1 – 10 of over 1000Abdul-Manan Sadick, Argaw Gurmu and Chathuri Gunarathna
Developing a reliable cost estimate at the early stage of construction projects is challenging due to inadequate project information. Most of the information during this stage is…
Abstract
Purpose
Developing a reliable cost estimate at the early stage of construction projects is challenging due to inadequate project information. Most of the information during this stage is qualitative, posing additional challenges to achieving accurate cost estimates. Additionally, there is a lack of tools that use qualitative project information and forecast the budgets required for project completion. This research, therefore, aims to develop a model for setting project budgets (excluding land) during the pre-conceptual stage of residential buildings, where project information is mainly qualitative.
Design/methodology/approach
Due to the qualitative nature of project information at the pre-conception stage, a natural language processing model, DistilBERT (Distilled Bidirectional Encoder Representations from Transformers), was trained to predict the cost range of residential buildings at the pre-conception stage. The training and evaluation data included 63,899 building permit activity records (2021–2022) from the Victorian State Building Authority, Australia. The input data comprised the project description of each record, which included project location and basic material types (floor, frame, roofing, and external wall).
Findings
This research designed a novel tool for predicting the project budget based on preliminary project information. The model achieved 79% accuracy in classifying residential buildings into three cost_classes ($100,000-$300,000, $300,000-$500,000, $500,000-$1,200,000) and F1-scores of 0.85, 0.73, and 0.74, respectively. Additionally, the results show that the model learnt the contextual relationship between qualitative data like project location and cost.
Research limitations/implications
The current model was developed using data from Victoria state in Australia; hence, it would not return relevant outcomes for other contexts. However, future studies can adopt the methods to develop similar models for their context.
Originality/value
This research is the first to leverage a deep learning model, DistilBERT, for cost estimation at the pre-conception stage using basic project information like location and material types. Therefore, the model would contribute to overcoming data limitations for cost estimation at the pre-conception stage. Residential building stakeholders, like clients, designers, and estimators, can use the model to forecast the project budget at the pre-conception stage to facilitate decision-making.
Details
Keywords
Lars Stehn and Alexander Jimenez
The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels…
Abstract
Purpose
The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels. The take is that fragmentation of construction is one explanation for the lack of productivity growth, and that IHB could be an integrating method of overcoming horizontal and vertical fragmentation.
Design/methodology/approach
Singe-factor productivity measures are calculated based on data reported by IHB companies and compared to official produced and published research data. The survey covers the years 2013–2020 for IHB companies building multi-storey houses in timber. Generalization is sought through descriptive statistics by contrasting the data samples to the used means to control vertical and horizontal fragmentation formulated as three theoretical propositions.
Findings
According to the results, IHB in timber is on average more productive than conventional housebuilding at the company level, project level, in absolute and in growth terms over the eight-year period. On the company level, the labour productivity was on average 10% higher for IHB compared to general construction and positioned between general construction and general manufacturing. On the project level, IHB displayed an average cost productivity growth of 19% for an employed prefabrication degree of about 45%.
Originality/value
Empirical evidence is presented quantifying so far perceived advantages of IHB. By providing analysis of actual cost and project data derived from IHB companies, the article quantifies previous research that IHB is not only about prefabrication. The observed positive productivity growth in relation to the employed prefabrication degree indicates that off-site production is not a sufficient mean for reaching high productivity and productivity growth. Instead, the capabilities to integrate the operative logic of conventional housebuilding together with logic of IHB platform development and use is a probable explanation of the observed positive productivity growth.
Details
Keywords
Innocent Chigozie Osuizugbo, Kevin Chuks Okolie and Olalekan Shamsideen Oshodi
Improving buildability of building designs with the aid of buildability assessment is essential because of the effect of designs on construction. Despite the plethora of research…
Abstract
Purpose
Improving buildability of building designs with the aid of buildability assessment is essential because of the effect of designs on construction. Despite the plethora of research into buildability reported over the years, a review of the literature shown a dearth of research into the factors supporting the implementation of buildability assessment. Because buildability assessment has been confirmed to be highly beneficial to construction business, this study aims to investigate the factors supporting the implementation of buildability assessment as a tool for buildability improvement using Nigeria as a representative case.
