1 – 10 of over 27000Sina Moradi and Kalle Kähkönen
The emergence of collaborative delivery models and working practices in construction industry has created a potential area for project success research. Previous studies have…
Abstract
Purpose
The emergence of collaborative delivery models and working practices in construction industry has created a potential area for project success research. Previous studies have addressed success factors of various collaborative delivery models (e.g. alliance and partnering). However, there is currently very limited research-based knowledge concerning core success factors for different collaborative delivery models, exploring the commonalities. Thus, this study aims to conceptualize a success model for collaborative construction projects by identifying and structuring their core success factors through the lens of project delivery elements.
Design/methodology/approach
A systematic literature review was conducted, and thematic as well as content analysis of the relevant studies led to the identification of mentioned success factors in the literature for different collaborative delivery models. Then, those common success factors were structured in a model based on factors' relation to project delivery elements.
Findings
The obtained results present eight core success factors (e.g. equality, mutual trust and commitment to win–win philosophy) for collaborative construction projects, structured in a model based on their contribution toward project organization, contractual relationships, and operational system in construction project delivery. Moreover, the differences between success factors for traditional and collaborative construction projects are discussed.
Originality/value
This study's findings provide insightful theoretical contributions on collaborative construction project success and providing a departure point for future studies based on the discussed differences between success factors of collaborative and traditional construction projects. The findings can be also practically insightful for the project professionals in collaborative construction projects to succeed in managing project organization, contractual relationships, and operational system.
Details
Keywords
Sina Moradi, Janne Hirvonen and Piia Sormunen
The energy performance gap (EPG) in building construction has been one of the major barriers to the realization of environmental and economic sustainability in the built…
Abstract
Purpose
The energy performance gap (EPG) in building construction has been one of the major barriers to the realization of environmental and economic sustainability in the built environment. Although there have been a few studies addressing this issue, studying this topic with a special focus on the project delivery process has been almost overlooked. Hence, this study aims to address the EPG in building construction through the lens of collaborative and life cycle-based project delivery.
Design/methodology/approach
In order to realize the objective of this study, the development of a theoretical framework based on the literature review was followed by a qualitative study in which 21 semi-structured interviews were conducted with Finnish project professionals representing clients, design/planning experts, constructors and building operation/maintenance experts to explore their views on the topic under study.
Findings
The findings reveal the project delivery-related causes of EPG in building construction. Moreover, the obtained results present a collaborative and life cycle-based delivery model that integrates project and product (i.e. building) life cycles, and it is compatible with all types of contractual frameworks in building construction projects.
Research limitations/implications
Although the findings of this study significantly contribute to theory and practice in the field of collaborative and sustainable construction project delivery, it is acknowledged that these findings are based on Finnish professionals’ input, and expanding this research to other regions is a potential area for further studies. Moreover, the developed model, although validated in Finland, needs to be tested in a broader context as well to gain wider generalizability.
Originality/value
The obtained results reveal the significance and impact of collaborative and life cycle-based project development and delivery on the realization of environmentally sustainable building construction.
Details
Keywords
Atle Engebø, Ole Jonny Klakegg, Jardar Lohne and Ola Lædre
To achieve the shift towards sustainable construction the industry must change the project delivery methods used. Therefore, this paper reports on a high-performance building…
Abstract
Purpose
To achieve the shift towards sustainable construction the industry must change the project delivery methods used. Therefore, this paper reports on a high-performance building project that implemented a collaborative project delivery method through the examination of the following research questions: RQ1: What were the most important contractual, cultural and organisational elements studied in the collaborative project delivery method? RQ2: What were the effects of the studied elements?
Design/methodology/approach
A longitudinal case study approach was adopted. As for means of data collection, a document review, semi-structured interviews, and observations was conducted. A total of 20 observations (App. 80 h, 175 pages of notes) and 12 interviews (App. 20 h, 100 pages of notes) with project participants was conducted.
