Search results

1 – 10 of over 2000
Article
Publication date: 9 May 2023

A.J. George and Julie-Anne Tarr

To increase university–industry collaboration and research commercialisation, the Australian government recently introduced the Intellectual Property (IP) Framework, a set of…

Abstract

Purpose

To increase university–industry collaboration and research commercialisation, the Australian government recently introduced the Intellectual Property (IP) Framework, a set of online standard contracts. This follows a predecessor standard contract initiative, the IP Toolkit, which has not previously been evaluated. This paper aims to examine standard contracting in the innovation sector, tracing the policymaking behind the IP Toolkit using the lens of Macneil’s relational contract theory, to assess prospects of success for the new IP Framework, and similar initiatives in other jurisdictions.

Design/methodology/approach

This is a disciplined-configurative case study, drawing on qualitative secondary data analysis and applying Macneil’s relational contracting theory to guide case construction and generate hypotheses around likely success of standard contracting initiatives (stakeholder sentiment, stakeholder adoption). Within-case analysis process-traces development of the IP Toolkit, to discover what the policymakers wanted, knew and computed – and to detail observable implications Macneil’s theory predicts. Its themes are triangulated with multiple sources.

Findings

The case study, via Macneil’s theory, confirms the first hypothesis (resistant stakeholder sentiment) and partly validates the second hypothesis (low levels of adoption), demonstrating limited suitability of standard contracting in the dynamic and highly uncertain space of university–industry collaboration.

Research limitations/implications

The study provides insights into the limited role that standard contracts can play in improving national collaborative research and development performance.

Originality/value

This is a novel theory-driven case study triangulated with previously unpublished data on the IP Toolkit’s website usage, and data from recent consultations on the new IP Framework. It has broader implications for other jurisdictions considering adoption of the standard contract model.

Details

Journal of Science and Technology Policy Management, vol. 15 no. 5
Type: Research Article
ISSN: 2053-4620

Keywords

Article
Publication date: 19 March 2024

Andrew Miller and Adam Vanhove

Drawing on organismic integration theory, we aim to examine whether the reasons independent contractors choose contract work are related to their on-the-job motivation and job…

Abstract

Purpose

Drawing on organismic integration theory, we aim to examine whether the reasons independent contractors choose contract work are related to their on-the-job motivation and job satisfaction and whether their perceived support enhances positive (or buffers negative) effects.

Design/methodology/approach

We collected data at three separate time points from 241 adjunct instructors to test a moderated mediation model using bootstrapping analyses.

Findings

The positive relationship between pull factors (e.g. autonomy) and job satisfaction is fully mediated by the autonomous motivation contractors experienced at work. The inverse relationship between push factors (e.g. inability to secure desired work role) and job satisfaction is not mediated by autonomous nor controlled motivation experienced at work. Contractors' perceived organizational support does not moderate the relationship between either push or pull factors and autonomous motivation. Post hoc analysis shows a moderating effect of perceived supervisor support on the nonlinear relationship between push factors and autonomous motivation.

Practical implications

Recruiting individuals drawn to the benefits of contract work may have important implications for worker motivation, job satisfaction and potentially beyond. Moreover, organizations may consider whether existing support resources and infrastructure are appropriate for contractors.

Originality/value

Despite the abundance of evidence demonstrating the benefits of organizational and supervisor support among traditional employee populations, such support may be of limited value to those drawn to contract work.

Article
Publication date: 10 May 2024

Yueming Cao, Dongjie Zhou and Yunli Bai

This paper aims to examine the impacts of unstable off-farm employment on the probability and stability of farmland rent-out and explore its mechanisms.

Abstract

Purpose

This paper aims to examine the impacts of unstable off-farm employment on the probability and stability of farmland rent-out and explore its mechanisms.

Design/methodology/approach

The paper adopts Ordinary Least Squares (OLS), Probit, Tobit, Order probit models with two-way fixed effects to conduct empirical analysis based on the balanced panel data collected in 2016 and 2023 with a national representativeness sample of 1,206 rural households in 100 villages across 5 provinces in China.

