Open Access
Article
Publication date: 19 April 2024

Atupakisye Mwakolo, Meshack Siwandeti, Leticia Mahuwi and Baraka Israel

The study aims to explore the role of procurement of good governance (PGG) on value for money (VfM) achievement in public construction projects. By investigating various…

Abstract

Purpose

The study aims to explore the role of procurement of good governance (PGG) on value for money (VfM) achievement in public construction projects. By investigating various dimensions of PGG, including transparency, accountability, competition and integrity, this study provides insights into how these factors contribute to the successful achievement of VfM outcomes in public construction projects.

Design/methodology/approach

The data were sourced from 203 construction project practitioners from 24 selected procuring entities in Tanzania using a census approach and a cross-sectional questionnaire survey. Confirmatory factor analysis (CFA) and structural equation modelling (SEM) were used for data analysis.

Findings

The findings of the study revealed a positive and significant impact of various dimensions of PGG on VfM. Specifically, transparency, accountability, competition and integrity were positively and significantly related to VfM, with p-values <0.001. Based on the study findings, we conclude that PGG is an important predictor of VfM achievement in public construction projects.

Practical implications

The study offers policy implications for streamlined PGG and VfM achievement in public construction projects. It is suggested that procuring entities can enhance VfM by enforcing compliance with the principles of PGG throughout the entirety of construction projects. In this case, streamlined legislative frameworks and control mechanisms are crucial components that could enhance PGG and the achievement of VfM.

Originality/value

This study contributes to the academic literature on the strategic role of PGG in enhancing VfM achievement. This is one of the research domains, which has not been adequately researched, particularly in Tanzania’s context. In addition, the study provides valuable insights to policymakers, practitioners and stakeholders involved in public construction projects to improve project outcomes and resource allocation.

Details

LBS Journal of Management & Research, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0972-8031

Keywords

Open Access
Article
Publication date: 4 August 2023

Christopher Amoah

In addressing the housing deficits for the less privileged citizens, the South African government began constructing social housing after coming to power in 1994. However, the…

1047

Abstract

Purpose

In addressing the housing deficits for the less privileged citizens, the South African government began constructing social housing after coming to power in 1994. However, the construction of these houses is bedevilled with many issues; prominent among them are poor quality of the constructed houses. This study seeks to develop a quality management framework for achieving quality and efficiency in public-sector housing construction, a hallmark of the country's procurement goals.

Design/methodology/approach

Telephone interviews were conducted with construction professionals involved in constructing government social houses across South Africa, chosen randomly. The data gathered were analysed using the content analysis method.

Findings

The study found that the most significant cause of poor quality government-constructed social housing is multifaceted, categorised into project management-related, procurement-related, contractor-related, corruption-related and political-related.

Practical implications

Failure to develop and implement a quality management framework on government-constructed social housing leads to poor quality social housing.

Originality/value

The study has identified quality-related issues and has developed a Quality Management (QM) framework for the stakeholders involved in the construction of the houses to guide them in the project implementation process to ensure project success and quality standards.

Details

International Journal of Building Pathology and Adaptation, vol. 41 no. 6
Type: Research Article
ISSN: 2398-4708

Keywords

Open Access
Book part
Publication date: 1 May 2019

Tina Karrbom Gustavsson, Anna Kadefors, Sofia Lingegård, Ola Laedre, Ole Jonny Klakegg, Nils Olsson and Johan Larsson

The purpose of the study is to map previous and current construction procurement research to further develop the research in the Nordic counties.

Abstract

Purpose

The purpose of the study is to map previous and current construction procurement research to further develop the research in the Nordic counties.

Design/Methodology/Approach

Mapping of previous and current research based on search in national database. The analysis is based on research perspectives, empirical contexts and research methods.

Findings

That the blind spots are partly overlapping, but that there is potential for knowledge transfer in some areas. There is also the potential for a Nordic research program on one or several of the blind spots.

Research Limitations/Implications

The study is limited to PhD and licentiate-thesis reports in Norway and Sweden. Further research should include the other Nordic countries and a more extensive literature review including journal articles to broaden the scope. Findings have implications on collaborative Nordic research initiatives, knowledge transfer and in a longer perspective on the level of procurement knowledge in industry and society.

