Search results
1 – 10 of 267Lars Stehn and Alexander Jimenez
The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels…
Abstract
Purpose
The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels. The take is that fragmentation of construction is one explanation for the lack of productivity growth, and that IHB could be an integrating method of overcoming horizontal and vertical fragmentation.
Design/methodology/approach
Singe-factor productivity measures are calculated based on data reported by IHB companies and compared to official produced and published research data. The survey covers the years 2013–2020 for IHB companies building multi-storey houses in timber. Generalization is sought through descriptive statistics by contrasting the data samples to the used means to control vertical and horizontal fragmentation formulated as three theoretical propositions.
Findings
According to the results, IHB in timber is on average more productive than conventional housebuilding at the company level, project level, in absolute and in growth terms over the eight-year period. On the company level, the labour productivity was on average 10% higher for IHB compared to general construction and positioned between general construction and general manufacturing. On the project level, IHB displayed an average cost productivity growth of 19% for an employed prefabrication degree of about 45%.
Originality/value
Empirical evidence is presented quantifying so far perceived advantages of IHB. By providing analysis of actual cost and project data derived from IHB companies, the article quantifies previous research that IHB is not only about prefabrication. The observed positive productivity growth in relation to the employed prefabrication degree indicates that off-site production is not a sufficient mean for reaching high productivity and productivity growth. Instead, the capabilities to integrate the operative logic of conventional housebuilding together with logic of IHB platform development and use is a probable explanation of the observed positive productivity growth.
Details
Keywords
Vartenie Aramali, George Edward Gibson, Hala Sanboskani and Mounir El Asmar
Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on…
Abstract
Purpose
Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on their technical aspects rather than social. This study aims to hypothesize that improving both the technical maturity of EVMS and the social environment elements of EVMS applications together will significantly impact project performance outcomes. For the first time, empirical evidence supports a strong relationship between EVMS maturity and environment.
Design/methodology/approach
Data was collected from 35 projects through four workshops, attended by 31 industry practitioners with an average of 19 years of EVMS experience. These experts, representing 23 organizations, provided over 2,800 data points on sociotechnical integration and performance outcomes, covering projects totaling $21.8 billion. Statistical analyses were performed to derive findings on the impact of technical maturity and social environment on project success.
Findings
The results show statistically significant differences in cost growth, compliance, meeting project objectives and business drivers and customer satisfaction, between projects with high EVMS maturity and environment and projects with poor EVMS maturity and environment. Moreover, the technical and social dimensions were found to be significantly correlated.
Originality/value
Key contributions include a novel and tested performance-driven framework to support integrated project management using EVMS. The adoption of this detailed assessment framework by government and industry is driving a paradigm shift in project management of some of the largest and most complex projects in the U.S.; specifically transitioning from a project assessment based upon a binary approach for EVMS technical maturity (i.e. compliant/noncompliant to standards) to a wide-ranging scale (i.e. 0–1,000) across two dimensions.
Details
Keywords
Julian Bucher, Klara Kager and Miriam Vock
The purpose of this paper is to systematically review the history and current state of lesson study (LS) in Germany. In particular, this paper describes the development of LS over…
Abstract
Purpose
The purpose of this paper is to systematically review the history and current state of lesson study (LS) in Germany. In particular, this paper describes the development of LS over time and its stakeholders.
Design/methodology/approach
Conducting a systematic literature review, we searched three scientific databases and Google Scholar, examined 806 results and included 50 articles in our final sample, which we analyzed systematically.
Findings
The spread of LS in Germany can be divided into three phases, characterized by their own LS projects as well as their own ways of understanding LS. Although interest in LS has increased significantly in recent years, it is only present at a small number of schools and universities in Germany if compared internationally. Furthermore, this paper identifies the so-called learning activity curves as a tool frequently used for observation and reflection that appears to be unknown outside German-speaking countries.
Originality/value
This paper may act as an outline for countries without large-scale LS projects and with limited support from policymakers. The experience from Germany demonstrates the outcomes and challenges that can arise in such a situation and shows how unique LS features and proceedings have emerged.
Details
Keywords
Sahar Jawad, Ann Ledwith and Rashid Khan
There is growing recognition that effective project control systems (PCS) are critical to the success of projects. The relationship between the individual elements of PCS and…
Abstract
Purpose
There is growing recognition that effective project control systems (PCS) are critical to the success of projects. The relationship between the individual elements of PCS and successfully achieving project objectives has yet to be explored. This research investigates the enablers and barriers that influence the elements of PCS success and drive project objectives.
Design/methodology/approach
This study adopts a mixed approach of descriptive analysis and regression models to explore the impact of six PCS elements on project outcomes. Petroleum and chemical projects in Saudi Arabia were selected as a case study to validate the research model.
Findings
Data from a survey of 400 project managers in Saudi’s petroleum and chemical industry reveal that successful PCS are the key to achieving all project outcomes, but they are particularly critical for meeting project cost objectives. Project Governance was identified as the most important of the six PCS elements for meeting project objectives. A lack of standard processes emerged as the most significant barrier to achieving effective project governance, while having skilled and experienced project team members was the most significant enabler for implementing earned value.
Practical implications
The study offers a direction for implementing and developing PCS as a strategic tool and focuses on the PCS elements that can improve project outcomes.
Originality/value
This research contributes to project management knowledge and differs from previous attempts in two ways. Firstly, it investigates the elements of PCS that are critical to achieving project scope, schedule and cost objectives; secondly, enablers and barriers of PCS success are examined to see how they influence each element independently.
Details
Keywords
Luís Jacques de Sousa, João Poças Martins, Luís Sanhudo and João Santos Baptista
This study aims to review recent advances towards the implementation of ANN and NLP applications during the budgeting phase of the construction process. During this phase…
Abstract
Purpose
This study aims to review recent advances towards the implementation of ANN and NLP applications during the budgeting phase of the construction process. During this phase, construction companies must assess the scope of each task and map the client’s expectations to an internal database of tasks, resources and costs. Quantity surveyors carry out this assessment manually with little to no computer aid, within very austere time constraints, even though these results determine the company’s bid quality and are contractually binding.
Design/methodology/approach
This paper seeks to compile applications of machine learning (ML) and natural language processing in the architectural engineering and construction sector to find which methodologies can assist this assessment. The paper carries out a systematic literature review, following the preferred reporting items for systematic reviews and meta-analyses guidelines, to survey the main scientific contributions within the topic of text classification (TC) for budgeting in construction.
Findings
This work concludes that it is necessary to develop data sets that represent the variety of tasks in construction, achieve higher accuracy algorithms, widen the scope of their application and reduce the need for expert validation of the results. Although full automation is not within reach in the short term, TC algorithms can provide helpful support tools.
Originality/value
Given the increasing interest in ML for construction and recent developments, the findings disclosed in this paper contribute to the body of knowledge, provide a more automated perspective on budgeting in construction and break ground for further implementation of text-based ML in budgeting for construction.
Details
Keywords
Richard Kadan and Jan Andries Wium
Due to the uniqueness of individual construction projects, identifying the dominant risk factors is needed for risk mitigation in ongoing and future projects. This study aims to…
Abstract
Purpose
Due to the uniqueness of individual construction projects, identifying the dominant risk factors is needed for risk mitigation in ongoing and future projects. This study aims to identify the dominant construction supply chain risk (CSCR) factors, based on studies conducted between 2002 and 2022.
Design/methodology/approach
The study adopts the preferred reporting items for systematic reviews and meta-analysis (PRISMA) procedure to identify, screen and select relevant articles in order to provide a bibliography and annotation of the prevalent risks in the supply chains. A descriptive analysis of the findings then follows.
Findings
The study’s findings have highlighted the three most prevalent risks in the construction supply chain (poor communication across project teams, changes in foreign currency rate, unfavorable climate conditions) as reported in literature, that project teams need to pay closer attention to and take proactive steps to mitigate.
Research limitations/implications
Due to limitations imposed by the chosen research methodology, tools, time frame and article availability, the study was unable to examine all CSCR-related papers.