Findings

The empirical results showed that unstable off-farm employment had negative effects on the probability of farmland rent-out, but it had no effects on the stability of farmland rent-out. The mechanism analysis showed that unstable off-farm employment affected the probability of farmland rent-out by decreasing the probability of purchasing houses in city and endowment insurance with high pension. Heterogeneity analysis indicated that the negative effect of unstable off-farm employment was much larger for the households with higher share of labor engaging in off-farm employment outside home county, elder members in the households and those located in the villages of mountain areas.

Originality/value

This paper is the first to define the unstable off-farm employment from the perspective of incontiguous off-farm employment for several years, which could capture the normality rather than particular case in a certain year of off-farm employment among rural labors. Using these new measurements of unstable off-farmland, this paper examined the impacts and mechanisms of share of unstable off-farm employment on the probability and stability of farmland rent-out.

Details

China Agricultural Economic Review, vol. 16 no. 3
Type: Research Article
ISSN: 1756-137X

Keywords

Article
Publication date: 6 April 2023

Gao Shang, Low Sui Pheng and Roderick Low Zhong Xia

The construction industry has arrived at a crossroads of rapid technological progress. While it is foreseen that the advent of new construction technologies will disrupt the…

Abstract

Purpose

The construction industry has arrived at a crossroads of rapid technological progress. While it is foreseen that the advent of new construction technologies will disrupt the construction industry’s future, such disruptions often create the ideal environment for innovation. As poor payment practices continue to plague the construction industry, the advent of smart contracts has created an opportunity to rectify the inherent flaws in the mitigation of payment problems in traditional construction contracts. Given the intrinsic resistance of construction firms to such revolutionary changes, this study aims to understand the various factors influencing the adoption of smart contracts in the Singapore construction industry.

Design/methodology/approach

A mixed method was adopted involving quantifying respondents’ perceptions of the factors influencing smart contract adoption, and validation from a group of interviewees on the matter. Out of 461 registered quantity surveyor members contacted via the Singapore institute of surveyors and valuers website, 55 respondents took part in the survey. This is followed by semi-structured interviews to validate the survey results.

Findings

The findings indicate that construction firms have neither a significant knowledge of nor willingness to adopt smart contracts. A total of 29 institutional factors were also identified that significantly influence the adoption of smart contracts. The quantitative findings were further reinforced by qualitative interviews with five industry experts.

Originality/value

With recognition of and the successful formulation of the significant institutional drivers and barriers, the key findings of this study will be integral in driving the commercial adoption of smart contracts within the construction industry.

Details

Construction Innovation , vol. 24 no. 5
Type: Research Article
ISSN: 1471-4175

Keywords

Abstract

Purpose

Competency frameworks can support public procurement capacity development and performance. However, literature on connecting professionalisation with national procurement contexts is limited. This paper aims to explain and conceptualise recent Romanian experience with developing bespoke competency frameworks at national level for public procurement that reflect the features of the Romanian public procurement system. The approach used could guide in broad-brush, mutatis mutandis, other (national) public procurement systems with comparable features, mainly those seeking a shift from a rather administrative function of public procurement towards a strategic function.

Design/methodology/approach

This case study reflects on the methodology used for analysing the Romanian public procurement environment in EU context to develop bespoke professionalisation instruments, and on ways to integrate competency management approaches in Romanian public procurement culture. That methodological mix has been mainly qualitative and constructionist, within an applied research approach. It combined desk research with empirical research and included legal research in this context.

Findings

A principled, methodological and pragmatic approach tailored to the procurement environment in question is essential for developing competency frameworks capable to resonate to and address the specific practical needs of that procurement system.

Social implications

Competency frameworks can uphold societal objectives through public procurement.