Design/methodology/approach
Survey research method was adopted for the study. Questionnaires were administered to a purposively selected group of architects, engineers, builders and quantity surveyors involved in construction project delivery within client, consulting and contracting organisations in Nigeria. A total of 368 questionnaires were distributed among the sampled participants, out of which, a total of 219 representing 60% were sufficiently filled and returned. Data collected were analysed using inferential and descriptive statistics.
Findings
The results revealed owner’s commitment, clients’ awareness of the benefits of conducting buildability assessment on building design, unity amongst different professionals in the construction industry, designers consider buildability important, adequate coordination amongst different design disciplines, adequate channel for co-ordination and communication between designers and constructors at the design stage and adequate support from the government as the top most seven factors supporting buildability assessment implementation in construction sector of Nigeria. Secondly, the results from the research revealed that there is no statistically significant difference in factors supporting buildability assessment implementation in construction between clients and consulting and contracting construction organisations in Nigeria.
Originality/value
The findings provide in-depth insight of the factors supporting the implementation of buildability assessment in construction that can help principal stakeholders in construction to facilitate development of strategies required in supporting the adoption and implementation of buildability assessment tool for buildability improvement.
Details
Keywords
Ephraim Zulu, Sambo Lyson Zulu, Mwansa Chabala, Neema Kavishe, Charles Chifunda and Innocent Musonda
While previous studies have highlighted the importance of incorporating environmental sustainability in building designs, there is a paucity of studies that assess the extent to…
Abstract
Purpose
While previous studies have highlighted the importance of incorporating environmental sustainability in building designs, there is a paucity of studies that assess the extent to which design teams in developing countries consider environmental sustainability at the building design stage. Therefore, using Zambia as a case study, this study examined the extent to which infrastructure design teams in a developing country consider environmental sustainability at the design stage.
Design/methodology/approach
The study used a qualitative research approach using structured interviews because there are hardly any studies which have explored the extent to which designers incorporate environmental sustainability in infrastructure designs in developing countries. The data is analysed thematically using the ATLAS.ti software.
Findings
The results show that environmental sustainability is not an important design consideration because it is secondary to functional, technical and aesthetic considerations. Environmental considerations are also made in an ad hoc manner and when it is cost-effective for the project. Regulatory requirements pertaining to environmental protection are adhered to without any cost considerations. It was, therefore, theorised that building design teams in developing countries make technical, functional and aesthetic consideration during the infrastructure design stage ahead of environmental considerations.
Originality/value
There is a paucity of studies that have investigated whether building infrastructure designers consider issues of environmental sustainability at the design stage in developing countries. The findings have practical implications on how developing countries can foster environmental sustainability at the design stage and avoid generating a building infrastructure stock that will require environmental resilience adaptation in the future.
Details
Keywords
The construction industry has considerably evolved in the recent two decades due to the emergence of sustainability, lean construction (LC) and building information modelling…
Abstract
Purpose
The construction industry has considerably evolved in the recent two decades due to the emergence of sustainability, lean construction (LC) and building information modelling (BIM). Despite previous research efforts, there is still a gap concerning the multidimensional nature of their integration. Hence, this study aims to fill the mentioned knowledge gap through exploring and comparing the challenges, enablers, techniques as well as benefits of integrating LC with BIM and sustainability in building construction projects.
Design/methodology/approach
A systematic literature review was conducted to fulfill the purpose of this study.
Findings
The findings reveal and compare the challenges, enablers, techniques and benefits of integrating LC with BIM and sustainability in building construction projects. The results suggest that there are eight common challenges for integrating LC with BIM and sustainability, including high initial cost, lack of collaboration, lack of professionals and lack of compatible contractual framework. The discovered challenges, enablers, techniques and benefits seem to be mostly routed in people. The findings also suggest that the synergistic benefits of integrating LC with BIM and sustainability can overcome the common challenges (safety, reliability, productivity, collaboration and quality) in construction projects.
Originality/value
The findings contribute to the literature and practice concerning the integration of LC with BIM and sustainability by exploring, comparing and discussing the relevant challenges, enablers, techniques as well as benefits. Moreover, the findings reveal the significance of the development of people in construction industry, besides processes and technology, as people are always subject of activities in construction while processes and technology are always objects.