Findings
The analysis indicates that if attention is paid to task, team and individual needs through contractual, cultural and organisational elements, this will affect the development of an integrated team.
Research limitations/implications
We demonstrate that the effects of the elements are shown through their achievement in creating and sustaining an integrated team of inter-organisational participants working in a collaborative environment.
Practical implications
It provides a better understanding of how a collaborative project delivery method for the design phase emphasises team integration. We demonstrate that while the principal sets the contractual boundaries by deciding the contractual elements, the agent should be intentional in the selection and use of organizational and cultural elements.
Originality/value
The paper suggests that it is not enough to just have contractual elements implemented. Consequently, this insight suggests that managers should be attentive to the untapped potential that lies within organisational and cultural elements.
Details
Keywords
Managing megaprojects is challenging due to their inherent complexity and uncertainty. Collaborative project delivery models have been introduced as an alternative to traditional…
Abstract
Purpose
Managing megaprojects is challenging due to their inherent complexity and uncertainty. Collaborative project delivery models have been introduced as an alternative to traditional project management in public infrastructure megaprojects and are often realized through collaborative contracts. These project organizations act as institutional arenas for logic interaction as actors with differing institutional backgrounds interact within the project. This paper aims to study the delivery phase of three megaprojects through an institutional lens, investigating the institutional interaction and alignment of logics therein.
Design/methodology/approach
A multiple case study was employed to reach deep insight into the phenomenon. Sixty-one interviews were conducted over 3 cases with representatives from all levels of the project hierarchy. Respondents were selected through snowball sampling. In two cases, observations of the shared project office were conducted. Data analysis built on first-order codes and second-order themes, collected into a theoretical framework.
Findings
The empirical evidence demonstrates the dynamics shaping institutional logics and gives evidence for changing logics in projects with a well-applied collaborative contract. However, there is a risk of resistance and a return to traditional logics since institutional change is slow and an unsuitably applied collaborative contract can lead to adherence to the conventional way of work.
Originality/value
Current research has focused on the regulatory framework and procurement phase of such models, but little attention has been given to the delivery phase and the interaction of conflicting logics. This paper can serve as an exemplar of the different logics found within public infrastructure projects and their interaction and alignment. Contributions include a heightened emphasis on the start of the project as a meeting point for differing institutional logics and the role change necessary when using a collaborative contract.
Details
Keywords
Edward Broughton, Zakari Saley, Maina Boucar, Dondi Alagane, Kathleen Hill, Aicha Marafa, Yaroh Asma and Karimou Sani
The purpose of this paper is to describe a quality improvement collaborative conducted in 33 Nigerian facilities to improve maternal and newborn care outcomes by increasing…
Abstract
Purpose
The purpose of this paper is to describe a quality improvement collaborative conducted in 33 Nigerian facilities to improve maternal and newborn care outcomes by increasing compliance with high‐impact, evidence‐based care standards. Intervention costs and cost‐effectiveness were examined and costs to the Niger Health Ministry (MoH) were estimated if they were to scale‐up the intervention to additional sites.
Design/methodology/approach
Facility‐based maternal care outcomes and costs from pre‐quality improvement collaborative baseline monitoring data in participating facilities from January to May 2006 were compared with outcomes and costs from the same facilities from June 2008 to September 2008. Cost data were collected from project accounting records. The MoH costs were determined from interviews with clinic managers and quality improvement teams. Effectiveness data were obtained from facilities' records.
Findings
The average delivery‐cost decreased from $35 before to $28 after the collaborative. The USAID/HCI project's incremental cost was $2.43/delivery. The collaborative incremental cost‐effectiveness was $147/disability‐adjusted life year averted. If the MoH spread the intervention to other facilities, substantive cost‐savings and improved health outcomes can be predicted.
Practical implications
The intervention achieved significant positive health benefits for a low cost. The Niger MoH can expect approximately 50 per cent return on its investment if it implements the collaborative in new facilities. The improvement collaborative approach can improve health and save health care resources.
