Open Access
Article
Publication date: 4 July 2022

Shiyu Wan, Yisheng Liu, Grace Ding, Goran Runeson and Michael Er

This article aims to establish a dynamic Energy Performance Contract (EPC) risk allocation model for commercial buildings based on the theory of Incomplete Contract. The purpose…

1575

Abstract

Purpose

This article aims to establish a dynamic Energy Performance Contract (EPC) risk allocation model for commercial buildings based on the theory of Incomplete Contract. The purpose is to fill the policy vacuum and allow stakeholders to manage risks in energy conservation management by EPCs to better adapt to climate change in the building sector.

Design/methodology/approach

The article chooses a qualitative research approach to depict the whole risk allocation picture of EPC projects and establish a dynamic EPC risk allocation model for commercial buildings in China. It starts with a comprehensive literature review on risks of EPCs. By modifying the theory of Incomplete Contract and adopting the so-called bow-tie model, a theoretical EPC risk allocation model is developed and verified by interview results. By discussing its application in the commercial building sector in China, an operational EPC three-stage risk allocation model is developed.

Findings

This study points out the contract incompleteness of the risk allocation for EPC projects and offered an operational method to guide practice. The reasonable risk allocation between building owners and Energy Service Companies can realize their bilateral targets on commercial building energy-saving benefits, which makes EPC more attractive for energy conservation.

Originality/value

Existing research focused mainly on static risk allocation. Less research was directed to the phased and dynamic risk allocation. This study developed a theoretical three-stage EPC risk allocation model, which provided the theoretical support for dynamic EPC risk allocation of EPC projects. By addressing the contract incompleteness of the risk allocation, an operational method is developed. This is a new approach to allocate risks for EPC projects in a dynamic and staged way.

Details

International Journal of Climate Change Strategies and Management, vol. 15 no. 4
Type: Research Article
ISSN: 1756-8692

Keywords

Content available
Article
Publication date: 1 August 2005

75

Abstract

Details

Anti-Corrosion Methods and Materials, vol. 52 no. 4
Type: Research Article
ISSN: 0003-5599

Keywords

Open Access
Article
Publication date: 30 August 2022

Petteri Annunen, Juho Tella, Sini Pekki and Harri Haapasalo

This study describes how maintenance capability should be created during the design and construction phases of construction projects. Purpose of the abstract to define the…

1857

Abstract

Purpose

This study describes how maintenance capability should be created during the design and construction phases of construction projects. Purpose of the abstract to define the elements for creating the maintenance capability and the process to be used in construction life cycle projects for buildings.

Design/methodology/approach

An inductive and qualitative research method was used to construct the proposed process based on the literature and 18 interviews in two large construction companies.

Findings

The results indicate that the maintenance phase is usually overlooked during the design and construction phases, and capabilities are not systematically built. In particular, processes are lacking in data management, causing severe problems in maintenance.

Originality/value

This study presents a process including key requirements and activities for creating maintenance capability in conjunction with the design and construction phases, which is novel to the literature. The validated process can be adapted based on the needs of the construction company.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Open Access
Article
Publication date: 3 April 2018

Eloise Grove, Andrew Dainty, Derek Thomson and Tony Thorpe

The intra-organisational relationships of through-life support services providers are complex, especially given the multifaceted nature of the provision required. For example…

3264

Abstract

Purpose

The intra-organisational relationships of through-life support services providers are complex, especially given the multifaceted nature of the provision required. For example, capabilities within the UK highways maintenance arena must support engineering design, routine maintenance and the on-going management of the network. While collaboration in construction projects has formed a major research focus in recent years, there is a paucity of work examining collaboration in-flight.

Design/methodology/approach

Through a micro-practices approach, two contracts delivering highway infrastructure maintenance and renewal services are examined to explore the intra-organisational relationships that determine the quality of service delivered.

Findings

Despite the rhetoric of collaboration and integrated working that pervades the contemporary project discourse, there was a clear focus on addressing immediate technical and commercial concerns, rather than on creating the conditions for integrated working to flourish. On the occasions where the collaborative environment was prioritised, a more integrated service was delivered.