Details
Keywords
Olabode Emmanuel Ogunmakinde, Temitope Egbelakin, Willy Sher, Temitope Omotayo and Mercy Ogunnusi
Establishing a more sustainable built environment is an increasing global concern for the construction industry. Despite the intrinsic and extrinsic obstacles the stakeholders…
Abstract
Purpose
Establishing a more sustainable built environment is an increasing global concern for the construction industry. Despite the intrinsic and extrinsic obstacles the stakeholders face, huge efforts are required to transition to a smooth, sustainable construction (SC) practice. This study identifies and discusses cogent obstacles to SC in developing nations.
Design/methodology/approach
The Preferred Reporting Item for systematic reviews and Meta-Analysis (PRISMA) approach was employed to establish research work in SC for developing countries. The databases used were Scopus and Web of Science. Meta-analysis of keywords was analysed thematically. The initial broad search returned 8,420 publications which were filtered and reviewed in-depth to fit the aim of the study, produced only 21 relevant publications from the years 2000–2021.
Findings
The four identified themes of obstacles to SC in developing countries are as follows: construction professional training and education, clients' attitudes and awareness, construction industries' culture and capacity and governments' regulation, policies and economy. The key barriers identified from the meta-analysis include inadequate training and education amongst construction professionals, poor execution of sustainability ethics, poor populace attitude towards sustainability, poor awareness and understanding, dearth of precise data and integrated study and inappropriate priorities about sustainability.
Originality/value
The originality in this study are themes drawn from millennium development goals (MDGs) and sustainable development goals (SDGs) publications related to SC. Consequently, the final framework presented a holistic approach to surmounting the established limitations and aided recommendations for future studies. Thus, setting a background for developing strategies to overcome the limitations and further attain sustainable development (SD).
Details
Keywords
This paper aims to explore the process of implementing solar photovoltaic (PV) systems in construction to contribute to the understanding of systemic innovation in construction.
Abstract
Purpose
This paper aims to explore the process of implementing solar photovoltaic (PV) systems in construction to contribute to the understanding of systemic innovation in construction.
Design/methodology/approach
The exploratory research presented is based on qualitative data collected in workshops and interviews with 76 construction- and solar-industry actors experienced in solar PV projects. Actor-specific barriers were identified and analysed using an abductive approach.
Findings
In light of established definitions of systemic innovation, the process of implementing solar PV systems in construction involves challenges regarding technical and material issues, competencies, and informal and formal institutions. The specificities of this case highlight the necessity of paying attention to details in the process and to develop knowledge of systemic innovation in construction since the industry’s involvement in addressing societal challenges related to the energy transition will require implementing such innovations much more in the future.
Practical implications
New knowledge of solar PV systems as an innovation in professional construction is collected, enabling the adaptation of management strategies for its implementation. This knowledge can also be applied generally to other challenges encountered in highly systemic innovation implementation. Solar industry actors can gain an understanding of solar-specific challenges for the construction industry, challenges for which they must adapt their activities.
Originality/value
The exploration of actor-specific experiences of solar PV projects has resulted in a novel understanding of this specific innovation and its implementation. The findings illustrate a case of a high level of systemic innovation and the need to use a finer-grained scale for classification when studying innovation in construction.
Details
Keywords
Iddamalgoda Pathiranage Tharindu Sandaruwan, Jayasinghe Arachchige Bihara Janardana and Kesavan Manoharan
Construction professionals are the major contributors to developing a sustainable construction industry, whereas architects, engineers and quantity surveyors are the key…
Abstract
Purpose
Construction professionals are the major contributors to developing a sustainable construction industry, whereas architects, engineers and quantity surveyors are the key construction professionals who must play extraordinary roles in achieving better sustainable construction. Therefore, this study aims to identify the job attributes of key Sri Lankan construction professionals in addressing challenges associated with climate change.
Design/methodology/approach
The study adopted a mixed research approach. A literature review and preliminary semi-structured interviews were used to appraise the job roles of architects, engineers and quantity surveyors in addressing challenges associated with climate change. The data collected through the qualitative approach were used in an online questionnaire survey, and the findings were analysed using the relative index method.
