Publication date: 14 December 2022

Ahsan Nawaz and Francis Lanme Guribie

Social procurement (SP) is a complicated and risky innovation, the adoption of which needs to be accompanied by complementary process and organizational change. To date, however…

Abstract

Purpose

Social procurement (SP) is a complicated and risky innovation, the adoption of which needs to be accompanied by complementary process and organizational change. To date, however, there has been little empirical evidence explaining whether and how different sorts of external pressures affect the level of SP adoption in the construction sector. Drawing on institutional theory, this study aims to analyze how three types of isomorphic pressures (i.e. coercive, mimetic and normative pressures) influence the adoption of SP in the construction sector.

Design/methodology/approach

The impacts of these pressures are empirically tested with survey data collected from 134 construction firms in the Chinese construction industry.

Findings

The findings show that both coercive and mimetic pressures have a considerable impact on the adoption of SP. However, there is little evidence in this study that normative demands had a major impact on SP.

Practical implications

This research is a useful instrument for promoting a favorable social attitude regarding construction procurement. Through socioeconomic regeneration and development, procurement can be considered as a significant route for social transformation, economic development and poverty reduction.

Originality/value

This study addresses the paucity of research into SP in the construction industry by establishing the institutional drivers to procuring services and products from a social enterprise perspective. Findings from this study extend the frontiers of existing knowledge on SP in the construction industry.

Details

Construction Innovation , vol. 24 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 6 July 2022

Klara Granheimer, Tina Karrbom Gustavsson and Per Erik Eriksson

Prior research has emphasised the importance of the early phases of construction projects, as well as the difficulties of procuring engineering services – especially due to the…

Abstract

Purpose

Prior research has emphasised the importance of the early phases of construction projects, as well as the difficulties of procuring engineering services – especially due to the uncertainties. Despite that, studies on the public procurement of engineering services are scarce. Although scholars have shown that uncertainty may affect the choice of control modes, the level of uncertainty that characterises services is not addressed by the two task characteristics: knowledge of the transformation process and output measurability. The purpose is to investigate organisational control in public procurement of engineering services.

Design/methodology/approach

The existing control model was adjusted in this study by conceptually adding uncertainty as a third aspect to the two task characteristics. A single case study of the Swedish Transport Administration was used. The empirical data, comprising 14 interviews with managers from the client and engineering consulting companies, were analysed using flexible pattern matching and visual mapping approaches and then illustrated using the model.

Findings

The public client did not base its choice of control modes on uncertainty, but rather on the other two task characteristics. Consequently, the service providers argued that the chosen control modes reduced their creativity, increased their financial risks and caused unclear responsibilities. This study therefore shows that uncertainty is an important factor to consider in the choice of control modes, both from a theoretical perspective and from the service providers' point of view. The developed model may therefore be useful for researchers as well as practitioners.

Originality/value

This study is the first attempt to add uncertainty as a task characteristic when choosing control modes. The results contribute to the scarce control literature regarding the procurement of engineering services for construction projects and the procurement of other services with high uncertainty.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 3 July 2023

Siraj Ahmed, Jukka Majava and Kirsi Aaltonen

The purpose of this study is to investigate the benefits and challenges of implementing circular economy (CE), as well as shed light on the influence of procurement strategy in CE…

3484

Abstract

Purpose

The purpose of this study is to investigate the benefits and challenges of implementing circular economy (CE), as well as shed light on the influence of procurement strategy in CE implementation in construction projects.

Design/methodology/approach

A qualitative research approach with abductive reasoning was adopted. The empirical data were collected from the construction industry in the United Arab Emirates (UAE).

Findings

The results reveal that clients, consultants and contractors have limited awareness, knowledge and motivation to implement CE in construction projects. The absence of incentives to design projects following CE principles, lack of involvement of contractors and suppliers, non-use of materials that use CE principles and current procurement strategies are the main challenges for the implementation of CE in the UAE.

Originality/value

Previous research offers limited knowledge on CE and its implementation in construction projects particularly from a procurement strategy perspective. The findings of the study provide new knowledge of the benefits, challenges and role of procurement strategy for implementing CE. It is suggested that collaborative and partnering-based procurement methods are needed to facilitate the effective implementation of CE.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 21 July 2022

Anna-Therése Järvenpää, Johan Larsson and Per Erik Eriksson

This paper aims to identify how a public client’s use of control systems (process, output and social control) affect innovation possibilities in construction projects.

