Open Access
Article
Publication date: 20 February 2023

Emmanuel Chidiebere Eze, Onyinye Sofolahan and Olayinka Gideon Omoboye

Sustainable/Green building materials (SBMs/GBMs) offer a wide range of benefits which cut across the economic, social and environmental dimensions of sustainability. The…

5782

Abstract

Purpose

Sustainable/Green building materials (SBMs/GBMs) offer a wide range of benefits which cut across the economic, social and environmental dimensions of sustainability. The incorporation of these materials in construction projects in most developing countries is still low owing to some factors. This study assessed the major barriers to the incorporation of SBMs in the delivery of construction projects in developing countries, with Nigeria as a case in point.

Design/methodology/approach

The well-structured quantitative questionnaire was used to gather data from the key players in the construction industry, using the snowball sampling method and electronic means of questionnaire administration. Frequencies, percentile, relative importance index, Kruskal–Wallis H test, Kendall's coefficient of concordance and exploratory factor analysis were used to analyse the gathered data.

Findings

The study revealed that the major constructs of barriers to SBM adoption in construction projects are: (1) resistance and information barriers (Eigenvalues = 5.237; % of V = 23.806), (2) regulation and funding of R&D (Eigenvalues = 2.741; % of V = 12.457), (3) cost and market barriers (Eigenvalues = 2.223; % of V = 10.105), (4) government incentive and suppliers' availability (Eigenvalues = 1.728; % of V = 7.852) and (5) GB experts and labour barriers (Eigenvalues = 1.307; % of V = 5.942).

Originality/value

This study assessed the view of construction experts in the five states of the south-eastern geo-political zone of Nigeria, particularly as regards the barriers to the incorporation of sustainable building materials in construction projects in the region.

Details

Frontiers in Engineering and Built Environment, vol. 3 no. 3
Type: Research Article
ISSN: 2634-2499

Keywords

Article
Publication date: 21 February 2024

Emmanuel Chidiebere Eze, Onyinye Sofolahan, Rex Asibuodu Ugulu and Ernest Effah Ameyaw

The purpose of this study is to assess the potential benefits of digital technologies (DTs) in bolstering the circular economy (CE) transition in the construction industry, to…

Abstract

Purpose

The purpose of this study is to assess the potential benefits of digital technologies (DTs) in bolstering the circular economy (CE) transition in the construction industry, to speed up the attainment of sustainable development objectives.

Design/methodology/approach

A detailed literature review was undertaken to identify DTs that could influence CE transition and the benefits of these DTs in the CE transitioning efforts of the construction industry. Based on these, a survey questionnaire was formulated and administered to construction professionals using convenient sampling techniques. With a response rate of 49.42% and data reliability of over 0.800, the gathered data were analysed using frequency and percentage, mean item score, normalisation value, coefficient of variation, Kendall’s coefficient of concordance, analysis of variance and factor analysis.

Findings

This study found that the construction experts agreed that building information modelling, blockchain technology, RFID, drone technology and cloud computing are the leading DTs that have the potential to influence and speed up CE transition in construction. Also, six clusters of benefits of DTs in bolstering EC are quicken CE transition, proactive waste management, recycling and zero waste, data management and decision-making, enhance productivity and performance and resource optimisation.

Originality/value

Studies on the integration of DTs in CE transition are scarce and it is even lacking in the Nigerian context. To the best of the authors’ knowledge, this study is the first to assess the role of DTs in CE transitioning in the Nigerian construction industry.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 19 December 2022

Emmanuel Chidiebere Eze, Douglas Omoregie Aghimien, Clinton Ohis Aigbavboa and Onyinye Sofolahan

This paper aims to present the result of an assessment of the potential effect of building information modelling (BIM) adoption on the reduction of construction waste (CW) from a…

Abstract

Purpose

This paper aims to present the result of an assessment of the potential effect of building information modelling (BIM) adoption on the reduction of construction waste (CW) from a developing country's perspective. This was done with a view to reducing the waste generated in construction projects particularly at the design and pre-contract stages.

Design/methodology/approach

The study adopted a post-positivism philosophical approach, which informed the use of a quantitative research design and a questionnaire as instrument for data collection. The data gathered from construction professionals in the Nigeria construction industry were analysed using an array of statistical tools such as frequency, percentage, Kruskal–Wallis H-test, Kendall's coefficient of concordance, chi-square and exploratory factors analysis.

Findings

The study revealed five major groups of factors causing CW at the design and pre-contract stages that can be avoided or minimised through BIM implementation. These are; (1) errors in design and documentation, (2) specification and quality factors, (3) estimating and site condition factors, (4) planning of work factors and (5) procurement related factors.

Practical implications

The findings of the study offer practical insight for industry participants on the need for BIM implementation to reduce CW by identifying the diverse areas responsible for these waste generation.

Originality/value

While there has been significant literature on BIM implementation, contributions on the effect of this technology in reducing waste generation particular at the design and pre-contract stages in developing countries has been almost non-existent. This study strives to fill in this gap by showcasing the major waste generating activities that can be avoided through the use of BIM.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 29 March 2021

Samuel Ikechukwu Egwunatum, Anthony Chukwunedum Anumudu, Emmanuel Chidiebere Eze and Imoleayo Abraham Awodele

Lack of strict compliance to the principles of total quality management (TQM) by construction organizations has brought about poor quality of the finished building projects. This…

1826

Abstract

Purpose

Lack of strict compliance to the principles of total quality management (TQM) by construction organizations has brought about poor quality of the finished building projects. This has been blamed for the incessant structural failure reported in Nigeria. This study appraised TQM implementation in the Nigerian construction industry, with a view to mitigating structural failure rate of construction projects. To achieve this aim, the study aims to assess the practice level of TQM and the factors hindering TQM implementation on construction projects.

Design/methodology/approach

The study utilized a well-structured questionnaire and convenient sampling method in the gathering and sampling of data among construction professionals in Imo state, Nigeria. Data analyses were done using, frequency, percentage, mean analytics and Pareto analysis.

Findings

The study revealed that major practice of TQM principles with respect to structural failure rate are purchasing: ensuring the procurement of materials of the specified quality standard, ensuring the use of a quality improvement construction process of the organization, site management responsibility: this entails ensuring quality supervision by the project management leadership and monitoring and control of quality during the construction to guarantee firm observance quality standards. Also, the major factors hindering TQM implementation on construction projects are: inadequacy of the necessary machineries, equipment, tools and facilities for the effective execution of work on construction site; breakdown in communication and information exchange between the management and supervisory teams on site; poor attitudes and strategies toward maintenance of equipment, tools and machines; and absence of prompt salary and incentive payment. It was recommended that construction firms must require the suppliers of construction materials to strictly comply with quality specification evidence in quality certification of delivered materials to mitigate structural failure.

Research limitations/implications

This study appraised TQM implementation in the construction industry of Nigeria, with emphasis on Imo state. The study underscores the practice level of TQM and the key factors hindering TQM implementation on construction projects. Following the localized geographical limitation of the study area, a similar research in other part/states of Nigeria or even in other developing countries of African is necessary.

Practical implications

The practices level of TQM and the factors hindering TQM implementation were identified. This will be useful in guiding construction firms, other industry's key stakeholders and regulatory agencies in bringing about a sustainable quality management system for improve profit and value maximization and avoiding incessant structural failure.

Originality/value

This is one of the few studies that have assessed the practice level of TQM and the factors hindering TQM implementation on construction projects in Nigeria. This study took place in Imo state with records of periodic structural failure and building collapse.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords