Search results

1 – 7 of 7
Article
Publication date: 1 May 1982

Arndt Sorge, Gert Hartmann, Malcolm Warner and Ian Nicholas

Those who believe that the effects of micro‐electronics are due to the working of technical imperatives, or to the mechanisms of the capitalist system, are prone to neglect…

Abstract

Those who believe that the effects of micro‐electronics are due to the working of technical imperatives, or to the mechanisms of the capitalist system, are prone to neglect national differences. Our suggestion is that micro‐electronics, and specifically CNC, may have different con‐sequences and be used to different ends, according to the prevailing traditions within society. We expressly include, under such traditions, technical, organisational, and labour variables. We then conjecture that the stability of work traditions will not be changed by the incidence of micro‐electronics; it will only be expressed in new ways. We thus see the development and application of supposed‐ly “high technology” as constrained by an unchanging socio‐technical tradition.

Details

Employee Relations, vol. 4 no. 5
Type: Research Article
ISSN: 0142-5455

Article
Publication date: 1 May 1983

In the last four years, since Volume I of this Bibliography first appeared, there has been an explosion of literature in all the main functional areas of business. This wealth of…

16536

Abstract

In the last four years, since Volume I of this Bibliography first appeared, there has been an explosion of literature in all the main functional areas of business. This wealth of material poses problems for the researcher in management studies — and, of course, for the librarian: uncovering what has been written in any one area is not an easy task. This volume aims to help the librarian and the researcher overcome some of the immediate problems of identification of material. It is an annotated bibliography of management, drawing on the wide variety of literature produced by MCB University Press. Over the last four years, MCB University Press has produced an extensive range of books and serial publications covering most of the established and many of the developing areas of management. This volume, in conjunction with Volume I, provides a guide to all the material published so far.

Details

Management Decision, vol. 21 no. 5
Type: Research Article
ISSN: 0025-1747

Keywords

Article
Publication date: 1 April 1980

(a) Discussion Papers from the International Institute of Management, Platz der Luftbrucke 1–3, D‐1000 Berlin 42

Abstract

(a) Discussion Papers from the International Institute of Management, Platz der Luftbrucke 1–3, D‐1000 Berlin 42

Details

International Journal of Manpower, vol. 1 no. 4
Type: Research Article
ISSN: 0143-7720

Content available
Article
Publication date: 8 February 2024

Luk Warlop and Morana Fuduric

515

Abstract

Details

European Journal of Marketing, vol. 58 no. 2
Type: Research Article
ISSN: 0309-0566

Book part
Publication date: 20 March 2001

Ross B. Emmett

Abstract

Details

A Research Annual
Type: Book
ISBN: 978-1-84950-072-2

Article
Publication date: 20 January 2020

Amer Fahmy, Tarek Hassan, Hesham Bassioni and Ronald McCaffer

Basic project control through traditional methods is not sufficient to manage the majority of real-time events in most construction projects. The purpose of this paper is to…

Abstract

Purpose

Basic project control through traditional methods is not sufficient to manage the majority of real-time events in most construction projects. The purpose of this paper is to propose a Dynamic Scheduling (DS) model that utilizes multi-objective optimization of cost, time, resources and cash flow, throughout project construction.

Design/methodology/approach

Upon reviewing the topic of DS, a worldwide internet survey with 364 respondents was conducted to define end-user requirements. The model was formulated and solution algorithms discussed. Verification was reported using predefined problem sets and a real-life case. Validation was performed via feedback from industry experts.

Findings

The need for multi-objective dynamic software optimization of construction schedules and the ability to choose among a set of optimal alternatives were highlighted. Model verification through well-known test cases and a real-life project case study showed that the model successfully achieved the required dynamic functionality whether under the small solved example or under the complex case study. The model was validated for practicality, optimization of various DS schedule quality gates, ease of use and software integration with contemporary project management practices.

Practical implications

Optimized real-time scheduling can provide better resources management including labor utilization and cost efficiency. Furthermore, DS contributes to optimum materials procurement, thus minimizing waste.

Social implications

Optimized real-time scheduling can provide better resources management including labor utilization and cost efficiency. Furthermore, DS contributes to optimum materials procurement, thus minimizing waste.

Originality/value

The paper illustrates the importance of DS in construction, identifies the user needs and overviews the development, verification and validation of a model that supports the generation of high-quality schedules beneficial to large-scale projects.

Details

Built Environment Project and Asset Management, vol. 10 no. 3
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 15 November 2011

Maria Elena Bruni, Patrizia Beraldi, Francesca Guerriero and Erika Pinto

The purpose of this paper is to address the problem of scheduling under uncertainty in construction projects. The existing methods for determining a project schedule are based on…

1933

Abstract

Purpose

The purpose of this paper is to address the problem of scheduling under uncertainty in construction projects. The existing methods for determining a project schedule are based on assumption of complete knowledge of project parameters; but in reality there is uncertainty in construction projects, deriving from a multitude of context‐dependent sources and often provided as outcome of a risk analysis process. Thus, classical deterministic analysis might provide a schedule which is not sufficiently protected against possible disruptions.

Design/methodology/approach

A quantitative methodology is developed for planning construction projects under uncertainty aimed at determining a reliable resource feasible project schedule by taking into account the available probabilistic information to produce solutions that are less sensitive to perturbations that occur on line. The methodology relies on a computer‐supported system that allows to identify, analyze and quantify the schedule reliability and the impact of possible disruptions on the duration of the project.

Findings

It is found that the proposed methodology can exploit more information about the uncertain parameters than the commonly‐used deterministic method, and it provides an improved understanding of the schedule reliability in presence of uncertainty. The schedule generated with a classical deterministic method sets a completely unrealistic planned project delivery date of about 1,250 days, with a probability around 50 per cent to be exceeded. This behavior can be very unsatisfactory for construction projects for which high penalties are usually associated to heavy due date violations.

Originality/value

This paper presents an approach for robust scheduling of construction project problem under uncertainty. We provide a tool able to support managers in developing a workable and realistic project schedule to be used as a guideline for project control and monitoring.

Details

Engineering Computations, vol. 28 no. 8
Type: Research Article
ISSN: 0264-4401

Keywords

1 – 7 of 7