Search results

1 – 10 of 231
Article
Publication date: 7 June 2023

Debadyuti Das and Aditya Singh

The present work seeks to determine the optimal delivery schedule of equipment at a project site in the backdrop of limited storage space, at a minimum cost, and without…

Abstract

Purpose

The present work seeks to determine the optimal delivery schedule of equipment at a project site in the backdrop of limited storage space, at a minimum cost, and without disturbing the overall project schedule. In addition, the optimized delivery schedule helps in minimizing the fluctuating requirements of space at the project site across the entire project lifespan.

Design/methodology/approach

The study is carried out at a Steel plant operating in a constrained space but undergoing a production capacity expansion. The problem motivated us to explore the possibility of postponing the delivery dates of certain equipment closer to the erection dates without compromising on the project schedule. Given the versatility of linear programming models in dealing with such schedule optimization problems, the authors formulated the above problem as a Zero-One Integer Linear Programming problem.

Findings

The model is implemented for all the new equipment arriving for two major units – the Hot Strip Mill (HSM) and the Blast Furnace (BF). It generates an optimized delivery schedule by delaying the delivery of some equipment by a certain number of periods, without compromising the overall project schedule and at a minimum storage cost. The average space utilization increases by 25.85 and 14.79% in HSM and BF units respectively. The fluctuations in space requirements are reduced substantially in both units.

Originality/value

The study shows a timeline in the form of a Gantt chart for the delivery of equipment, storage of equipment across different periods, and the number of periods for which the delivery of certain equipment needs to be postponed. The study uses linearly increasing storage costs with the increase in the number of periods for storage of the equipment in the temporary shed.

Highlights

  1. Determined the optimal delivery schedule of the equipment in a project environment in the backdrop of limited storage space in the project site.

  2. Formulated the above problem as a Zero-One Integer Linear Programming (ILP) problem.

  3. The average space utilization has increased by 25.85 and 14.79% in HSM and BF units respectively.

  4. The optimized delivery schedule helps in reducing the fluctuations in space requirements substantially across the entire lifespan of the project.

  5. The timeline of delivery of equipment, storage of equipment across different periods and periods of postponement of the equipment are shown in the form of a Gantt Chart.

Determined the optimal delivery schedule of the equipment in a project environment in the backdrop of limited storage space in the project site.

Formulated the above problem as a Zero-One Integer Linear Programming (ILP) problem.

The average space utilization has increased by 25.85 and 14.79% in HSM and BF units respectively.

The optimized delivery schedule helps in reducing the fluctuations in space requirements substantially across the entire lifespan of the project.

The timeline of delivery of equipment, storage of equipment across different periods and periods of postponement of the equipment are shown in the form of a Gantt Chart.

Details

Journal of Advances in Management Research, vol. 20 no. 5
Type: Research Article
ISSN: 0972-7981

Keywords

Article
Publication date: 12 October 2023

Zhuyue Li and Chunxiao Zhang

Supply chain risk management can effectively reduce the loss of retailers. In this regard, retailers need to consider the competition risks of competitors in addition to the…

Abstract

Purpose

Supply chain risk management can effectively reduce the loss of retailers. In this regard, retailers need to consider the competition risks of competitors in addition to the disruption risks. This paper designs a resilient retail supply chain network for perishable foods under the dynamic competition to maximize retailer's profits.

Design/methodology/approach

A two-stage mixed-integer non-linear model is presented for designing the supply chain network. In the first stage, an equilibrium model that considers the characteristics of perishable foods is developed. In the second stage, a mixed integer non-linear programming model is presented to deal with the strategic decisions. Finally, an efficient memetic algorithm is designed to deal with large-scale problems.

Findings

The optimal the selection of suppliers, distribution centers and the order allocation are found among the supply chain entities. Considering the perishability of agri-food products, the equilibrium retail price and selling quantity are determined. Through a numerical example, the optimal inventory period under different maximum shelf life and the impact of three resilient strategies on retailer's profit, selling price and selling quantity are analyzed.

Research limitations/implications

As for future research, the research can be extended in a number of directions. First, this paper studies the retail supply chain network design problem under competition among retailers. It can be an interesting direction to consider retailers competing with suppliers. Second, the authors can try to linearize the non-linear model and solve the large-scale integer programming problem by exact algorithm. Finally, the freshness of perishable foods gradually declines linearly to zero as the maximum shelf life approaches, and it would be a meaningful attempt to consider the freshness of perishable foods declines exponentially.

Originality/value

This paper innovatively designs the resilient supply chain network for perishable foods under dynamic competition. The retailer's dynamic competition and resilient strategies are considered simultaneously when designing supply chain network for perishable foods. In addition, this paper gives insights into how to obtain the optimal inventory period and compare the retailer's resilient strategies.

