerable number of disputes. The relation between blockchain technology (BCT) and building information modeling (BIM) has been examined through a framework, and the ability of the proposed model for administrating dispute resolution process has been verified using four different scenarios of construction claims that show the system can run successfully.

Originality

The current study proposes a truthful model, reliable framework to address the problem of project dispute management in IPD contracts. The system combines the ability to being unchangeable and the reliability characteristics of BCT with informative and automation aspects of BIM together to improve dispute resolution issue in the IPD system.