Search results

11 – 20 of 160
Article
Publication date: 1 March 2006

D R Ogunsemi and I O Aje

Construction projects in Nigeria are generally characterized by cost and time overrun, substandard work, disputes and abandonment; emanating from several factors of which the…

801

Abstract

Construction projects in Nigeria are generally characterized by cost and time overrun, substandard work, disputes and abandonment; emanating from several factors of which the wrong choice of contractors is a key factor. This study evaluated the criteria adopted by clients and consultants in contractors’ selection in Nigeria. Data were collected with the aid of questionnaire administered on clients and consultants within the Nigerian construction industry. Also prequalification/bid evaluation scores for eighty contractors were collected based on the criteria used in assessing them. The data collected were analysed with the aid of mean score and regression analysis. The result showed that past performance; contractors’ experience; workmanship quality; tender sum; and plant and equipment were the most important criteria for contractors’ prequalification/bid evaluation in Nigeria. A contractors’ selection model was eventually derived based on some of the identified factors. The goodness of fit of the model as defined by the value of r2 was found to be 99%. This therefore implies that only 1% is explained by other independent variables not included in the regression equation; hence the suitability of the model for contractors’ selection in Nigeria.

Details

Journal of Financial Management of Property and Construction, vol. 11 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Book part
Publication date: 23 September 2022

Temidayo Oluwasola Osunsanmi, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala and Ayodeji Emmanuel Oke

The prevalent practice of construction supply chain (CSC) in developing countries with a focus on Africa was presented in this chapter. Two African countries (South Africa and…

Abstract

The prevalent practice of construction supply chain (CSC) in developing countries with a focus on Africa was presented in this chapter. Two African countries (South Africa and Ghana) were selected due to the extensive literature on the CSC emanating from the countries. The impediment to the effective management of the CSC in the two African countries was also examined in this chapter. It was discovered that the vital inhibition to the performance of CSC in developing countries is the adoption of culture from developed countries without a proper model for ensuring its implementation in developing countries. Also, no model has incorporated the principles and technologies of the fourth industrial revolution (4IR) to manage the CSC. The failure to adopt the 4IR technologies like block chain, big data and the internet of things has prevented the proper application of CSC practices in developing countries. CSC practices like collaboration, integration, lean supply chain, information sharing, financial management and communication are the primary practice in developing countries. Finally, this chapter called for the development of a model for managing the CSC in developing countries in alignment with the principles of the 4IR.

Details

Construction Supply Chain Management in the Fourth Industrial Revolution Era
Type: Book
ISBN: 978-1-80382-160-3

Keywords

Article
Publication date: 2 January 2024

Dillip Kumar Das

The delay in real estate projects in India is pervasive. Organization and management (O&M) and project management (PM)-related challenges are argued to contribute to project…

Abstract

Purpose

The delay in real estate projects in India is pervasive. Organization and management (O&M) and project management (PM)-related challenges are argued to contribute to project delays. This study examined the O&M and PM factors that cause delays, the level of implementation of various O&M and PM aspects in real estate projects and how the challenges can be alleviated.

Design/methodology/approach

Perception surveys among the consumers and relevant stakeholders engaged in real estate projects in the Bhubaneswar and Cuttack regions of India were conducted to collect data on the factors of delay and implementation of the O&M and PM aspects. Relevant statistical methods and structural equation modeling (SEM) were used for data analysis.

Findings

Findings suggest that from the O&M point of view, poor decision-making, mishandling of finance, concurrent execution of many projects, diversion and misuse of finance for unrelated activities, lack of PM personnel and poor management contribute to the delay. Further, although the project initiation is satisfactorily done, most of the PM principles are not largely used, thus leading to delay.

Research limitations/implications

The study does have limitations, including its reliance on a perception survey of consumers and stakeholders, a limited sample size and a restricted number of projects. Nevertheless, the study highlights the need to address poor O&M and the insufficient application of PM principles to combat project delays in the Indian real estate sector.

Practical implications

Proper O&M and adequate application of PM will enable professional management of the projects and avoid delay.

Social implications

Proper O&M and the application of adequate PM would reduce delays in real estate projects. Consequently, conflicts between the companies and consumers might be reduced and housing and infrastructure demands might be met.