Practical Implications

Findings provide a base for future research collaborations, initiatives and applications.

Originality/Value

Findings provide a comprehensive understanding of construction procurement research in the Nordic countries, starting with Norway and Sweden. This understanding is needed for developing research collaborations and applications.

Details

10th Nordic Conference on Construction Economics and Organization
Type: Book
ISBN: 978-1-83867-051-1

Keywords

Open Access
Article
Publication date: 29 March 2022

Neil Govender, Samuel Laryea and Ron Watermeyer

Several researchers in the construction industry have mentioned that quality of tender documents is declining without tangibly assessing quality. Similarly, in practice, no…

2446

Abstract

Purpose

Several researchers in the construction industry have mentioned that quality of tender documents is declining without tangibly assessing quality. Similarly, in practice, no standardised instrument exists to assess tender document quality. Therefore, the aim of this paper was to develop a framework to assess the quality of tender documents produced by built environment professionals in the construction industry. A framework was chosen to address the gaps in theory and practice as it provides a flexible but structured mechanism to assess tender document quality.

Design/methodology/approach

The research methodology contained three stages, namely: multi-investigator triangulation, a workshop with infrastructure experts and framework development and validation. A consolidated list of key quality indicators was developed following the literature review and multi-investigator triangulation. The indicators were discussed with ten experts in the South African construction industry, who were responsible for validating and providing insight on whether additional indicators were required. This informed development of the framework.

Findings

This paper proposes a framework to assess tender document quality by evaluating six key quality indicators namely: accuracy, clarity, completeness, standardisation, relevance and certainty.

Research limitations/implications

The framework is limited to the assessment of tender document quality in the construction industry and is suited to the “Design by Employer” contracting strategy. From an academic perspective, this paper provides researchers with a framework to measure and benchmark quality of tender documents in future studies.

Practical implications

This framework can be used by clients to continuously assess and benchmark quality of tender documents produced by professionals.

Originality/value

A comprehensive and standardised approach to assess tender document quality was not available in the construction literature or the construction industry. Therefore, this paper addressed this gap in knowledge, by providing consumers (clients and contractors) of tender documents and researchers a mechanism to assess quality.

Details

Built Environment Project and Asset Management, vol. 12 no. 4
Type: Research Article
ISSN: 2044-124X

Keywords

Open Access
Article
Publication date: 26 July 2019

Simon van Zoest, Leentje Volker and Marleen Hermans

The purpose of this paper is to address the barriers that Dutch housing associations encounter in implementing new procurement strategies.

5455

Abstract

Purpose

The purpose of this paper is to address the barriers that Dutch housing associations encounter in implementing new procurement strategies.

Design/methodology/approach

Several aspects of purchasing, portfolio management, project delivery and supply management are discussed in relation to the changing role of housing associations as semi-public commissioning bodies in the Dutch construction industry, based on data derived from workshops with six Dutch housing associations.

Findings

Housing associations are adapting their procurement strategy towards a more integrative and performance-based approach to supply management. Due to the complexity of implementing this process, housing associations struggle especially with moving beyond pilot projects, increasing the maturity levels throughout the organisation and aligning new policies with daily practices at a tactical and an operational level.

Practical implications

Increased knowledge of change processes and seeing the potential of maturity models will be valuable for practitioners who are dealing with changes on the work floor.

Social implications

Client organisations are considered one of the key drivers of change in the construction industry. Insights into these particular organisational change processes contribute to the potential of industry reform.

Originality/value

Most studies on collaboration and integration in the supply chain focus on the inter-organisational level or on the supply side, rather than the internal organisation of the client.

Details

International Journal of Managing Projects in Business, vol. 13 no. 2
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 3 February 2020

Paulos A. Wondimu, Ole Jonny Klakegg and Ola Lædre

Early contractor involvement (ECI) faces many barriers because it differs from traditional business practices. Public owners, especially, face a major challenge because they must…

9447

Abstract

Purpose

Early contractor involvement (ECI) faces many barriers because it differs from traditional business practices. Public owners, especially, face a major challenge because they must comply with international and national legislation. The purpose of this paper is to develop a framework that illustrates the various approaches that public project owners can take to implement ECI.

