Search results

1 – 10 of 107
Article
Publication date: 21 November 2023

Sharaf AlKheder, Hajar Al Otaibi, Zahra Al Baghli, Shaikhah Al Ajmi and Mohammad Alkhedher

Megaproject's construction is essential for the development and economic growth of any country, especially in the developing world. In Kuwait, megaprojects are facing many…

Abstract

Purpose

Megaproject's construction is essential for the development and economic growth of any country, especially in the developing world. In Kuwait, megaprojects are facing many restrictions that discourage their execution causing a significant delay in bidding, design, construction and operation phases with the execution quality being affected. The objective of this study is to develop a complexity measurement model using analytic hierarchy process (AHP) for megaprojects in Kuwait, with a focus on the New Kuwait University multi-billion campus Shadadiyah (College of Social Science, Sharia and Law (CSSL)) as a case study.

Design/methodology/approach

The study applies a hybrid fuzzy analytic hierarchy process (FAHP) method to compare the results with those obtained using the conventional AHP method. This can facilitate the project management activities during the different stages of construction. Data were collected based on the results of a two-round Delphi questionnaire completed by seniors and experts of the selected project.

Findings

It was found that project modeling methodology was responsible for complexity. It was grouped under several categories that include technological, goal, organizational, environmental and cultural complexities. The study compares complexity degrees assessed by AHP and FAHP methods. “Technological Complexity” scores highest in both methods, with FAHP reaching 7.46. “Goal Complexity” follows closely behind, with FAHP. “Cultural Complexity” ranks third, differing between methods, while “Organizational” and “Environmental Complexity” consistently score lower, with FAHP values slightly higher. These results show varying complexity levels across dimensions. Assessing and understanding such complexities were essential toward the completion of such megaprojects.

Originality/value

The contribution of this study is on providing the empirical evidential knowledge for the priority over construction complexities in a developing country (Kuwait) in the Middle East.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 15 August 2023

Mahdi Askari Shahamabad, Alireza Rahimi, Kazem Shamsadini and Milad Shafiee Hemmatabad

Environmental taxes have been in place for many years to reduce environmental damage and pay more attention to the environment. However, some of the adverse socio-economic impacts…

Abstract

Purpose

Environmental taxes have been in place for many years to reduce environmental damage and pay more attention to the environment. However, some of the adverse socio-economic impacts that may result from such taxes and the many challenges facing developing countries have necessitated policy reform. Therefore, identifying and prioritizing the factors related to environmental tax reform (ETR) is necessary to help governments and environmental protection agencies (EPAs) focus on this prioritizing to develop and improve this process. Awareness of the benefits of ETR encourages governments to use this policy to reduce adverse environmental impacts and contribute to economic growth.

Design/methodology/approach

The primary purpose of this work is to prioritize and taxonomy the factors related to ETR using the Fuzzy Analytic Hierarchy Process (FAHP) approach. In the first stage, 25 factors were extracted from the available literature. These factors were divided into five categories for more accessible review. In the second stage, the FAHP as a Multiple-Criteria Decision-Making (MCDM) Technique was used to prioritize and develop the taxonomy of identified factors and the categories of these factors.

Findings

The results show that reducing carbon emissions (DF4) is the essential prioritization factor that governments and environmental organizations can achieve if the ETR is implemented. Following that, reducing greenhouse gas emissions (DF1), double benefit (EcF7) and increase sustainability reports (EnF4) can be achieved by implementing ETR.

Research limitations/implications

This study is geographically limited to Iran. In terms of the study population, this study is limited to 25 academic, tax and public policy experts. Moreover, in this study, FAHP is the only approach used. For further research, the results of this study can be compared with that of other multi-criteria techniques like FAHP, fuzzy TOPSIS or BWM.

Practical implications

Ratings of factors related to ETR can guide and help governments identify important factors that affect environmental tax reform, which can, in addition to controlling ecological pollution will, increase the economic benefits of governments.

Originality/value

This study is the first to identify factors related to environmental tax reform and to develop an MCDM technique for prioritizing these factors and finding important ones.

Details

Management of Environmental Quality: An International Journal, vol. 34 no. 6
Type: Research Article
ISSN: 1477-7835

Keywords

Article
Publication date: 27 April 2023

Mukesh Kumar

The purpose of this paper is to identify the radio frequency identification (RFID) strategic value attributes (RFIDSVAs) mechanism selections preferences and also integration of…

Abstract

Purpose

The purpose of this paper is to identify the radio frequency identification (RFID) strategic value attributes (RFIDSVAs) mechanism selections preferences and also integration of RFID tags with technology coordination tools (IRTWTCTs) alternatives ranking performance decisions in supply chain management (SCM). RFID-enabled techno-economic feasibility decisions are enhancing the SC visibility in apparel supply chains (ASCs). The RFIDSVAs mechanism selections have performed significant agility to strategic competitive advantages, namely, inventory visibility, multi-tags ownership transfer within trusted third party, etc.