Originality/value

The study manifested that the lack of adequate implementation of O&M and PM aspects leads to delays. So, it is theorized that O&M and PM play critical roles in the success of real estate projects. Appropriate implementation of the principles and best practices linked to these aspects might alleviate the challenges of delay in real estate projects in India.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 31 July 2009

O.I. Aje, K.T. Odusami and D.R. Ogunsemi

Management capability is one of the major criteria for evaluating construction contractors during prequalification and tender evaluation This paper aims to investigate the impact…

2642

Abstract

Purpose

Management capability is one of the major criteria for evaluating construction contractors during prequalification and tender evaluation This paper aims to investigate the impact of contractors' management capability as a prequalification criterion on cost and time performance of selected building projects.

Design/methodology/approach

Prequalification assessments of management capability of wining contractors as well as cost data relating to 77 completed building projects executed between 2004 and 2007 are obtained. The data obtained from a questionnaire and archival data are analyzed using one‐way analysis of variance and multiple regression.

Findings

The results reveal that contractors' management capability has significant impact on cost and time performance of building projects as evidenced by p‐values of 0.042 and 0.039, respectively.

Practical implications

The research could be of significant benefit at the research implementation stage of public procurement practice especially in relation to the construction industry in Nigeria. Construction practitioners involved in prequalification and tender evaluation should continue to seek relevant information relating to management capability from the candidate contractors during prequalification and tender evaluation.

Originality/value

Models capable of predicting the final cost and duration of building projects are eventually derived based on prequalification assessment of contractors on management capability, proposed contract duration and the initial contract figure. The goodness of fit of the models as defined by the value of R2 is found to be 96.2 percent and 90.01 percent for cost and time, respectively; thus signifying high predictive efficacy of the models.

Details

Journal of Financial Management of Property and Construction, vol. 14 no. 2
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 6 February 2017

Olaniyi Isaac Aje, Oluwole Alfred Olatunji and Olanrewaju Augustine Olalusi

Evidence suggests project owners could use advance payments to prevent cost escalations. The purpose of this paper is to elicit the relationships between causations of overruns…

Abstract

Purpose

Evidence suggests project owners could use advance payments to prevent cost escalations. The purpose of this paper is to elicit the relationships between causations of overruns when advance payments are issued to contractors.

Design/methodology/approach

In total, 97 responses from a questionnaire survey were analysed. Additional data on 51 projects, completed between 2000 and 2014 under different advance payments regimes, were also obtained and analysed.

Findings

Project owners issue advance payments to contractors so as to avoid delays. However, statistical correlation between advance payments and overrun causations are not significant. Although cost overruns were higher in large projects than in small projects, schedule overruns were more in small projects than in large projects. Schedule overruns were caused most significantly by contractors’ site management approaches. Design and documentation issues were identified as the most prevalent cause of cost overruns. Regression models are proposed to elicit overruns when advance payments are issued.

Practical implications

Extant debates on project overruns in construction and project management literature are robust. Nonetheless, the study elicits considerable knowledge gaps regarding the roles of advance payments in fostering project performance.

Originality/value

This pioneering work indexes the relationship between advance payment and project overruns in Nigeria. It is also the first attempt to document the probability distribution of overruns in Nigeria, particularly under specific advance payment regimes.

Details

Built Environment Project and Asset Management, vol. 7 no. 1
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 3 February 2020

Emmanuel Oluwatobi Adebisi, Oluwaseyi Olalekan Alao and Stephen Okunlola Ojo

The continuous failure of construction projects notwithstanding appreciable increase in project management knowledge has necessitated a proactive approach of assessing early…

Abstract

Purpose

The continuous failure of construction projects notwithstanding appreciable increase in project management knowledge has necessitated a proactive approach of assessing early warning signs (EWS) of building projects failure. Building projects are expected to show warning signs before experiencing crises, comparable to a patient displaying symptoms of a disease. Thus, this study aims to examine the EWS that predisposed building projects to failure in Nigeria to provide empirical data for enhancing projects delivery.