Article
Publication date: 10 February 2023

Rokhsaneh Yousef Zehi and Noor Saifurina Nana Khurizan

Uncertainty in data, whether in real-valued or integer-valued data, may result in infeasible optimal solutions or unreliable efficiency scores and ranking of decision-making…

Abstract

Purpose

Uncertainty in data, whether in real-valued or integer-valued data, may result in infeasible optimal solutions or unreliable efficiency scores and ranking of decision-making units. To handle the uncertainty in integer-valued factors in data envelopment analysis (DEA) models, this study aims to propose a robust DEA model which is applicable in the presence of such factors.

Design/methodology/approach

This research focuses on the application of fuzzy interpretation of efficiency to a mixed-integer DEA (MIDEA) model. The robust optimization approach is used to address the uncertain integer-valued parameters in the proposed MIDEA model.

Findings

In this study, the authors proposed an MIDEA model without any equality constraint to avoid the arise problem by such constraints in the construction of the robust counterpart of the conventional MIDEA models. We have studied the characteristics and conditions for constructing the uncertainty set with uncertain integer-valued parameters and a robust MIDEA model is proposed under a combined box-polyhedral uncertainty set. The applicability of the developed models is shown in a case study of Malaysian public universities.

Originality/value

This study develops an MIDEA model equivalent to the conventional MIDEA model excluding any equality constraint which is crucial in robust approach to avoid restricted feasible region or infeasible solutions. This study proposes a robust DEA approach which is applicable in cases with uncertain integer-valued parameters, unlike previous studies in robust DEA field where uncertain parameters are generally assumed to be only real-valued.

Details

Journal of Modelling in Management, vol. 19 no. 1
Type: Research Article
ISSN: 1746-5664

Keywords

Article
Publication date: 8 March 2022

Roya Amiri, Javad Majrouhi Sardroud and Vahid Momenaei Kermani

The site layout has a significant impact on the efficiency of construction operations. Planning an effective site layout partly involves identifying and positioning temporary…

Abstract

Purpose

The site layout has a significant impact on the efficiency of construction operations. Planning an effective site layout partly involves identifying and positioning temporary facilities such as tower cranes and areas on the jobsite for materials storage. This study proposes an approach to optimizing the type and location of the tower crane and material supply point on construction sites.

Design/methodology/approach

The problem is formulated into an integer linear programming (ILP) model considering the total cost of material transportation as the objective function and site conditions as constraints. The efficacy of the approach is demonstrated by finding the optimum site layout for a numerical example. The proposed model is validated and verified using two methods.

Findings

Results indicate that the proposed model successfully identifies the type and location of the tower crane and the location of material supply point, leading to approximately 20% cost reduction compared with when such features of a site layout are decided solely based on experience and educated guesses of the construction manager.

Originality/value

The primary contribution of this study is to present a modified linear mathematical model for site layout optimization that exhibits improved performance compared with previous models. The type and location of the tower crane and the material supply point as decision variables are extracted directly from solving the proposed model. The proposed model will help enhance time and cost efficiency on construction sites.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 12 September 2023

Kemal Subulan and Adil Baykasoğlu

The purpose of this study is to develop a holistic optimization model for an integrated sustainable fleet planning and closed-loop supply chain (CLSC) network design problem under…

Abstract

Purpose

The purpose of this study is to develop a holistic optimization model for an integrated sustainable fleet planning and closed-loop supply chain (CLSC) network design problem under uncertainty.

Design/methodology/approach

A novel mixed-integer programming model that is able to consider interactions between vehicle fleet planning and CLSC network design problems is first developed. Uncertainties of the product demand and return fractions of the end-of-life products are handled by a chance-constrained stochastic program. Several Pareto optimal solutions are generated for the conflicting sustainability objectives via compromise and fuzzy goal programming (FGP) approaches.

Findings

The proposed model is tested on a real-life lead/acid battery recovery system. By using the proposed model, sustainable fleet plans that provide a smaller fleet size, fewer empty vehicle repositions, minimal CO2 emissions, maximal vehicle safety ratings and minimal injury/illness incidence rate of transport accidents are generated. Furthermore, an environmentally and socially conscious CLSC network with maximal job creation in the less developed regions, minimal lost days resulting from the work's damages during manufacturing/recycling operations and maximal collection/recovery of end-of-life products is also designed.

Originality/value

Unlike the classical network design models, vehicle fleet planning decisions such as fleet sizing/composition, fleet assignment, vehicle inventory control, empty repositioning, etc. are also considered while designing a sustainable CLSC network. In addition to sustainability indicators in the network design, sustainability factors in fleet management are also handled. To the best of the authors' knowledge, there is no similar paper in the literature that proposes such a holistic optimization model for integrated sustainable fleet planning and CLSC network design.