Originality/value

Using valuable insights into the development of the Romanian public procurement competency frameworks, the paper provides a conceptual framework for instilling competency management approaches to public procurement professional development where the latter is governed by a rather distinct, public administration, paradigm. This conceptual framework can guide other public procurement systems and stimulate further research.

Book part
Publication date: 22 July 2024

Paul Spee, Joanna Kho, Anna Jenkins and Paula Jarzabkowski

This study addresses an important yet underdeveloped topic in routine dynamics research: how do routines form? Given the salience of routine formation in new ventures, this study…

Abstract

This study addresses an important yet underdeveloped topic in routine dynamics research: how do routines form? Given the salience of routine formation in new ventures, this study is based on a single, longitudinal case study, following MatchMe, a technology-enabled startup. Building on findings from MatchMe, this study posits routine formation as a layered process. Rather than replacing established routines, routine formation was sequential. New routines were formed in addition to routines that continued to run in parallel. Routine formation was guided by organizational goals and monitoring their attainment. Multiple routines are formed to explore and create possibilities by shifting espoused ideals to attain organizational goals. This study advances routine dynamics in three distinct ways. First, it elaborates on a predominantly binary view of routine formation. Second, it extends work focused on the active creation of patterns. Third, it extends the response and outcomes of routine change, providing avenues for future research to explore strategic consequences of routines for outcomes typically associated with firm performance.

Details

Routine Dynamics: Organizing in a World in Flux
Type: Book
ISBN: 978-1-83549-553-7

Keywords

Open Access
Article
Publication date: 25 July 2024

Per Erik Eriksson

This paper aims to examine how different contextual contingency factors and organizational goals influence construction clients’ decision-making when procuring contractors in the…

Abstract

Purpose

This paper aims to examine how different contextual contingency factors and organizational goals influence construction clients’ decision-making when procuring contractors in the housing sector. More specifically, it investigates how clients’ choice of procurement strategies and organizational control systems is contingent upon various contextual factors and organizational goals.

Design/methodology/approach

It is based on an explorative interview study of clients and contractors in the Swedish housing sector underpinned by a review of organizational control literature.

Findings

The client's knowledge and resources, as well as project complexity and uncertainty, are the most important contextual contingency factors, while property management and sustainable development are the most important organizational goals that housing clients consider when designing procurement strategies.

Research limitations/implications

The paper contributes to the understanding of how construction clients choose procurement strategies, by providing new insights into effects of the mentioned contextual contingency factors and organizational goals on clients’ choice of control systems through their procurement strategies.

Practical implications

Property owners who continuously procure housing projects with sustainability requirements and high degrees of complexity and uncertainty should develop knowledge and resources related to their client role, to enable the design and implementation of appropriate procurement strategies.

Originality/value

Novel aspects of the paper are the demonstration of the value of a holistic approach, considering both contextual contingency factors and organizational goals, when selecting control systems and explicit discussion of how the client's knowledge and resources influence possibilities to implement different control systems.

Details

Journal of Financial Management of Property and Construction , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 12 September 2023

Pramod Malaka Silva, Niluka Domingo and Noushad Ali Naseem Ameer Ali

The construction industry is complex, human-intensive and driven by monetary values. Hence, disputes are widespread. Initial conflicts among parties may develop into a disastrous…

Abstract

Purpose

The construction industry is complex, human-intensive and driven by monetary values. Hence, disputes are widespread. Initial conflicts among parties may develop into a disastrous dispute that costs the project success and good relationships and affects stakeholders' expectations. There has been a focus on causes of construction-related disputes, and studies over the past three decades have attempted to identify a more comprehensive list of reasons for disputes. Some of these studies' limitations were geographical, project delivery methods and project types. The purpose of this study is to identify the most recent and conclusive list of causes of disputes based on current literature by undertaking a systematic literature review (SLR).

Design/methodology/approach

Considering the large number of studies that focused on causes of disputes, this study aims to develop a comprehensive list of causes, using a SLR, as it ensures that all previous articles in multiple databases are reviewed to produce a comprehensive outcome. A six-stage SLR was followed from background study to analysis and reporting.