Abstract

Purpose

This paper aims to identify how a public client’s use of control systems (process, output and social control) affect innovation possibilities in construction projects.

Design/methodology/approach

Semi-structured interviews about six infrastructure projects were conducted to identify respondents’ views on innovation possibilities. These possibilities were then analyzed from an organizational control perspective within principal–agent relationships between the Swedish Transport Administration (STA) and their contractors.

Findings

How the client uses control systems affects innovation possibilities. Relying on process control could negatively affect innovation opportunities, whereas output control could have a positive influence. In addition, social control seems to have a weak effect, as the STA appears not to use social control to facilitate joint innovation. Public clients must comply with the Public Procurement Act and, therefore, retain the requirements specified in the tendering documents. Much of the steering of the execution is connected to the ex ante phase (before signing the contract), which affects innovation possibilities in the design and execution phases for the contractor.

Research limitations/implications

This study was conducted with only one client, thus limiting its generalizability. However, the findings provide an important stepping stone to further investigation into balancing control systems and creating innovation possibilities in a principal–agent relationship.

Originality/value

Although public procurement has increasingly been emphasized as a major potential source of innovation, studying how a public client’s use of organizational control systems affects innovation possibilities in the construction sector has received scant attention.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 26 April 2024

Luís Jacques de Sousa, João Poças Martins and Luís Sanhudo

Factors like bid price, submission time, and number of bidders influence the procurement process in public projects. These factors and the award criteria may impact the project’s…

Abstract

Purpose

Factors like bid price, submission time, and number of bidders influence the procurement process in public projects. These factors and the award criteria may impact the project’s financial compliance. Predicting budget compliance in construction projects has been traditionally challenging, but Machine Learning (ML) techniques have revolutionised estimations.

Design/methodology/approach

In this study, Portuguese Public Procurement Data (PPPData) was utilised as the model’s input. Notably, this dataset exhibited a substantial imbalance in the target feature. To address this issue, the study evaluated three distinct data balancing techniques: oversampling, undersampling, and the SMOTE method. Next, a comprehensive feature selection process was conducted, leading to the testing of five different algorithms for forecasting budget compliance. Finally, a secondary test was conducted, refining the features to include only those elements that procurement technicians can modify while also considering the two most accurate predictors identified in the previous test.

Findings

The findings indicate that employing the SMOTE method on the scraped data can achieve a balanced dataset. Furthermore, the results demonstrate that the Adam ANN algorithm outperformed others, boasting a precision rate of 68.1%.

Practical implications

The model can aid procurement technicians during the tendering phase by using historical data and analogous projects to predict performance.

Social implications

Although the study reveals that ML algorithms cannot accurately predict budget compliance using procurement data, they can still provide project owners with insights into the most suitable criteria, aiding decision-making. Further research should assess the model’s impact and capacity within the procurement workflow.

Originality/value

Previous research predominantly focused on forecasting budgets by leveraging data from the private construction execution phase. While some investigations incorporated procurement data, this study distinguishes itself by using an imbalanced dataset and anticipating compliance rather than predicting budgetary figures. The model predicts budget compliance by analysing qualitative and quantitative characteristics of public project contracts. The research paper explores various model architectures and data treatment techniques to develop a model to assist the Client in tender definition.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 23 May 2023

Olabode Emmanuel Ogunmakinde, Temitope Egbelakin, Willy Sher, Temitope Omotayo and Mercy Ogunnusi

Establishing a more sustainable built environment is an increasing global concern for the construction industry. Despite the intrinsic and extrinsic obstacles the stakeholders…

Abstract

Purpose

Establishing a more sustainable built environment is an increasing global concern for the construction industry. Despite the intrinsic and extrinsic obstacles the stakeholders face, huge efforts are required to transition to a smooth, sustainable construction (SC) practice. This study identifies and discusses cogent obstacles to SC in developing nations.

Design/methodology/approach

The Preferred Reporting Item for systematic reviews and Meta-Analysis (PRISMA) approach was employed to establish research work in SC for developing countries. The databases used were Scopus and Web of Science. Meta-analysis of keywords was analysed thematically. The initial broad search returned 8,420 publications which were filtered and reviewed in-depth to fit the aim of the study, produced only 21 relevant publications from the years 2000–2021.