Originality/value

In contrast to other accounts of the ways collaborative working shapes performance, this research reveals an acute need for a sustained collaborative effort; as soon as “collaborative working” was normalised, the level of integration and seamlessness of service was diminished. This questions normative notions of what defines collaborative working in projects and suggests a need for re-framing it as an on-going accomplishment of actors involved. Such a perspective resonates with notions of “organizational becoming”, particularly in that attempts to foster collaboration are themselves constitutive of the unfolding and shifting nature of intra-organisational relationships that emerge in complex contractual arrangements.

Details

Journal of Financial Management of Property and Construction, vol. 23 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Open Access
Article
Publication date: 10 June 2021

Emilia Nilsson Vestola, Per Erik Eriksson, Johan Larsson and Tina Karrbom Gustavsson

The purpose of this paper is to explore the interdependencies between temporary and permanent aspects of project organizing and how they affect the management of public…

3430

Abstract

Purpose

The purpose of this paper is to explore the interdependencies between temporary and permanent aspects of project organizing and how they affect the management of public infrastructure operation and maintenance (O&M) activities.

Design/methodology/approach

The paper applies a case study approach and uses Lundin and Söderholm's (1995) framework of the temporary organization (with the themes of time, task, team and transition) to distinguish between temporary and permanent aspects of organizing two infrastructure O&M projects.

Findings

This paper adds to the literature on temporary organizations by recognizing a mixture of temporary and permanent aspects of project organizing in an empirical project-level example. In line with previous research, the themes of time, task, team and transition were shown to be interdependent. Furthermore, the paper broadens the theory of temporary organizations by presenting a project organization with significant permanent aspects.

Practical implications

Project managers of public sector projects need to be aware of the possible mixture of temporary and permanent aspects of project organizing. Management of projects that are found to have a mixture of temporary and permanent aspects should combine the perspectives and management practices of both temporary and permanent organizing. Not acknowledging permanent aspects could lead to management that is not adapted to the prerequisites of project organizing in this context.

Originality/value

The findings further develop the literature on temporary organizations by recognizing that there is not only a mixture of temporary and permanent aspects between the temporary organization and its permanent environment but there is also a mixture of temporary and permanent aspects of organizing within project organizations.

Details

International Journal of Managing Projects in Business, vol. 14 no. 7
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 26 July 2019

Simon van Zoest, Leentje Volker and Marleen Hermans

The purpose of this paper is to address the barriers that Dutch housing associations encounter in implementing new procurement strategies.

5451

Abstract

Purpose

The purpose of this paper is to address the barriers that Dutch housing associations encounter in implementing new procurement strategies.

Design/methodology/approach

Several aspects of purchasing, portfolio management, project delivery and supply management are discussed in relation to the changing role of housing associations as semi-public commissioning bodies in the Dutch construction industry, based on data derived from workshops with six Dutch housing associations.

Findings

Housing associations are adapting their procurement strategy towards a more integrative and performance-based approach to supply management. Due to the complexity of implementing this process, housing associations struggle especially with moving beyond pilot projects, increasing the maturity levels throughout the organisation and aligning new policies with daily practices at a tactical and an operational level.

Practical implications

Increased knowledge of change processes and seeing the potential of maturity models will be valuable for practitioners who are dealing with changes on the work floor.

Social implications

Client organisations are considered one of the key drivers of change in the construction industry. Insights into these particular organisational change processes contribute to the potential of industry reform.

Originality/value

Most studies on collaboration and integration in the supply chain focus on the inter-organisational level or on the supply side, rather than the internal organisation of the client.

Details

International Journal of Managing Projects in Business, vol. 13 no. 2
Type: Research Article
ISSN: 1753-8378

Keywords

Content available
Book part
Publication date: 16 January 2024

Ayodeji E. Oke and Seyi S. Stephen

Abstract

Details

A Digital Path to Sustainable Infrastructure Management
Type: Book
ISBN: 978-1-83797-703-1

Open Access
Article
Publication date: 21 December 2021

Mirka Kans and Anders Ingwald

The purpose is to describe new business opportunities within the Swedish railway industry and to support the development of business models that corresponds with the needs and

1959

Abstract

Purpose

The purpose is to describe new business opportunities within the Swedish railway industry and to support the development of business models that corresponds with the needs and requirements of Industry 4.0, here denoted as Service Management 4.0.