Findings
The findings highlight that regardless of the knowledge of the professional category on green rating tools, carbon footprint, adaptation of renewable energies for the reduction of energy consumption, building information modelling-related applications and waste management concepts/practices are the foremost job attributes required for the key Sri Lankan construction professionals in addressing challenges associated with climate change.
Research limitations/implications
The results from this study provide a handful of guidance to construction industry professionals, national and international professional institutions, non-governmental organisations and other relevant authorities to address climate change within the built environment by identifying ways for improving the relevant key job attributes of construction industry professionals.
Originality/value
To the best of the authors’ knowledge, this is the first study that explores the job attributes of key Sri Lankan construction professionals in addressing the challenges associated with climate change.
Details
Keywords
Sulakshya Gaur and Abhay Tawalare
Design cost overrun is one of the prominent factor that can impact the sustainable delivery of the project. It can be encountered due to a lack of information flow, design…
Abstract
Purpose
Design cost overrun is one of the prominent factor that can impact the sustainable delivery of the project. It can be encountered due to a lack of information flow, design variation, etc. thereby impacting the project budget, waste generation and schedule. An overarching impact of this is witnessed in the sustainability dimensions of the project, mainly in terms of economic and environmental aspects. This work, therefore, aims to assess the implications of a technological process, in the form of building information modelling (BIM), that can smoothen the design process and mitigate the risks, thus impacting the sustainability of the project holistically.
Design/methodology/approach
The identified design risks in construction projects from the literature were initially analysed using a fuzzy inference system (FIS). This was followed by the focus group discussion with the project experts to understand the role of BIM in mitigating the project risks and, in turn, fulfilling the sustainability dimensions.
Findings
The FIS-based risk assessment found seven risks under the intolerable category for which the BIM functionalities associated with the common data environment (CDE), data storage and exchange and improved project visualization were studied as mitigation approaches. The obtained benefits were then subsequently corroborated with the achievement of three sustainability dimensions.
Research limitations/implications
The conducted study strengthens the argument for the adoption of technological tools in the construction industry as they can serve multifaceted advantages. This has been shown through the use of BIM in risk mitigation, which inherently impacts project sustainability holistically.
Originality/value
The impact of BIM on all three dimensions of sustainability, i.e. social, economic and environmental, through its use in the mitigation of critical risks was one of the important findings. It presented a different picture as opposed to other studies that have mainly been dominated by the use of BIM to achieve environmental sustainability.
Details
Keywords
Andrew Ebekozien, Clinton Ohis Aigbavboa and Mohamad Shaharudin Samsurijan
Though alternative building technologies (ABTs) have been encouraged to address accessible and affordable issues in low-cost housing (LCH) provision, their adoption is still…
Abstract
Purpose
Though alternative building technologies (ABTs) have been encouraged to address accessible and affordable issues in low-cost housing (LCH) provision, their adoption is still overwhelmed with encumbrances. The encumbrances that hinder ABT adoption require an in-depth study, especially in developing countries like Nigeria. However, studies regarding ABT and its role in improving Nigeria's LCH to achieve Sustainable Development Goal (SDG) 11 are scarce. This research investigates encumbrances to ABT adoption in Nigeria's LCH provision and suggests feasible measures to prevent or reduce the encumbrances, thereby improving achieving SDG 11 (sustainable cities and communities).
Design/methodology/approach
This research utilised qualitative research and adopted a face-to-face interview as the primary data collection. The interviewees comprised ABT practitioners and end users in Nigeria who were chosen by a convenient sampling technique. The study's data were analysed manually through a thematic approach.
Findings
This study shows that stakeholders should embrace ABT in LCH provision to improve achieving SDG 11 in Nigeria. Also, it clustered the perceived 20 encumbrances to ABT adoption in LCH provision into government/policymaker, housing developers/building contractors, ABT users and ABT manufacturers-related issues in Nigeria's context. This study suggested mechanisms to mitigate encumbrances to ABT adoption in LCH provision, thereby improving achieving SDG 11.
Originality/value
This research adds to the limited literature by analysing ABT adoption encumbrances in Nigeria's LCH provision, which could assist policy formulation for the uptake of ABT in LCH provision and improve achieving Goal 11.