Design/methodology/approach

Primary data were used for the study. Structured questionnaire was administered to consultants and contractors’ personnel within Lagos State, Nigeria. A total of 180 copies of questionnaire were administered and 134 copies (combined response rate of 74.44 per cent) were retrieved. Frequency distribution, percentages, mean item score and Mann–Whitney test were used to analyse the data.

Findings

Most construction professionals applied the EWS approach from project planning and early construction phase. The most significant EWS predisposing building projects to failure were “Management inability and incompetence to proactively detect and manage problems at early project stages”, “Actual expenditure is constantly shooting beyond cost estimates” and “Incurred costs already getting higher than the anticipated benefits”. Project/construction management-related symptoms are most significant to predisposing building projects to failure.

Practical implications

The study provided implications for effective project management of building projects through proactive approach which is very paramount to improving the delivery of building projects in Nigeria.

Originality/value

The study provides implications for proactive management of building projects, thereby enhancing the delivery of building projects.

Details

Journal of Engineering, Design and Technology , vol. 18 no. 6
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 23 September 2013

O.A. Adedokun, O.T. Ibironke, D.O. Dairo, I.O. Aje, O.A. Awodele, A.D. Opawole, O.F. Akinradewo and J.O. Abiola-Falemu

The purpose of this paper is to evaluate the adoption of quantitative risk analysis techniques (QRAT) on construction projects in Nigeria with a view to providing better…

884

Abstract

Purpose

The purpose of this paper is to evaluate the adoption of quantitative risk analysis techniques (QRAT) on construction projects in Nigeria with a view to providing better understanding on the state of these techniques.

Design/methodology/approach

Questionnaire survey was employed in gathering data for the study. The paper assessed the level of knowledge, awareness, utilization, success and the factors influencing the adoption of QRAT. The primary data employed were obtained by using multiple-choice questionnaire administered to the selected large construction companies in Nigeria.

Findings

The result of the study revealed a low level adoption of QRAT, and this inhibits Nigerian construction industry from taking full advantage inherent in QRAT. Also, it prevents the analysis of risks peculiar to construction projects. Furthermore, inadequate training and record keeping on risk management were identified as significant factors affecting the adoption/utilization of QRAT on construction projects.

Research limitations/implications

Multiple-choice questionnaires administered to the respondents (architects, quantity surveyors, builders, structural engineers, civil engineers, and mechanical and electrical engineers) were limited to the selected large construction companies in the category D of the Nigerian Federal Tender Board.

Originality/value

This empirical inquiry provided strong evidence on the state of QRAT of construction projects in Nigeria. The findings revealed insightful perspectives to understand construction project QRAT in its entirety. For stakeholders, understanding and addressing the complexity help to improve project planning and implementation.

Details

Journal of Facilities Management, vol. 11 no. 4
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 3 June 2021

Jeffrey Boon Hui Yap, Martin Skitmore, Yi Wen Lim, Siaw-Chuing Loo and Jason Gray

Quantity surveying is a profession that blends engineering, construction and economics. To be competent is to have the ability to apply the set of related knowledge, skills and…

1502

Abstract

Purpose

Quantity surveying is a profession that blends engineering, construction and economics. To be competent is to have the ability to apply the set of related knowledge, skills and abilities to perform a task effectively. This paper examines the competency requirements for quantity surveyors (QSs) in the face of changing and increasing client needs.

Design/methodology/approach

Based on a detailed meta-analysis of the literature, 12 basic/core and 16 evolving competencies are identified. Primary data were gathered through a field survey involving practicing QSs from client, consultant and contractor organisations, and university students undertaking QS programmes in Malaysia. The data obtained were analysed using both descriptive and inferential statistical tools.

Findings

The significance of the basic/core and evolving competencies are presented. Overall, the most important contemporary skills are cost planning, valuation of works, measurement/quantification and contract documentation. The evolved roles require expertise in communication and negotiation, ethics and professional conduct and value management. The analysis of variance (ANOVA) indicates there are misaligned expectations of the proficiency levels needed to provide contemporary and future services between practitioners in client/consultant organisations, contractors and new generation students.