Design/methodology/approach

The study is an in-depth and descriptive case study of the Swedish railway system with specific focus on a railway vehicle maintainer. Public reports, statistics, internal documents, interviews and dialogues forms the basis for the empirical findings.

Findings

The article describes the complex business environment of the deregulated Swedish railway industry. Main findings are in the form of identified business opportunities and new business model propositions for one of the key actors, a vehicle maintainer.

Originality/value

The article provides valuable understanding of business strategy development within complex business environments and how maintenance related business models could be developed for reaching Service Management 4.0.

Details

Journal of Quality in Maintenance Engineering, vol. 29 no. 5
Type: Research Article
ISSN: 1355-2511

Keywords

Open Access
Article
Publication date: 17 November 2023

Peiman Tavakoli, Ibrahim Yitmen, Habib Sadri and Afshin Taheri

The purpose of this study is to focus on structured data provision and asset information model maintenance and develop a data provenance model on a blockchain-based digital twin…

Abstract

Purpose

The purpose of this study is to focus on structured data provision and asset information model maintenance and develop a data provenance model on a blockchain-based digital twin smart and sustainable built environment (DT) for predictive asset management (PAM) in building facilities.

Design/methodology/approach

Qualitative research data were collected through a comprehensive scoping review of secondary sources. Additionally, primary data were gathered through interviews with industry specialists. The analysis of the data served as the basis for developing blockchain-based DT data provenance models and scenarios. A case study involving a conference room in an office building in Stockholm was conducted to assess the proposed data provenance model. The implementation utilized the Remix Ethereum platform and Sepolia testnet.

Findings

Based on the analysis of results, a data provenance model on blockchain-based DT which ensures the reliability and trustworthiness of data used in PAM processes was developed. This was achieved by providing a transparent and immutable record of data origin, ownership and lineage.

Practical implications

The proposed model enables decentralized applications (DApps) to publish real-time data obtained from dynamic operations and maintenance processes, enhancing the reliability and effectiveness of data for PAM.

Originality/value

The research presents a data provenance model on a blockchain-based DT, specifically tailored to PAM in building facilities. The proposed model enhances decision-making processes related to PAM by ensuring data reliability and trustworthiness and providing valuable insights for specialists and stakeholders interested in the application of blockchain technology in asset management and data provenance.

Details

Smart and Sustainable Built Environment, vol. 13 no. 1
Type: Research Article
ISSN: 2046-6099

Keywords

Open Access
Book part
Publication date: 1 May 2019

Agnes Lindell and Stefan Olander

Social sustainability is of increasing importance in societal development, which will affect the implementation of construction projects. The social responsibilities for both…

Abstract

Purpose

Social sustainability is of increasing importance in societal development, which will affect the implementation of construction projects. The social responsibilities for both construction clients and suppliers will be an increasingly relevant part of their business processes. The objective of this study is to evaluate how the procurement process functions today with respect to social considerations.

Design/Methodology/Approach

The empirical data is based on interviews with procurement officials for each studied contract, together with official guidelines concerning social considerations and tender documents for each studied contract. Furthermore, the interviews addressed the level of knowledge that exists with procurement officials concerning social considerations in the procurement of road and railroad projects.

Findings

The results showed that there was a positive attitude towards social considerations in the procurement process and that there is a need in the construction sector to consider social issues to a higher degree.

Research Limitations/Implications

This study is based on six road and five railroad contracts within the Swedish Transport Administration as the client organization.

Practical Implications

It was evident that the level of knowledge with individual procurement officials concerning social issues is relatively low and needs to be increased. There is a perception that the management social considerations in construction procurement need to be clarified.

Originality/Value

Further research is needed to develop procedures, guidelines, routines and strategies for social considerations in procurement. Another important issue for further research is the development of routines to follow up social terms of contract during the implementation of the project.

Details

10th Nordic Conference on Construction Economics and Organization
Type: Book
ISBN: 978-1-83867-051-1