Originality/value
This is one of the first studies known to examine collaborative quality improvement and economic efficiency in a developing country.
Details
Keywords
Eloise Grove, Andrew Dainty, Derek Thomson and Tony Thorpe
The intra-organisational relationships of through-life support services providers are complex, especially given the multifaceted nature of the provision required. For example…
Abstract
Purpose
The intra-organisational relationships of through-life support services providers are complex, especially given the multifaceted nature of the provision required. For example, capabilities within the UK highways maintenance arena must support engineering design, routine maintenance and the on-going management of the network. While collaboration in construction projects has formed a major research focus in recent years, there is a paucity of work examining collaboration in-flight.
Design/methodology/approach
Through a micro-practices approach, two contracts delivering highway infrastructure maintenance and renewal services are examined to explore the intra-organisational relationships that determine the quality of service delivered.
Findings
Despite the rhetoric of collaboration and integrated working that pervades the contemporary project discourse, there was a clear focus on addressing immediate technical and commercial concerns, rather than on creating the conditions for integrated working to flourish. On the occasions where the collaborative environment was prioritised, a more integrated service was delivered.
Originality/value
In contrast to other accounts of the ways collaborative working shapes performance, this research reveals an acute need for a sustained collaborative effort; as soon as “collaborative working” was normalised, the level of integration and seamlessness of service was diminished. This questions normative notions of what defines collaborative working in projects and suggests a need for re-framing it as an on-going accomplishment of actors involved. Such a perspective resonates with notions of “organizational becoming”, particularly in that attempts to foster collaboration are themselves constitutive of the unfolding and shifting nature of intra-organisational relationships that emerge in complex contractual arrangements.
Details
Keywords
Karen Manley and Le Chen
The purpose of this paper is to propose a new model to show how continuous joint learning of participant organisations improves project performance. Performance heterogeneity…
Abstract
Purpose
The purpose of this paper is to propose a new model to show how continuous joint learning of participant organisations improves project performance. Performance heterogeneity between collaborative infrastructure projects is typically examined by considering procurement systems and their governance mechanisms at static points in time. The literature neglects to consider the impact of dynamic learning capability, which is thought to reconfigure governance mechanisms over time in response to evolving market conditions.
Design/methodology/approach
There are two stages of conceptual development. In the first stage, the management literature is analysed to explain the standard model of dynamic learning capability that emphasises three learning phases for organisations. This standard model is extended to derive a novel circular model of dynamic learning capability that shows a new feedback loop between performance and learning. In the second stage, the construction management literature is consulted, adding project lifecycle, stakeholder diversity and three organisational levels to the analysis to arrive at the collaborative model of dynamic learning capability.
Findings
The collaborative model should enable construction organisations to successfully adapt and perform under changing market conditions. The complexity of learning cycles result in capabilities that are imperfectly imitable between organisations, explaining performance heterogeneity on projects.
Originality/value
The collaborative model provides a theoretically substantiated description of project performance, driven by the evolution of procurement systems and governance mechanisms. The model’s empirical value will be tested in future research.
Details
Keywords
Kari-Pekka Tampio, Harri Haapasalo and Jere Lehtinen
The research problem in this study is how a client (as a project owner) should organise early stakeholder involvement and integration in the front-end phase of a project. This…
Abstract
Purpose
The research problem in this study is how a client (as a project owner) should organise early stakeholder involvement and integration in the front-end phase of a project. This study aims to create normative managerial statements as propositions from the client's perspective and to combine them into a set of activities enabling efficient organisation in the front-end phase of a hospital construction project.
Design/methodology/approach
Action design research (ADR) was carried out in a large hospital construction project where the first author acted as an “involved researcher” and the other authors acted as “outside researchers”.
Findings
The authors created seven normative managerial propositions that were verified by the case project stakeholders and developed a managerial framework describing the client's essential stakeholder involvement and integration activities in the front-end phase of a hospital construction project based on these propositions. The authors have also depicted the subphases of the front-end phase: value definition phase in the client permanent organisation, value proposition phase in the client Programme Management Office (PMO) and finally development phase in the alliance organisation ending on the final investment decision.
Practical implications
The collaborative contract delivery model enables the early involvement and integration of stakeholders. It has been somewhat surprising to note the extent to which collaborative contracts change the client role in the project front-end. The results offer practical activities for how clients can manage front-end activities in collaborative contracts.
Originality/value
The case project offered a platform to analyse how the collaborative contract delivery model changes the emphasis of activities in the front-end of a project. One of the key benefits of collaborative contracts is that development, design and delivery occur partially in parallel, thereby enabling contributions from production to be included in the design and development. The benefit of having a real-life case under study provides the possibility to triangulate and analyse rich data, however limited by the qualitative case method.
Details
Keywords
Denise C. Tahara and Richard P. Green
This paper proposes an organizational change process to prepare physicians and other health professionals for their new roles in patient-centered medical homes (PCMHs). It…
Abstract
Purpose
This paper proposes an organizational change process to prepare physicians and other health professionals for their new roles in patient-centered medical homes (PCMHs). It provides physician-centered tools, models, concepts, and the language to implement transformational patient-centered medical care.
Design/methodology/approach
To improve care delivery, quality, and patient engagement, a systems approach to care is required. This paper examines a systems approach to patient care where all inputs that influence patient interactions and participation are considered in the design of health care delivery and follow-up treatment plans. Applying systems thinking, organizational change models, and team-building, we have examined the continuum of this change process from ideation through the diffusion of new methods and behaviors.
Findings
PCMHs make compelling business sense. Studies have shown that the PCMH improves patient satisfaction, clinical outcomes and reduces underuse and overuse of medical services. Patient-centered care necessitates transitioning from an adversarial to a collaborative culture. It is a transformation process predicated on strong leadership able to align an organization toward a vision of patient-centered care, creating a collaborative culture committed to health-goal achievement.
Originality/value
This paper proposes that the PCMH is a rigorous team-building transformational organizational change, a radical departure from the current hierarchical, silo-oriented, medical practice model. It requires that participants within and across health care organizations learn new skills and behaviors to achieve the anticipated quality and efficiency improvements. It is an innovative health care organization model of the future whose success is premised on teams supplanting the individual as the building block and unit of health care performance.
Details
Keywords
Deborah A. McNamara, Paul Rafferty and Fidelma Fitzpatrick
Interdisciplinary healthcare education and collaboration facilitates healthcare quality improvement (QI). Education challenges include cost, logistics and defining the optimum…
Abstract
Purpose
Interdisciplinary healthcare education and collaboration facilitates healthcare quality improvement (QI). Education challenges include cost, logistics and defining the optimum staff-engaging method. The purpose of this paper is to determine the optimum QI educational model and measure its impact using plan-do-study-act (PDSA) cycles.
Design/methodology/approach
The authors established an on-site interdisciplinary QI learning collaborative: weekly 30-minute learning sessions close to the working environment; a learning materials Twitter repository; and junior doctor-led QI work streams aligned with surgical directorate quality goals supported by a mentorship network. Delivery style (lectures, workshops and QI project reporting) and learning session content was planned weekly using PDSA cycles and modified using participant feedback (score 0-10). All surgical directorate QI work streams were measured before and at nine months.
Findings
From May 2014 to February 2015, there were 32 learning sessions with 266 scores (median 12 weekly, range 5-21). Workshop delivery scored the highest (mean score 9.0), followed by live project reports (mean score 8.8). The surgical QI work streams increased threefold from four to 12, including six junior doctor-led projects.
Practical implications
By proactively acting upon feedback, the authors centralised QI measurement and tailored learning sessions to staff needs. Building sustainability involves continually refining learning curriculum and QI work streams, and expanding the mentorship network.
Originality/value
The collaborative was established at no additional cost. Twitter is used to promote meetings, facilitate conversations and act as a learning repository. The mentorship framework builds QI and coaching expertise.