Article
Publication date: 9 September 2022

Akhilesh Kumar, Gaurav Kumar, Tanaya Vijay Ramane and Gurjot Singh

This study proposes strategies for vaccine center allocation for coronavirus disease (COVID) vaccine by determining the number of vaccination stations required for the vaccination…

Abstract

Purpose

This study proposes strategies for vaccine center allocation for coronavirus disease (COVID) vaccine by determining the number of vaccination stations required for the vaccination drive, location of vaccination station, assignment of demand group to vaccination station, allocation of the scarce medical professional teams to station and number of optimal days a vaccination station to be functional in a week.

Design/methodology/approach

The authors propose a mixed-integer nonlinear programming model. However, to handle nonlinearity, the authors devise a heuristic and then propose a two-stage mixed-integer linear programming (MILP) formulation to optimize the allocation of vaccination centers or stations to demand groups in the first stage and the allocation of vaccination centers to cold storage links in the second stage. The first stage optimizes the cost and average distance traveled by people to reach the vaccination center, whereas the second stage optimizes the vaccine’s holding and storage and transportation cost by efficiently allocating cold storage links to the centers.

Findings

The model is studied for the real-world case of Chandigarh, India. The results obtained validate that the proposed approach can immensely help government agencies and policymaking body for a successful vaccination drive. The model tries to find a tradeoff between loss due to underutilized medical teams and the distance traveled by a demand group to get the vaccination.

Originality/value

To the best of our knowledge, there are hardly any studies on a vaccination program at such a scale due to sudden outbreaks such as Covid-19.

Details

Benchmarking: An International Journal, vol. 30 no. 9
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 26 September 2023

Seyed Mojtaba Taghavi, Vahidreza Ghezavati, Hadi Mohammadi Bidhandi and Seyed Mohammad Javad Mirzapour Al-e-Hashem

This paper aims to minimize the mean-risk cost of sustainable and resilient supplier selection, order allocation and production scheduling (SS,OA&PS) problem under uncertainty of…

Abstract

Purpose

This paper aims to minimize the mean-risk cost of sustainable and resilient supplier selection, order allocation and production scheduling (SS,OA&PS) problem under uncertainty of disruptions. The authors use conditional value at risk (CVaR) as a risk measure in optimizing the combined objective function of the total expected value and CVaR cost. A sustainable supply chain can create significant competitive advantages for companies through social justice, human rights and environmental progress. To control disruptions, the authors applied (proactive and reactive) resilient strategies. In this study, the authors combine resilience and social responsibility issues that lead to synergy in supply chain activities.

Design/methodology/approach

The present paper proposes a risk-averse two-stage mixed-integer stochastic programming model for sustainable and resilient SS,OA&PS problem under supply disruptions. In this decision-making process, determining the primary supplier portfolio according to the minimum sustainable-resilient score establishes the first-stage decisions. The recourse or second-stage decisions are: determining the amount of order allocation and scheduling of parts by each supplier, determining the reactive risk management strategies, determining the amount of order allocation and scheduling by each of reaction strategies and determining the number of products and scheduling of products on the planning time horizon. Uncertain parameters of this study are the start time of disruption, remaining capacity rate of suppliers and lead times associated with each reactive strategy.

Findings

In this paper, several numerical examples along with different sensitivity analyses (on risk parameters, minimum sustainable-resilience score of suppliers and shortage costs) were presented to evaluate the applicability of the proposed model. The results showed that the two-stage risk-averse stochastic mixed-integer programming model for designing the SS,OA&PS problem by considering economic and social aspects and resilience strategies is an effective and flexible tool and leads to optimal decisions with the least cost. In addition, the managerial insights obtained from this study are extracted and stated in Section 4.6.

Originality/value

This work proposes a risk-averse stochastic programming approach for a new multi-product sustainable and resilient SS,OA&PS problem. The planning horizon includes three periods before the disruption, during the disruption period and the recovery period. Other contributions of this work are: selecting the main supply portfolio based on the minimum score of sustainable-resilient criteria of suppliers, allocating and scheduling suppliers orders before and after disruptions, considering the balance constraint in receiving parts and using proactive and reactive risk management strategies simultaneously. Also, the scheduling of reactive strategies in different investment modes is applied to this problem.

Article
Publication date: 21 November 2023

Pham Duc Tai, Krit Jinawat and Jirachai Buddhakulsomsiri

Distribution network design involves a set of strategic decisions in supply chains because of their long-term impacts on the total logistics cost and environment. To incorporate a…

Abstract

Purpose

Distribution network design involves a set of strategic decisions in supply chains because of their long-term impacts on the total logistics cost and environment. To incorporate a trade-off between financial and environmental aspects of these decisions, this paper aims to determine an optimal location, among candidate locations, of a new logistics center, its capacity, as well as optimal network flows for an existing distribution network, while concurrently minimizing the total logistics cost and gas emission. In addition, uncertainty in transportation and warehousing costs are considered.