Design/methodology/approach

Fuzzy analytical hierarchy process (FAHP) and FAHP-fuzzy Technique for Order of Preference by Similarity to Ideal Solution (FTOPSIS) approaches have been used to evaluate the quantitative assessment of RFIDSVA mechanisms selection decision based on weight priority orders and IRTWTCTs alternatives selection in ASC networks. The comparison of FAHP and FAHP-FTOPSIS approaches to evaluate the integrated framework develop in RFIDSVAs mechanisms and IRTWTCTs alternatives selection decisions in Indian multi-tier ASC networks.

Findings

The result found that the FAHP-FTOPSIS approaches have used to prioritizing the RFIDSVA mechanism selection weights and also identify the IRTWTCTs alternatives ranking preferences order in apparel SCM. The comparison between the FAHP and FAHP-FTOPSIS approach to quantitative assessments from RFIDSVA mechanisms and IRTWTCTs alternatives selection decisions, which enable them SC agility potential across multi-tier visibility in ASC networks. ASC stakeholders can be benefited by techno-economic feasibility decisions, RFID-enabled shop floor activities, multi-tags ownerships transfer in SCs and knowledge-based cryptography tags/items separation in SCs.

Research limitations/implications

The research work has considered only five RFIDSVA mechanisms and also three integration of RFIDTWTCTs alternatives in multi-tier ASC. The strategic competitive advantages are achieved by RFID-enabled break-even tags price decisions and also techno-economic feasibility decision by contractual design multi-tier SC stakeholder’s involvements.

Practical implications

The pilot project study explores that the quantitative assessment decision has based on RFID-enable techno-economic feasibility in ASCs. Stakeholders can be benefited by inventory control of the financial losses, reducing the inventory inaccuracies and multi-tags ownership transfer within trusted third-party traceability in ASC networks.

Originality/value

This study explores the RFID-enabled apparel SC process and activities visibility (natural fibre’s fibre producer, fibre dyeing producer, yarn spinning producer, knitting and finishing producer).

Details

Journal of Modelling in Management, vol. 18 no. 4
Type: Research Article
ISSN: 1746-5664

Keywords

Article
Publication date: 6 March 2024

Jayati Singh, Rupesh Kumar, Vinod Kumar and Sheshadri Chatterjee

The main aim of this study is to identify and prioritize the factors that influence the adoption of big data analytics (BDA) within the supply chain (SC) of the food industry in…

Abstract

Purpose

The main aim of this study is to identify and prioritize the factors that influence the adoption of big data analytics (BDA) within the supply chain (SC) of the food industry in India.

Design/methodology/approach

The study is carried out in two distinct phases. In the first phase, barriers hindering BDA adoption in the Indian food industry are identified. Subsequently, the second phase rates/prioritizes these barriers using multicriteria methodologies such as the “analytical hierarchical process” (AHP) and the “fuzzy analytical hierarchical process” (FAHP). Fifteen barriers have been identified, collectively influencing the BDA adoption in the SC of the Indian food industry.

Findings

The findings suggest that the lack of data security, availability of skilled IT professionals, and uncertainty about return on investments (ROI) are the top three apprehensions of the consultants and managers regarding the BDA adoption in the Indian food industry SC.

Research limitations/implications

This research has identified several reasons for the adoption of bigdata analytics in the supply chain management of foods in India. This study has also highlighted that big data analytics applications need specific skillsets, and there is a shortage of critical skills in this industry. Therefore, the technical skills of the employees need to be enhanced by their organizations. Also, utilizing similar services offered by other external agencies could help organizations potentially save time and resources for their in-house teams with a faster turnaround.

Originality/value

The present study will provide vital information to companies regarding roadblocks in BDA adoption in the Indian food industry SC and motivate academicians to explore this area further.

Details

British Food Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0007-070X

Keywords

Article
Publication date: 2 January 2024

Yi-Hsin Lin, Ruixue Zheng, Fan Wu, Ningshuang Zeng, Jiajia Li and Xingyu Tao

This study aimed to improve the financing credit evaluation for small and medium-sized real estate enterprises (SMREEs). A financing credit evaluation model was proposed, and a…

Abstract

Purpose

This study aimed to improve the financing credit evaluation for small and medium-sized real estate enterprises (SMREEs). A financing credit evaluation model was proposed, and a blockchain-driven financing credit evaluation framework was designed to improve the transparency, credibility and applicability of the financing credit evaluation process.