Design/methodology/approach

In addition to a literature review, three groups of case studies were carried out. The case studies were based on 54 semi-structured in-depth interviews with key personnel from 21 Norwegian public projects and document study.

Findings

In all, 25 approaches to ECI were identified during the research. Twelve of these were used in the cases studied.

Social implications

There are several approaches to ECI that are suitable for public owners. However, the contractor’s contribution depends on which approach is implemented and how it is implemented.

Originality/value

As original contribution, this study presents a novel framework that defines options for implementing ECI in public projects. Furthermore, this paper provides insights on how ECI can be implemented in public projects based on Norwegian experiences. Although the empirical data of the study is limited to Norwegian public projects, this study contributes to knowledge about how to implement ECI internationally.

Details

Journal of Public Procurement, vol. 20 no. 1
Type: Research Article
ISSN: 1535-0118

Keywords

Open Access
Book part
Publication date: 1 May 2019

Melissa Candel and Tina Karrbom Gustavsson

Previous research on clients’ procurement typically focuses on their procurement strategies. Research on local sustainability governance has, however, revealed that municipalities…

Abstract

Purpose:

Previous research on clients’ procurement typically focuses on their procurement strategies. Research on local sustainability governance has, however, revealed that municipalities also govern construction projects through land allocations. This paper aims to explore how housing developers are governed by municipal land allocations and the implications. The purpose is to problematize the governance of sustainability during the early phases of construction projects.

Design/Methodology/Approach:

A case study on an urban development project in Sweden was conducted. Empirical material consists of interviews with housing developers’ project managers, observations from seminars and meetings between the developers and municipality officials and the municipality’s policy for land allocations and sustainability program. This was analyzed using Bulkeley and Kern’s (2006) typology of modes of governing change at the local level as a framework.

Findings:

The results provide examples where the municipality governs the housing developers by authority, enabling and provision. The implications for the housing developers during the early phases of their construction projects are explored.

Research limitations/implications:

Findings have implications for research on clients’ procurement strategies because it illustrates how they can be governed during the early phases of certain construction projects, which might limit their flexibility during procurement. However, the study is only based on housing projects in one urban development project governed by one municipality.

Practical implications:

Findings provide support for clients when designing their procurement strategies.

Originality/value:

This paper contributes to the understanding of how sustainability is governed in construction projects and the implications for housing developers’ flexibility.

Details

10th Nordic Conference on Construction Economics and Organization
Type: Book
ISBN: 978-1-83867-051-1

Keywords

Open Access
Article
Publication date: 20 March 2020

Debby Willar, Estrellita Varina Yanti Waney, Daisy Debora Grace Pangemanan and Rudolf Estephanus Golioth Mait

In responding to global issues of creating sustainable development, the Indonesian government has enacted regulations (i.e. Ministry of Public Works and Housing No. 05/PRT/M/2015…

17282

Abstract

Purpose

In responding to global issues of creating sustainable development, the Indonesian government has enacted regulations (i.e. Ministry of Public Works and Housing No. 05/PRT/M/2015) on the implementation of sustainable construction in infrastructure project execution. The purpose of this paper is to evaluate the means of implementing sustainable principles in the execution of infrastructure projects in Indonesia by the main construction service providers and their partners. A lesson-learned is presented as a source of knowledge to underpin the extensive implementation of sustainable principles in the construction of infrastructure projects leading to an integrated approach in creating a sustainable infrastructure that fulfills the requirements of sustainable development.

Design/methodology/approach

The method used is questionnaire surveys with Indonesian construction practitioners who are working on building construction, road and bridge construction, water facilities construction and house and settlement construction.

Findings

From the results, the practices of sustainability principles by construction service providers in infrastructure project execution are imperative from the project procurement phase. The evaluation continues to the phase of construction project execution, which reveals the inconsiderable performance of sustainability indicators due to current constraints on the implementation of sustainability principles.