Design/methodology/approach

The problem is formulated as a fuzzy multiobjective mathematical model. The effectiveness of this model is demonstrated using an industrial case study. The problem instance is a four-echelon distribution network with 22 products and a planning horizon of 20 periods. The model is solved by using the min–max and augmented ε-constraint methods with CPLEX as the solver. In addition to illustrating model’s applicability, the effect of choosing a new warehouse in the model is investigated through a scenario analysis.

Findings

For the applicability of the model, the results indicate that the augmented ε-constraint approach provides a set of Pareto solutions, which represents the ideal trade-off between the total logistics cost and gas emission. Through a case study problem instance, the augmented ε-constraint approach is recommended for similar network design problems. From a scenario analysis, when the operational cost of the new warehouse is within a specific fraction of the warehousing cost of third-party warehouses, the solution with the new warehouse outperforms that without the new warehouse with respective to financial and environmental objectives.

Originality/value

The proposed model is an effective decision support tool for management, who would like to assess the impact of network planning decisions on the performance of their supply chains with respect to both financial and environmental aspects under uncertainty.

Article
Publication date: 25 March 2022

Fatemeh Yazdani, Mehdi Khashei and Seyed Reza Hejazi

This paper aims to detect the most profitable, i.e. optimal turning points (TPs), from the history of time series using a binary integer programming (BIP) model. TPs prediction…

Abstract

Purpose

This paper aims to detect the most profitable, i.e. optimal turning points (TPs), from the history of time series using a binary integer programming (BIP) model. TPs prediction problem is one of the most popular yet challenging topics in financial planning. Predicting profitable TPs results in earning profit by offering the opportunity to buy at low and selling at high. TPs detected from the history of time series will be used as the prediction model’s input. According to the literature, the predicted TPs’ profitability depends on the detected TPs’ profitability. Therefore, research for improving the profitability of detection methods has been never given up. Nevertheless, to the best of our knowledge, none of the existing methods can detect the optimal TPs.

Design/methodology/approach

The objective function of our model maximizes the profit of adopting all the trading strategies. The decision variables represent whether or not to detect the breakpoints as TPs. The assumptions of the model are as follows. Short-selling is possible. The time value for the money is not considered. Detection of consecutive buying (selling) TPs is not possible.

Findings

Empirical results with 20 data sets from Shanghai Stock Exchange indicate that the model detects the optimal TPs.

Originality/value

The proposed model, in contrast to the other methods, can detect the optimal TPs. Additionally, the proposed model, in contrast to the other methods, requires transaction cost as its only input parameter. This advantage reduces the process’ calculations.

Details

Journal of Modelling in Management, vol. 18 no. 5
Type: Research Article
ISSN: 1746-5664

Keywords

Article
Publication date: 11 May 2023

Sanjib Chowdhury

This paper aims to deal with a real-life strategic conflict in joint operations (JOs) for facility location decision and planning in an oil and gas field that stretches over two…

Abstract

Purpose

This paper aims to deal with a real-life strategic conflict in joint operations (JOs) for facility location decision and planning in an oil and gas field that stretches over two countries and tries to develop a basis for mitigating such conflict.

Design/methodology/approach

This paper develops a novel approach using integer linear programming (ILP) to determine optimal facility location considering technical, economic and environmental factors. Strategic decision-making in JOs is also influenced by business priorities of individual partner, sociopolitical issues and other covert factors. The cost-related quantitative factors are normalized using inverse normalization function as these are to be minimized, and qualitative factors that are multi-decision-making criteria are maximized, thus transforming both qualitative and quantitative factors as a single objective of maximization in ILP model.

Findings

The model identifies the most suitable facility location based on a wide range of factors that would provide maximum benefit in the long term, which will help decision-makers and managers.

Research limitations/implications

The model can be expanded incorporating other quantitative and qualitative factors such as tax incentives by the government, local bodies and government regulations.

Practical implications

The applicability of the model is not limited to JOs or oil/gas field, but is applicable to a wide range of sectors.

Originality/value

The model is transparent and based on rational and scientific basis, which would help in building consensus among the dissenting parties and aid in mitigating strategic conflict. Such type of model for mitigating strategic conflict has not been reported/used before.

Details

Journal of Global Operations and Strategic Sourcing, vol. 16 no. 3
Type: Research Article
ISSN: 2398-5364

Keywords

Access

Year

Last 12 months (231)

Content type

Article (231)
1 – 10 of 231