Design/methodology/approach

The design science research methodology was adopted to identify the main steps in constructing the financing credit model and blockchain-driven framework. The fuzzy analytic hierarchy process (FAHP)–entropy weighting method (EWM)–set pair analysis (SPA) method was used to design a financing credit evaluation model. Moreover, the proposed framework was validated using data acquired from actual cases.

Findings

The results indicate that: (1) the proposed blockchain-driven financing credit evaluation framework can effectively realize a transparent evaluation process compared to the traditional financing credit evaluation system. (2) The proposed model has high effectiveness and can achieve efficient credit ranking, reflect SMREEs' credit status and help improve credit rating.

Originality/value

This study proposes a financing credit evaluation model of SMREEs based on the FAHP–EWM–SPA method. All credit rating data and evaluation process data are immediately stored in the proposed blockchain framework, and the immutable and traceable nature of blockchain enhances trust between nodes, improving the reliability of the financing credit evaluation process and results. In addition, this study partially fulfills the lack of investigations on blockchain adoption for SMREEs' financing credit.

Article
Publication date: 22 January 2024

Heba Al Kailani, Ghaleb J. Sweis, Farouq Sammour, Wasan Omar Maaitah, Rateb J. Sweis and Mohammad Alkailani

The process of predicting construction costs and forecasting price fluctuations is a significant and challenging undertaking for project managers. This study aims to develop a…

Abstract

Purpose

The process of predicting construction costs and forecasting price fluctuations is a significant and challenging undertaking for project managers. This study aims to develop a construction cost index (CCI) for Jordan’s construction industry using fuzzy analytic hierarchy process (FAHP) and predict future CCI values using traditional and machine learning (ML) techniques.

Design/methodology/approach

The most influential cost items were selected by conducting a literature review and confirmatory expert interviews. The cost items’ weights were calculated using FAHP to develop the CCI formula.

Findings

The results showed that the random forest model had the lowest mean absolute percentage error (MAPE) of 1.09%, followed by Extreme Gradient Boosting and K-nearest neighbours with MAPEs of 1.41% and 1.46%, respectively.

Originality/value

The novelty of this study lies within the use of FAHP to address the ambiguity of the impact of various cost items on CCI. The developed CCI equation and ML models are expected to significantly benefit construction managers, investors and policymakers in making informed decisions by enhancing their understanding of cost trends in the construction industry.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 13 September 2023

Arun Aggarwal, Vinay Kukreja and Kamrunnisha Nobi

The purpose of this study is not only to develop an integrated model of subjective well-being (SWB) by using confirmatory factor analysis (CFA) and structural equation modeling…

Abstract

Purpose

The purpose of this study is not only to develop an integrated model of subjective well-being (SWB) by using confirmatory factor analysis (CFA) and structural equation modeling (SEM) but also to prioritize the subfactors of personality and SWB that affect the contextual performance (CP) of an employee by using a fuzzy-analytical hierarchy process (FAHP), which has not been done in the past.

Design/methodology/approach

The data were collected from 15 field experts and 412 employees of information technology (IT) companies operating in India. The data analysis was performed in two stages. The first stage includes CFA and SEM. The second stage includes prioritizing the factor through FAHP.

Findings

The results of SEM analysis manifested that all the dimensions of personality have a significant impact on CP. However, in the case of SWB, only two components (satisfaction with life and positive affect) have a significant impact on CP. Results of FAHP show that SWB is more important in predicting CP than the Big Five personality dimensions.

Originality/value

This research is a novel attempt to test and prioritize the factors affecting the CP of IT employees. The findings of the research will be useful for managers in increasing the performance of their employees. Further, the findings of the research will contribute to the literature on the factors affecting CP.

Details

International Journal of Quality and Service Sciences, vol. 15 no. 3/4
Type: Research Article
ISSN: 1756-669X

Keywords

Article
Publication date: 8 February 2022

Hassan Ali, Jingwen Zhang, Sheng Liu and Muhammad Shoaib

Due to the fierce market competition, many organizations seek global suppliers because of lower procurement costs and better product quality. However, selecting suitable global…

Abstract

Purpose

Due to the fierce market competition, many organizations seek global suppliers because of lower procurement costs and better product quality. However, selecting suitable global suppliers is one of the complicated decision-making tasks for decision-makers due to the involvement of various qualitative and quantitative factors. The primary purpose of this research is to design an integrated approach for global supplier selection and order allocation in the context of developing an environment-friendly supply chain under data uncertainty.