Findings

Not surprisingly, the number of publications has increased over time, most from the Middle East region. The interconnected nature of the causes was widely emphasised. The SLR has produced eight common core causes of disputes. They are: poor contractual arrangements, employer-initiated scope changes, unforeseen site changes, poor contract understanding and administration, contractor’s quality of works, the inability of the contractor to achieve time targets, non- or delayed payments and poor quality of design. The majority of previous authors realised that disputes could be avoided by parties’ involvement during the early stages, avoiding being opportunistic and acting collaboratively.

Originality/value

Even though numerous studies have been carried out to identify the causes of disputes in the construction industry, none did a SLR. This study aggregates all the previous studies that focused on construction-related disputes systematically. Categorising causes based on the party primarily responsible help various stakeholders by providing a distinct list of factors to avoid that contribute to disputes.

Details

Journal of Financial Management of Property and Construction , vol. 29 no. 2
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 30 April 2024

Junesoo Lee

This article conceptualizes and constructs a comprehensive framework that can better help to answer that question – Who is accountable for social and public problems? …

Abstract

Purpose

This article conceptualizes and constructs a comprehensive framework that can better help to answer that question – Who is accountable for social and public problems? – theoretically and practically.

Design/methodology/approach

Tracing the drivers behind two phenomena “accountability hole” and “accountability black hole”, stemming from “pushing power game” and “pulling power game”, respectively, this study considers (1) the three actors of society: citizens (civil society), corporations (market) and civil servants (government), and (2) the principal-agent relationship between the three actors in the face of social and public problems. As a result, the 4CAs framework that contains the three actors’ collaborative accountabilities to one another is presented.

Findings

The 4CAs model emphasizes (1) all three actors function as agents that are accountable to one another, (2) collaborative accountability beyond collaborative governance and (3) repowering citizens and corporations beyond just empowering them, i.e. returning their inherent rights and obligations to serve one another.

Originality/value

The 4CAs model may function as a descriptive and prescriptive lens through which the trilemma between market failure, government failure and citizen failure can be re-assessed and balanced. The model can also be used as a set of indicators for assessing and helping a society to better resolve the social and public problems collectively.

Details

International Journal of Public Sector Management, vol. 37 no. 4
Type: Research Article
ISSN: 0951-3558

Keywords

Open Access
Article
Publication date: 28 May 2024

Arja Flinkman, Benita Gullkvist and Henri Teittinen

This paper aims to explore how the time and temporal aspects are managed in a financial accounting outsourcing (FAO) transition process in an international interorganizational…

Abstract

Purpose

This paper aims to explore how the time and temporal aspects are managed in a financial accounting outsourcing (FAO) transition process in an international interorganizational context. As a research outcome, the authors identify management interventions of both the service provider (SP) and the outsourcing company (OC) at both the corporate and operational levels.

Design/methodology/approach

The framework by Huy (2001a, 2001b) was used to analyze the qualitative data, which draw on observations, participation in 32 official meetings during the outsourcing process, informal discussions with key actors from the SP and the OC, and archival data of a single case company.

Findings

The authors illustrate how the time and temporal aspects of planned accelerated change are managed through management interventions during the FAO transition process. All four ideal intervention types (commanding, engineering, teaching and socializing) were used sequentially but also jointly to complement one another. The pacing was mostly rapid, owing to strong commanding interventions initiating almost every stage. When analyzing the FAO transition process, the authors identified four stages: contact, contract, convergence and control. Moreover, the authors focused on the role of the operational-level managers and accounting specialists of both organizations. The findings indicate that management interventions vary with the management level.

Originality/value

This study contributes to the interorganizational control literature by considering the time and temporal aspects in planned organizational change and the role of operational-level managers in managing large-scale changes.

Details

Qualitative Research in Accounting & Management, vol. 21 no. 4
Type: Research Article
ISSN: 1176-6093

Keywords

1 – 10 of over 2000