Originality/value

The findings provide guidance on the education, training and practice of quantity surveying to deal with emerging challenges in the dynamic built environments in Malaysia and beyond.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 10 April 2017

Oluwaseyi Olalekan Alao and Godwin Onajite Jagboro

Abandonment of construction projects is still a burning issue in Nigeria. Beside the poor financing of educational infrastructure, abandonment of construction projects remains a…

3565

Abstract

Purpose

Abandonment of construction projects is still a burning issue in Nigeria. Beside the poor financing of educational infrastructure, abandonment of construction projects remains a significant contributor to the inadequacy of facilities in Nigerian public tertiary educational institutions. The purpose of this paper is, therefore, to assess the causes of abandoned projects specific to public institutions of tertiary education in Nigeria, with a view to providing empirical data that are generalizable to enhancing successful delivery of teaching and research facilities.

Design/methodology/approach

Primary data used for the study were obtained through questionnaires administered to 47 professionals comprising 8 architects, 12 mechanical and electrical engineers, 15 civil/structural engineers, 4 builders and 8 quantity surveyors who were involved in physical development of construction projects in public tertiary educational institutions in Osun State. The data were analyzed using mean analysis, factor analysis and the Kruskal-Wallis (K-W) test.

Findings

The factors most significant to abandonment of tertiary educational institutional projects were delayed payments, fund mismanagement, inadequate budgetary allocation, inadequacy of finance, inflation and bankruptcy of the contractor. Findings also showed that not all factors causing abandonment were significant to tertiary institutional projects. The significant factors clustered under stakeholders’ response capacity, poor financial management, inadequate planning and monitoring, and unexpected occurrences. The K-W test showed significant differences among the categories of tertiary institutions on the ranking of the most significant causes of abandoned projects.

Research limitations/implications

The study was limited to public tertiary educational institutions in Osun State. Further studies could focus on public health institution projects and private tertiary educational projects to improve the body of knowledge on the subject of causative factors for project abandonment.

Practical implications

The study provided implications for effective contract management of public tertiary educational institutional projects, which is a significant step to improving the available teaching and research facilities in Nigerian tertiary institutions.

Originality/value

The study provides implications for effective contract management systems of projects for public tertiary educational institutions, thereby improving the available teaching and research facilities.

Details

International Journal of Building Pathology and Adaptation, vol. 35 no. 1
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 27 July 2018

Oluwaseyi Olalekan Alao, Godwin Onajite Jagboro and Akintayo Opawole

This paper aims to determine the effect of the period of abandonment on the final cost and duration of resuscitated tertiary educational building projects as a basis for enhancing…

Abstract

Purpose

This paper aims to determine the effect of the period of abandonment on the final cost and duration of resuscitated tertiary educational building projects as a basis for enhancing the performance metrics of the projects and improving the availability of facilities in tertiary institutions in Nigeria.

Design/methodology/approach

A structured questionnaire was administered on 47 professionals involved in the physical development of construction projects in Osun State public tertiary educational institutions to provide primary data for the study. Secondary data relating to initial and final costs, initial and final completion dates, dates of abandonment, period of abandonment, date of re-award, etc. were obtained from selected resuscitated projects. Data were analyzed using relative significance index and regression analysis.

Findings

The most significant effects of project abandonment were found to be disappointment of populace and over-stretching of existing facilities. The study showed a directly proportional and an exponential effect of period of abandonment on percentage cost overrun of resuscitated projects, which were represented by yc = −329.755 + 19.545x and yc = 6.1662e0.0506x, respectively. A linear relationship between period of abandonment and percentage time overrun was represented by yt = 0.467 + 0.816x.

Research limitations/implications

The fact that the regression equations could not be validated because of paucity of data was identified as a limitation of this study.

Practical implications

This study adds to the body of knowledge on abandonment of building projects from a quantitative perspective. Findings have implications for guiding long-term infrastructure development plans in public tertiary educational institutions.

Originality/value

Maximum threshold at which abandoned projects may be resuscitated at an economic cost was established as 16 months. Findings further suggest that the economy of new construction would outweigh resuscitation of abandoned projects beyond this period.

Details

Journal of Financial Management of Property and Construction, vol. 23 no. 2
Type: Research Article
ISSN: 1366-4387

Keywords

11 – 20 of 160