Design/methodology/approach

Initially, the fuzzy analytical hierarchy process (FAHP) is used to calculate the selected criteria weights. After that, the weights obtained from FAHP are inserted into the fuzzy technique for order preference by similarity to ideal solution (FTOPSIS) to examine the performance of selected suppliers and determine their final ranks. Finally, the obtained results from FTOPSIS are incorporated into the multi-choice goal programming (MCGP) model, which involves multi-aspiration levels to allocate the optimal order quantity to the selected global suppliers.

Findings

A real-time case study of the automotive industry is presented to demonstrate the efficiency and practicality of the suggested approach. The case study and sensitivity analysis results show that the proposed model effectively tackles suppliers' evaluation and order allocation data uncertainty.

Originality/value

Incorporation of risks, environmental management and economic factors during global supplier selection in the automotive sector has not been given much attention in the past literature. So, this research aims to fulfill the gap by developing an integrated approach that can tackle data uncertainty effectively.

Details

Kybernetes, vol. 52 no. 8
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 8 June 2022

Pramod Kumar, Parvinder Singh Brar, Dharmendra Singh and Jaiprakash Bhamu

The purpose of the present work is identification and prioritization of barriers to Lean Six Sigma (LSS) implementation in Indian manufacturing industries in the context of…

362

Abstract

Purpose

The purpose of the present work is identification and prioritization of barriers to Lean Six Sigma (LSS) implementation in Indian manufacturing industries in the context of Industry 4.0 (I4.0) to surmount the impediments in the path of successful implementation.

Design/methodology/approach

In total, 27 barriers identified through critical review of literature and expert's opinion are evaluated with Cronbach's alpha values including item-total correlations or corrected item-total correlations (CITC) using statistical tool. Finally, 20 barriers were analyzed and ranked employing Fuzzy Analytical Hierarchy Process (FAHP).

Findings

The study depicts that “Lack of leadership, advisory and monitoring,” “Lack of clarity about economic benefits” and “Lack of integration of LSS with smart tools/I4.0” are potential barriers to drive the path for proper implementation of LSS in Industry 4.0 with due consideration of its technologies in Indian manufacturing industries.

Practical implications

The study provides better knowledge platform for academicians and researchers about hidden aspects of LSS implementation barriers in view of advanced manufacturing technologies. This research will help the practitioners to design their business plans in implementing new quality improvement tools to get advantage in current competitive environment.

Originality/value

The barriers are selected based on literature and opinion from industry and academic experts. Five major criteria are decided after incorporating inputs. The ranking of the barriers is attained by well standard mathematical technique. This will enable the practitioners to design strategies to eliminate the hindrances in order to shape the right path for effective implementation of LSS approach in view of advanced manufacturing technologies.

Details

International Journal of Productivity and Performance Management, vol. 72 no. 9
Type: Research Article
ISSN: 1741-0401

Keywords

Article
Publication date: 7 March 2022

Amit Kumar Yadav and Dinesh Kumar

The already-strained vaccine supply chain (VSC) of the expanded program for immunization (EPI) require a more robust and structured distribution network for pandemic/outbreak…

Abstract

Purpose

The already-strained vaccine supply chain (VSC) of the expanded program for immunization (EPI) require a more robust and structured distribution network for pandemic/outbreak vaccination due to huge volume demand and time constraint. In this paper, a lean-agile-green (LAG) practices approach is proposed to improve the operational, economic and environmental efficiency of the VSC.

Design/methodology/approach

A fuzzy decision framework of importance performance analysis (IPA)–analytical hierarchy process (AHP)–technique for order for preference by similarity in ideal solution (TOPSIS) has been presented in this paper to prioritize the LAG practices on the basis of the influence on performance indicators. Sensitivity analysis is carried out to check the robustness of the presented model.

Findings

The derived result indicates that sustainable packaging, coordination among supply chain stakeholders and cold chain technology improvement are among the top practices affecting most of the performance parameters of VSC. The sensitivity analysis reveals that the priority of practices is highly dependent on the weightage of performance indicators.

Practical implications

This study's finding will help policymakers reframe strategies for sustainable VSC (SVSC) by including new management practices that can handle regular immunization programs as well as emergency mass vaccination.

Originality/value

To the best of the authors' knowledge, this is the first study that proposes the LAG framework for SVSC. The IPA–Fuzzy AHP (FAHP)–Fuzyy TOPSIS (FTOPSIS) is also a novel combination in decision-making.

Details

International Journal of Productivity and Performance Management, vol. 72 no. 7
Type: Research Article
ISSN: 1741-0401

Keywords

1 – 10 of 107