Findings

The four identified themes of obstacles to SC in developing countries are as follows: construction professional training and education, clients' attitudes and awareness, construction industries' culture and capacity and governments' regulation, policies and economy. The key barriers identified from the meta-analysis include inadequate training and education amongst construction professionals, poor execution of sustainability ethics, poor populace attitude towards sustainability, poor awareness and understanding, dearth of precise data and integrated study and inappropriate priorities about sustainability.

Originality/value

The originality in this study are themes drawn from millennium development goals (MDGs) and sustainable development goals (SDGs) publications related to SC. Consequently, the final framework presented a holistic approach to surmounting the established limitations and aided recommendations for future studies. Thus, setting a background for developing strategies to overcome the limitations and further attain sustainable development (SD).

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Open Access
Article
Publication date: 16 October 2023

Emmanuel Dele Omopariola, Abimbola Olukemi Windapo, David John Edwards, Clinton Ohis Aigbavboa, Sunday Ukwe-Nya Yakubu and Onimisi Obari

Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective…

Abstract

Purpose

Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective project cash flow process. However, scant research has been undertaken to empirically establish the cash flow performance and domino effect of APS on project and organisational performance.

Design/methodology/approach

The epistemological design adopted a positivist philosophical stance augmented by deductive reasoning to explore the phenomena under investigation. Primary quantitative data were collected from 504 Construction Industry Development Board (CIDB) registered contractors (within the grade bandings 1–9) in South Africa. A five-point Likert scale was utilised, and subsequent data accrued were analysed using structural equation modelling (SEM).

Findings

Emergent findings reveal that the mandatory use of an APS does not guarantee a positive project cash flow, an improvement in organisational performance or an improvement in project performance.

Practical implications

The ensuing discussion reveals the contributory influence of APS on positive cash flow and organisational performance, although APS implementation alone will not achieve these objectives. Practically, the research accentuates the need for various measures to be concurrently adopted (including APS) towards ensuring a positive project cash flow and improved organisational and project performance.

Originality/value

There is limited empirical research on cash flow performance and the domino effect of APS on project and organisational performance in South Africa, nor indeed, the wider geographical location of Africa as a continent. This study addresses this gap in the prevailing body of knowledge.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 7 May 2024

Portia Atswei Tetteh, Michael Nii Addy, Alex Acheampong, Isaac Akomea-Frimpong, Ebenezer Ayidana and Frank Ato Ghansah

The construction industry is one of the most hazardous working environments globally. Studies reveal that wearable sensing technologies (WSTs) have practical applications in…

Abstract

Purpose

The construction industry is one of the most hazardous working environments globally. Studies reveal that wearable sensing technologies (WSTs) have practical applications in construction occupational health and safety management. In the global south, the adoption of WSTs in construction has been slow with few studies investigating the critical drivers for its adoption. The purpose of this study is to investigate the factors driving WSTs adoption in Ghana where investment in such technologies can massively enhance health and safety through effective safety monitoring.

Design/methodology/approach

To meet the objectives of this study, research data was drawn from 210 construction professionals. Purposive sampling technique was used to select construction professionals in Ghana and data was collected with the use of well-structured questionnaires. The study adopted the fuzzy synthetic evaluation model (FSEM) to determine the significance of the critical drivers for the adoption of WSTs.

Findings

According to the findings, perceived value, technical know-how, security, top management support, competitive pressure and trading partner readiness obtained a high model index of 4.154, 4.079, 3.895, 3.953, 3.971 and 3.969, respectively, as critical drivers for WSTs adoption in Ghana. Among the three broad factors, technological factors recorded the highest index of 3.971, followed by environmental factors and organizational factors with a model index of 3.938 and 3.916, respectively.

Practical implications

Theoretically, findings are consistent with studies conducted in developed countries, particularly with regard to the perceived value of WSTs as a key driver in its adoption in the construction industry. This study also contributes to the subject of WSTs adoption and, in the case of emerging countries. Practically, findings from the study can be useful to technology developers in planning strategies to promote WSTs in the global south. To enhance construction health and safety in Ghana, policymakers can draw from the findings to create conducive conditions for worker acceptance of WSTs.