Originality/value

This research looks into the existing gaps between sustainable construction principles and their practical implementation in Indonesian infrastructure projects. This will foster a holistic approach in the practice of undertaking sustainable procurement processes, thus reinforcing project management techniques in the phase of sustainable construction project execution. This also strengthens the interrelated roles and responsibilities of project stakeholders by taking into account principles of safety, balance and the harmony of infrastructure and the environment.

Details

Smart and Sustainable Built Environment, vol. 10 no. 1
Type: Research Article
ISSN: 2046-6099

Keywords

Content available
Article
Publication date: 4 January 2022

Sandra G. Hamilton

This paper examines the role of government procurement as a social policy mechanism within a multilateral open trading system. Government regulations globally are being…

2955

Abstract

Purpose

This paper examines the role of government procurement as a social policy mechanism within a multilateral open trading system. Government regulations globally are being transformed to foster more responsible business conduct in multinational enterprises (MNEs). Yet, concern that sustainability may present a discriminatory barrier to trade has stalled the progress of sustainable public procurement (SPP) at the international level, raising questions regarding the role and scope of the World Trade Organisation’s (WTO) Government Procurement Agreement (GPA) to align taxpayer-funded contracts with the United Nations (UN) Sustainable Development Goals.

Design/methodology/approach

With a focus on social sustainability, this paper reviews the grey and academic literature to assess the changing landscape of public procurement policy and supply chain legislation in high-income countries.

Findings

Frontrunner nations are adopting a mandatory approach to sustainable public procurement and due diligence legislation is elevating supply chain risk from reputational damage to legal liability. While technological innovation and the clean, green production of manufactured goods dominates the sustainable public procurement literature, the social aspects of sustainability poverty, inequality and human rights remain underrepresented.

Research limitations/implications

The scope of this paper is limited to the examination of government procurement covered by the WTO-GPA (2012). Smaller value contracts, under the WTO-GPA thresholds and the category of defence are beyond the scope of the paper.

Social implications

The paper focusses on the underserved topic of social sustainability in business-to-government (B2G) – business to government – supply chains arguing that for responsible business conduct to become a competitive advantage, it must be more meaningfully rewarded on the demand-side of all taxpayer-funded contracts in organisation for economic co-operation and development countries. The paper introduces the idea of priceless procurement as a mechanism to build system capacity in the evaluation of non-financial sustainability objectives.

Originality/value

To build the capacity to stimulate competition based on social and environmental policy objectives, the paper introduces the concept of priceless procurement in B2G contracts.

Open Access
Article
Publication date: 6 July 2022

Klara Granheimer, Tina Karrbom Gustavsson and Per Erik Eriksson

Prior research has emphasised the importance of the early phases of construction projects, as well as the difficulties of procuring engineering services – especially due to the…

Abstract

Purpose

Prior research has emphasised the importance of the early phases of construction projects, as well as the difficulties of procuring engineering services – especially due to the uncertainties. Despite that, studies on the public procurement of engineering services are scarce. Although scholars have shown that uncertainty may affect the choice of control modes, the level of uncertainty that characterises services is not addressed by the two task characteristics: knowledge of the transformation process and output measurability. The purpose is to investigate organisational control in public procurement of engineering services.

Design/methodology/approach

The existing control model was adjusted in this study by conceptually adding uncertainty as a third aspect to the two task characteristics. A single case study of the Swedish Transport Administration was used. The empirical data, comprising 14 interviews with managers from the client and engineering consulting companies, were analysed using flexible pattern matching and visual mapping approaches and then illustrated using the model.

Findings

The public client did not base its choice of control modes on uncertainty, but rather on the other two task characteristics. Consequently, the service providers argued that the chosen control modes reduced their creativity, increased their financial risks and caused unclear responsibilities. This study therefore shows that uncertainty is an important factor to consider in the choice of control modes, both from a theoretical perspective and from the service providers' point of view. The developed model may therefore be useful for researchers as well as practitioners.

Originality/value

This study is the first attempt to add uncertainty as a task characteristic when choosing control modes. The results contribute to the scarce control literature regarding the procurement of engineering services for construction projects and the procurement of other services with high uncertainty.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords