1 – 10 of over 6000Andrew Ebekozien, Clinton Aigbavboa, Mohamad Shaharudin Samsurijan, Mohamed Ahmed Hafez Ahmed, Opeoluwa Akinradewo and Igbebo Omoh-Paul
The construction industry is unique but with uncertainties. This is because of the operating environment. This intricacy gives rise to several construction risks and is compounded…
Abstract
Purpose
The construction industry is unique but with uncertainties. This is because of the operating environment. This intricacy gives rise to several construction risks and is compounded in developing countries’ turbulent times. If not managed, these risks enhanced in turbulent times could negatively impact the Nigerian construction projects’ cost, time, quality, and performance. Hence, this study investigated the perceived encumbrances facing construction risk management techniques and identified measures to promote sustainable-based construction risk management in turbulent times.
Design/methodology/approach
The researchers adopted a qualitative approach and achieved saturation with 28 participants. The participants were government policymakers, quantity surveyors in government ministries/agencies/departments, consultant engineers, consultant architects, consultant and contracting quantity surveyors, and construction contractors knowledgeable about construction risk management. The research employed a thematic analysis for the study’s data.
Findings
Findings identified turbulent times related to the industry and major techniques for managing construction project risks in the Nigerian construction industry. It revealed lax adoption and implementation of practices. Also, the study identified major encumbrances facing construction risk and proffered initiatives that would promote sustainable-based construction risk management in turbulent times.
Originality/value
This study investigates encumbrances and suggests measures to promote construction project risk management in turbulent times in Nigeria. Also, the study contributes to the literature’s paucity, uncovering perceived encumbrances and evolving organisations’ management styles to imbed sustainable-based risk management practices by qualitative research design method.
Details
Keywords
Mervi Hamalainen and Asta Salmi
The purpose of this paper is to investigate two current transformation processes in the construction industry: the adoption of a novel material, cross-laminated timber (CLT), and…
Abstract
Purpose
The purpose of this paper is to investigate two current transformation processes in the construction industry: the adoption of a novel material, cross-laminated timber (CLT), and the enhancement of digital transformation. This paper depicts the actors and interaction in the business network that is emerging around CLT construction and, in particular, how digital transformation (that is, the deployment of Construction 4.0 solutions) occurs in this business network.
Design/methodology/approach
Digital transformation is a relatively new phenomenon in CLT construction, and the authors, therefore, adopt a qualitative inductive research approach and rely on semi-structured interviews.
Findings
The findings of this paper suggest that it is critical for actors to adopt an interorganizational perspective in CLT construction, instead of only focusing on internal operations. An interorganizational perspective supports successful CLT construction, as well as the deployment of Construction 4.0 solutions. This will bring about the benefits of digital transformation in the construction industry.
Research limitations/implications
This paper investigates the network created around CLT construction in Finland but more generally illustrates the change toward Construction 4.0 solutions.
Practical implications
For managers, this paper explicates the importance of networking, instead of focusing on the internal development of the company, when adopting novel solutions emerging from both construction and information technology-related advancements.
Originality/value
Stability and traditions are characteristic of the construction industry. New technical solutions and materials, together with calls for sustainability, have challenged the traditional ways of constructing, and for example, the development of CLT construction has led to an emergence of new business networks. This material-related process and the ongoing digital transformation of business form an interesting context for an empirical-based analysis of changing interaction and networks. This paper gives the first insights into how digital transformation can benefit the evolution of the network.
Details
Keywords
The future construction site will be pervasive, context aware and embedded with intelligence. The purpose of this paper is to explore and define the concept of the digital skin of…
Abstract
Purpose
The future construction site will be pervasive, context aware and embedded with intelligence. The purpose of this paper is to explore and define the concept of the digital skin of the future smart construction site.
Design/methodology/approach
The paper provides a systematic and hierarchical classification of 114 articles from both industry and academia on the digital skin concept and evaluates them. The hierarchical classification is based on application areas relevant to construction, such as augmented reality, building information model-based visualisation, labour tracking, supply chain tracking, safety management, mobile equipment tracking and schedule and progress monitoring. Evaluations of the research papers were conducted based on three pillars: validation of technological feasibility, onsite application and user acceptance testing.
Findings
Technologies learned about in the literature review enabled the envisaging of the pervasive construction site of the future. The paper presents scenarios for the future context-aware construction site, including the construction worker, construction procurement management and future real-time safety management systems.
Originality/value
Based on the gaps identified by the review in the body of knowledge and on a broader analysis of technology diffusion, the paper highlights the research challenges to be overcome in the advent of digital skin. The paper recommends that researchers follow a coherent process for smart technology design, development and implementation in order to achieve this vision for the construction industry.
Details
Keywords
Sepehr Alizadehsalehi and Ibrahim Yitmen
The purpose of this research is to develop a generic framework of a digital twin (DT)-based automated construction progress monitoring through reality capture to extended reality…
Abstract
Purpose
The purpose of this research is to develop a generic framework of a digital twin (DT)-based automated construction progress monitoring through reality capture to extended reality (RC-to-XR).
Design/methodology/approach
IDEF0 data modeling method has been designed to establish an integration of reality capturing technologies by using BIM, DTs and XR for automated construction progress monitoring. Structural equation modeling (SEM) method has been used to test the proposed hypotheses and develop the skill model to examine the reliability, validity and contribution of the framework to understand the DRX model's effectiveness if implemented in real practice.
Findings
The research findings validate the positive impact and importance of utilizing technology integration in a logical framework such as DRX, which provides trustable, real-time, transparent and digital construction progress monitoring.
Practical implications
DRX system captures accurate, real-time and comprehensive data at construction stage, analyses data and information precisely and quickly, visualizes information and reports in a real scale environment, facilitates information flows and communication, learns from itself, historical data and accessible online data to predict future actions, provides semantic and digitalize construction information with analytical capabilities and optimizes decision-making process.
Originality/value
The research presents a framework of an automated construction progress monitoring system that integrates BIM, various reality capturing technologies, DT and XR technologies (VR, AR and MR), arraying the steps on how these technologies work collaboratively to create, capture, generate, analyze, manage and visualize construction progress data, information and reports.
Details
Keywords
Dongping Cao, Xuejiao Teng, Yanyu Chen, Dan Tan and Guangbin Wang
This study aims to explore how project-based firms, which generally organize most of their work around temporary projects in discontinuous and fragmented types of business…
Abstract
Purpose
This study aims to explore how project-based firms, which generally organize most of their work around temporary projects in discontinuous and fragmented types of business contexts, proactively formulate and implement digital transformation strategies under institutional pressures in a predigital era.
Design/methodology/approach
An exploratory case study was conducted in a large-scale construction company in China using multiple data collection methods, including semistructured interviews, documentation collection and observation.
Findings
An integrated framework is developed to conceptualize three key dimensions of digital transformation strategies of project-based firms: strategic adaptation for organization-environment fit through balancing the internal efficiency needs with the external legitimacy pressures; proactive business transformation through comprehensively managing the roles of digital technologies in optimizing defined business processes and fostering new business models; and delicate organizational transformation to integrate temporary project-level operation processes with ongoing firm-level business processes.
Originality/value
This study represents an exploratory effort to empirically investigate how project-based firms strategically organize complex digital transformation imperatives in their discontinuous and fragmented business contexts. The findings contribute to deepened understandings of how complex organizational and environmental contexts can be comprehensively managed for systemic business and organizational transformations to leverage the value of emerging digital technologies for project-based organizations.
Details
Keywords
Duncan Maxwell and Rachel Couper
Construction suffers from “peculiarities” that concern the temporary natures of the construction site, project teams and unique product design. Considering the digital…
Abstract
Purpose
Construction suffers from “peculiarities” that concern the temporary natures of the construction site, project teams and unique product design. Considering the digital transformation of construction, new solutions are being investigated that can provide consistent data between changing projects. One such source of data manifests in the tracking of logistics activities across the supply chain. Construction logistics is traditionally considered a site management activity focused solely on the “back end” of projects, but an expanded logistics focus can unlock new avenues of improvement. This study aims to understand the requirements and benefits of such a consistent thread of data.
Design/methodology/approach
From a research project with one of Australia’s largest contracting companies, this paper details a series of construction tracking tests as an empirical case study in using Bluetooth low energy aware tracking technology to capture data across the manufacture, delivery and assembly of a cross-laminated timber structural prototyping project.
Findings
The findings affirm the tracking of expanded logistics data can improve back-end performance in subsequent projects while also demonstrating the opportunity to inform a project’s unique front-end design phase. The case study demonstrates that as the reliability, range and battery life of tracking technologies improve, their incorporation into a broader range of construction activities provides invaluable data for improvement across projects.