Originality/value

Studies investigating the driving factors for WSTs adoption have mainly centered on developed countries. This study addresses this subject in Ghana where studies on WSTs application in the construction process are uncommon. It also uniquely explores the critical drivers for WSTs adoption using the FSEM.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 7 May 2024

Yazeed A. Alragabah and Mohd. Ahmed

There is a limited number of research work on critical success factors (CSFs) in public construction projects in Saudi Arabia. In response to this knowledge gap, the objective of…

Abstract

Purpose

There is a limited number of research work on critical success factors (CSFs) in public construction projects in Saudi Arabia. In response to this knowledge gap, the objective of this paper is to assess the impact of CSFs on the government construction projects in Saudi Arabia. The success factors are investigated from a broader consideration of failure criteria, from consideration of most effectiveness in successful project completion and also from consideration of the impact of implementing control processes for successful project completion.

Design/methodology/approach

This study has analysed the impact of success factors on construction projects in Saudi Arabia using a descriptive methodology. An exhaustive literature survey is undertaken to identify the success and failure factors related to government construction projects in Saudi Arabia. The survey data are sorted out and analysed by cost, schedule, technical, context and finance dimensions of the projects based on project types, engineering complexity, size, modality, jurisdictional control and funding approach. To evaluate the influence of success factors implementation, qualitative data were collected in a survey via a web-based questionnaire that was sent to officials working and occupying a responsible position in national project guidelines organizations and in government construction organizations in Saudi Arabia. In all, 28 CSFs were identified, ranked and evaluated for their impact on project success. The four identified factors belong to process categories of construction projects, nine factors belong to management of construction projects and 15 success factors are identified for impact assessment of implementation in construction projects.

Findings

The study's findings have identified and ranked the top five CSFs that significantly influence project outcomes, including meeting time targets, adhering to financial budgets, delivering desired outcomes for all stakeholders, effectively managing risks and assembling the appropriate team while optimizing resource allocation. Additionally, the research indicates that hindrances to projects primarily stem from execution, economic, human and political factors. The study advocates for strict controls over incomplete engineering designs and advises against contractors independently handling design work to ensure project success. Additionally, addressing contractors' qualifications and financial matters is crucial for project success. By highlighting these CSFs and challenges, the research provides actionable insights to enhance project management practices in the construction industry.

Research limitations/implications

This study is limited to the infrastructure projects constructed by governmental bodies with the participation of officials from government organizations. Further study, including private projects and officials working on private projects, may be needed to generalized the research outcome.

Originality/value

Numerous studies have investigated CSFs in construction projects, but few have examined their relevance to Saudi Arabian government projects. This study aims to fill this gap by identifying key CSFs specific to Saudi Arabian public sector construction projects and assessing their impact on project success. It advocates for stringent controls in the Saudi Arabian construction sector, emphasizing the importance of preventing incomplete or altered engineering designs by contractors to increase the success rate of public sector projects. This research offers practical insights to stakeholders, advancing project management practices in Saudi Arabia's construction sector for improved outcomes and resource utilization.

Details

Frontiers in Engineering and Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2634-2499

Keywords

Article
Publication date: 13 October 2022

Arka Ghosh, Jemal Abawajy and Morshed Chowdhury

This study aims to provide an excellent overview of current research trends in the construction sector in digital advancements. It provides a roadmap to policymakers for the…

Abstract

Purpose

This study aims to provide an excellent overview of current research trends in the construction sector in digital advancements. It provides a roadmap to policymakers for the effective utilisation of emergent digital technologies and a need for a managerial shift for its smooth adoption.

Design/methodology/approach

A total of 3,046 peer-reviewed journal review articles covering Internet of Things (IoT), blockchain, building information modelling (BIM) and digital technologies within the construction sector were reviewed using scientometric mapping and weighted mind-map analysis techniques.

Findings

Prominent research clusters identified were: practice-factor-strategy, system, sustainability, BIM and construction worker safety. Leading countries, authors, institutions and their collaborative networks were identified with the UK, the USA, China and Australia leading this field of research. A conceptual framework for an IoT-based concrete lifecycle quality control system is provided.

Originality/value

The study traces the origins of the initial application of Industry 4.0 concepts in the construction field and reviews available literature from 1983 to 2021. It raises awareness of the latest developments and potential landscape realignment of the construction industry through digital technologies conceptual framework for an IoT-based concrete lifecycle quality control system is provided.

Details

Construction Innovation , vol. 24 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

1 – 10 of 131