Practical implications
The results will serve as a useful roadmap for risk/supply chain managers in the construction industry to take strategically proactive steps towards allocating resources for CSCR mitigation efforts.
Social implications
Context-specific research on the impact of social and cultural risks on the construction supply chain would be beneficial, due to emerging social network risk factors and the complex socio-cultural settings.
Originality/value
There is presently no study that has reviewed extant studies to identify and compile the dominant risk factors (DRFs) associated with the supply chain of construction projects for ranking in the supply chain risk management process.
Details
Keywords
This article focuses on the assessment of entrepreneurship competence by selected vocational teachers in Italy. The exploratory research question addresses the extent to which…
Abstract
Purpose
This article focuses on the assessment of entrepreneurship competence by selected vocational teachers in Italy. The exploratory research question addresses the extent to which entrepreneurship assessments are competence based, and the research seeks to identify fully fledged assessment programmes with both a formative and summative component, and the use of assessment rubrics. It also explores the extent to which entrepreneurship competence is referred to in school documentation and later assessed, and the tools and strategies used for such assessment.
Design/methodology/approach
This case study is part of a larger European research project promoted by Cedefop; in Italy it focused on six selected vocational IVET and CVET programmes and apprenticeship schemes. It used a wide range of instruments to ensure triangulation and multiple perspectives: analysed policy documents and undertook online interviews with experts and policy makers. At VET providers' premises it deployed: analysis of school documents; observations of learning environments; interviews and focus groups with (in schools) teachers, directors and vice directors, learners and alumni (in companies) instructors, company tutors and employers, apprentices and alumni.
Findings
Assessment tasks were rarely embedded within fully fledged assessment programmes involving both formative and summative tasks, and assessment rubric for grading. Most of the time, entrepreneurship programmes lacked self-assessment, peer assessment and structured feedback and did not involve learners in the assessment process. Some instructors coached the students, but undertook no clear formative assessment. These findings suggest institutions have a testing culture with regard to assessment, at the level of both policy and practice. In most cases, entrepreneurship competence was not directly assessed, and learning outcomes were only loosely related to entrepreneurship.
Research limitations/implications
One limitation concerned the selection of the VET providers: these were chosen not on a casual basis, but because they ran programmes that were relevant to the development of entrepreneurship competence.
Practical implications
At the policy level, there is a need for new guidelines on competence development and assessment in VET, guidelines that are more aligned with educational research on competence development. To ensure the development of entrepreneurship competence, educators need in-service training and a community of practice.
Originality/value
So far, the literature has concentrated on entrepreneurship education at the tertiary level. Little is known about how VET instructors assess entrepreneurship competence. This study updates the picture of policy and practice in Italy, illustrating how entrepreneurship competence is developed in selected IVET and CVET programmes and apprenticeships.
Details
Keywords
This article summarizes the international scientific research output of global forest product models, infers future research trends and provides reference for quantitative…
Abstract
Purpose
This article summarizes the international scientific research output of global forest product models, infers future research trends and provides reference for quantitative analysis and mathematical modeling of Chinese forest product problems, with the aim of contributing to promoting domestic production of Chinese forest products and strengthening international trade competitiveness of forest products.
Design/methodology/approach
In 1999, Joseph Buongiorno, a scholar at the University of Wisconsin in the United States of America, proposed the global forest products model (GFPM), which was first applied to research in the global forestry sector. GFPM is a recursive dynamic model based on five assumptions: macroeconomics, local equilibrium, dynamic equilibrium, forest product conversion flow and trade inertia. Using a certain year from 1992 to present as the base period, it simulates and predicts changes in prices, production and import and export trade indicators of 14 forest products in 180 countries (regions) through computer programs. Its advantages lie in covering a wide range of countries and a wide variety of forest products. The data mainly include forest resource data, forest product trade data, and other economic data required by the model, sourced from the Food and Agriculture Organization (FAO) of the United Nations and the World Bank, respectively.
Findings
Compared to international quantitative and modeling research in the field of forest product production and trade, China's related research is not comprehensive and in-depth, and there is not much quantitative and mathematical modeling research, resulting in a significant gap. This article summarizes the international scientific research output of global forest product models, infers future research trends, and provides reference for quantitative analysis and mathematical modeling of Chinese forest product problems, with the aim of contributing to promoting domestic production of Chinese forest products and strengthening international trade competitiveness of forest products.
Originality/value
On the basis of summarizing and analyzing the international scientific research output of GFPM, sorting out the current research status and progress at home and abroad, this article discusses potential research expansion directions in 10 aspects, including the types, yield and quality of domestic forest product production, international trade of forest products, and external impacts on the forestry system, in order to provide new ideas for global forest product model research in China.
Details
Keywords
Emmanuel Dele Omopariola, Abimbola Olukemi Windapo, David John Edwards, Clinton Ohis Aigbavboa, Sunday Ukwe-Nya Yakubu and Onimisi Obari
Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective…
Abstract
Purpose
Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective project cash flow process. However, scant research has been undertaken to empirically establish the cash flow performance and domino effect of APS on project and organisational performance.
Design/methodology/approach
The epistemological design adopted a positivist philosophical stance augmented by deductive reasoning to explore the phenomena under investigation. Primary quantitative data were collected from 504 Construction Industry Development Board (CIDB) registered contractors (within the grade bandings 1–9) in South Africa. A five-point Likert scale was utilised, and subsequent data accrued were analysed using structural equation modelling (SEM).
Findings
Emergent findings reveal that the mandatory use of an APS does not guarantee a positive project cash flow, an improvement in organisational performance or an improvement in project performance.
Practical implications
The ensuing discussion reveals the contributory influence of APS on positive cash flow and organisational performance, although APS implementation alone will not achieve these objectives. Practically, the research accentuates the need for various measures to be concurrently adopted (including APS) towards ensuring a positive project cash flow and improved organisational and project performance.
Originality/value
There is limited empirical research on cash flow performance and the domino effect of APS on project and organisational performance in South Africa, nor indeed, the wider geographical location of Africa as a continent. This study addresses this gap in the prevailing body of knowledge.
Details
Keywords
Anna Trubetskaya, Alan Ryan, Daryl John Powell and Connor Moore
Output from the Irish Dairy Industry has grown rapidly since the abolition of quotas in 2015, with processors investing heavily in capacity expansion to deal with the extra milk…
Abstract
Purpose
Output from the Irish Dairy Industry has grown rapidly since the abolition of quotas in 2015, with processors investing heavily in capacity expansion to deal with the extra milk volumes. Further capacity gains may be achieved by extending the processing season into the winter, a key enabler for which being the reduction of duration of the winter maintenance overhaul period. This paper aims to investigate if Lean Six Sigma tools and techniques can be used to enhance operational maintenance performance, thereby releasing additional processing capacity.
Design/methodology/approach
Combining the Six-Sigma Define, Measure, Analyse, Improve, Control (DMAIC) methodology and the structured approach of Turnaround Maintenance (TAM) widely used in process industries creates a novel hybrid model that promises substantial improvement in maintenance overhaul execution. This paper presents a case study applying the DMAIC/TAM model to Ireland’s largest dairy processing site to optimise the annual maintenance shutdown. The objective was to deliver a 30% reduction in the duration of the overhaul, enabling an extension of the processing season.
Findings
Application of the DMAIC/TAM hybrid resulted in process enhancements, employee engagement and a clear roadmap for the operations team. Project goals were delivered, and original objectives exceeded, resulting in €8.9m additional value to the business and a reduction of 36% in the duration of the overhaul.
Practical implications
The results demonstrate that the model provides a structure that promotes systematic working and a continuous improvement focus that can have substantial benefits for wider industry. Opportunities for further model refinement were identified and will enhance performance in subsequent overhauls.
Originality/value
To the best of the authors’ knowledge, this is the first time that the structure and tools of DMAIC and TAM have been combined into a hybrid methodology and applied in an Irish industrial setting.
Details