Originality/value
As a live case study, this research offers unique insights into the potential of construction tracking to close the data loop from final site assembly back to the early project design phase, thus driving continual improvement from a holistic perspective.
Nathaniel Ayinde Olatunde, Angel M. Gento, Victor N. Okorie, Olumide W. Oyewo, Modupe Cecilia Mewomo and Imoleayo Abraham Awodele
Construction 4.0 technology is a novel innovative technology that has been proved to enhance project performance. However, information on the concept's awareness, adoption…
Abstract
Purpose
Construction 4.0 technology is a novel innovative technology that has been proved to enhance project performance. However, information on the concept's awareness, adoption readiness and challenges in developing economies is still scanty. The purpose of the study is to appraise awareness, adoption readiness and challenges of Construction 4.0 technologies in Nigeria to bring to the fore the state of art of these innovative technologies in the study area.
Design/methodology/approach
The study used a convenient sampling technique to select 129 construction professionals (architects, engineers and quantity surveyors) in Osun State, Nigeria, who provided data for the study through a closed-ended structure questionnaire survey. The quantitative data supplied were analysed using frequency, percentile, Cronbach's alpha, mean score (MS) analysis and analysis of variance (ANOVA).
Findings
The overall awareness level of construction professionals in the study area about Construction 4.0 technologies is at a moderate level (MS = 3.03). The analysis of each component of the Construction 4.0 technologies shows that BIM (MS = 3.69) has the highest level of awareness, while augmented reality (MS = 2.51) has the least awareness level. More results show a significant difference in the opinion of the respondents, a significant difference in the respondents on 36% of the components of Construction 4.0 technologies. The adoption readiness of the Nigerian construction industry (NCI) to Construction 4.0 technologies is at an initial level (MS = 2.86). However, the 3D printing (MS = 3.36) and augmented reality (MS = 2.49) have the highest and lowest adoption readiness ratings, respectively. There is no significant difference in how respondents ranked the NCI adoption readiness on 73% of the components of Construction 4.0 technologies. The main challenges of Construction 4.0 technologies in the study area are lack of standardisation (MS = 4.02), lack of investment in research and development and cost of implementation (MS = 3.87) each. The result shows that there is perfect unanimity in the way respondents ranked the challenges of Construction 4.0.
Practical implications
The study provided information on the status quo of Construction 4.0 technologies in the NCI to enhance improvement in practice and the attendant project delivery.
Originality/value
The study attempted to bring to the fore the state of the art on awareness, adoption readiness and challenges of Construction 4.0 technologies in Nigeria. The study's information will be valuable to improve project delivery.
Details
Keywords
Douglas Aghimien, Matthew Ikuabe, Lerato Millicent Aghimien, Clinton Aigbavboa, Ntebo Ngcobo and Jonas Yankah
The importance of robotics and automation (R&A) in delivering a safe built environment cannot be overemphasised. This is because R&A systems can execute a hazardous job function…
Abstract
Purpose
The importance of robotics and automation (R&A) in delivering a safe built environment cannot be overemphasised. This is because R&A systems can execute a hazardous job function that the construction workforce may not execute. Based on this knowledge, this study aims to present the result of an assessment of the impediments to the deployment of R&A for a safe and healthy construction environment.
Design/methodology/approach
This study adopted a post-positivist philosophical stance, using a quantitative research approach and a questionnaire administered to construction professionals in South Africa. The data gathered were analysed using frequency, percentage, mean item score, Kruskal–Wallis H-test, exploratory factor analysis and partial least square structural equation modelling (SEM).
Findings
This study revealed that the impediments to the deployment of R&A could be grouped into: industry, technology, human and cost-related factors. However, SEM assessment showed that only the industry, human and cost-related factors would significantly impact attaining specific health and safety-related outcomes.
Practical implications
The findings offer valuable benefits to construction organisations as the careful understanding of the identified impeding factors can help lead to better deployment of R&A and the attainment of its inherent safety benefits.
Originality/value
This study attempts to fill the gap in the shortage of literature exploring the deployment of R&A for a safe construction environment, particularly in developing countries like South Africa, where such studies are non-existent. This paper, therefore, offers a theoretical backdrop for future works on R&A deployment, particularly in developing countries where such a study has not been explored.