Search results

1 – 10 of 19
Article
Publication date: 30 April 2024

Lifeng Wang, Yi Zhang, Ziwang Xiao and Long Liu

Effectively solving the large tonnage cable in the construction process due to the tensioning method of the inclined cable often appears in the overall cable force and the design…

Abstract

Purpose

Effectively solving the large tonnage cable in the construction process due to the tensioning method of the inclined cable often appears in the overall cable force and the design value of the deviation is large, cable internal strand force is not uniform, the main girder stress exceeds the limit of the problem affecting the safety of the structure.

Design/methodology/approach

In this study, the finite element method and theoretical analysis method are utilized to propose a construction control method of tensioning the whole bunch of diagonal cables in two parts according to the deformation coordination relationship between the main girder and the diagonal cables. This methodology was implemented during the actual construction of the PAIRA Bridge in Bangladesh.

Findings

Tests conducted on cable-stayed bridges using this controlled tensioning method demonstrate that the measured cable strength of a single strand exhibits an error of less than 0.15% compared to the design target cable strength. The deviation between the measured and designed cable forces ranges from 0.16% to 0.27%. Furthermore, no tensile stress is observed in both the top plate and bottom plate of the root section of the main girder, indicating a state of full-section compression throughout the entire construction process.

Originality/value

Through the comparison with the test value, it can be proved that the whole bunch of diagonal cable tensioned in two parts of the construction control method proposed in this paper can make the internal strand force more uniform, to meet the precision requirements of the site construction, to protect the safety of the bridge construction process. The method proposed in this paper is highly accurate, easy to calculate, and has a high value of popularization and application.

Details

International Journal of Structural Integrity, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1757-9864

Keywords

Article
Publication date: 26 April 2024

Xinmin Zhang, Jiqing Luo, Zhenhua Dong and Linsong Jiang

The long-span continuous rigid-frame bridges are commonly constructed by the section-by-section symmetrical balance suspension casting method. The deflection of these bridges is…

Abstract

Purpose

The long-span continuous rigid-frame bridges are commonly constructed by the section-by-section symmetrical balance suspension casting method. The deflection of these bridges is increasing over time. Wet joints are a typical construction feature of continuous rigid-frame bridges and will affect their integrity. To investigate the sensitivity of shear surface quality on the mechanical properties of long-span prestressed continuous rigid-frame bridges, a large serviced bridge is selected for analysis.

Design/methodology/approach

Its shear surface is examined and classified using the damage measuring method, and four levels are determined statistically based on the core sample integrity, cracking length and cracking depth. Based on the shear-friction theory of the shear surface, a 3D solid element-based finite element model of the selected bridge is established, taking into account factors such as damage location, damage number and damage of the shear surface. The simulated results on the stress distribution of the local segment, the shear surface opening and the beam deflection are extracted and analyzed.

Findings

The findings indicate that the main factors affecting the ultimate shear stress and shear strength of the shear surface are size, shear reinforcements, normal stress and friction performance of the shear surface. The connection strength of a single or a few shear surfaces decreases but with little effect on the local stress. Cracking and opening mainly occur at the 1/4 span. Compared with the rigid “Tie” connection, the mid-span deflection of the main span increases by 25.03% and the relative deflection of the section near the shear surface increases by 99.89%. However, when there are penetrating cracks and openings in the shear surface at the 1/2 span, compared with the 1/4 span position, the mid-span deflection of the main span and the relative deflection of the cross-section increase by 4.50%. The deflection of the main span increases with the failure of the shear surface.

Originality/value

These conclusions can guide the analysis of deflection development in long-span prestressed continuous rigid-frame bridges.

Details

International Journal of Structural Integrity, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1757-9864

Keywords

Open Access
Article
Publication date: 23 November 2023

Xiaochen Ju

This research addresses the diverse characteristics of existing railway steel bridges in China, including variations in construction age, design standards, structural types…

Abstract

Purpose

This research addresses the diverse characteristics of existing railway steel bridges in China, including variations in construction age, design standards, structural types, manufacturing processes, materials and service conditions. It also focuses on prominent defects and challenges related to heavy transportation conditions, particularly low live haul reserves and severe fatigue problems.

Design/methodology/approach

The study encompasses three key aspects: (1) Adaptability assessment: It begins with assessing the suitability of existing railway steel bridges for heavy-haul operations through comprehensive analyses, experiments and engineering applications. (2) Strengthening: To combat frequent crack defects in the vertical stiffener end structure of girder webs, fatigue performance tests and reinforcement scheme experiments were conducted. These experiments included the development of a hot-spot stress S-N curve for this structure, validating the effectiveness of methods like crack stop holes, ultrasonic hammering and flange angle steel. (3) Service life extension: Research on the cruciform welded joint structure (non-fusion transfer type) focused on fatigue performance over the long life cycle. This led to the establishment of a fatigue S-N curve, enhancing Chinese design codes.

Findings

The research achieved several significant outcomes: (1) Successful implementation of strengthening and retrofitting measures on a 64-m single-span double-track railway steel truss girder on an existing heavy-duty line. (2) Post-reinforcement, a substantial 26% to 32% reduction in live haul stress on bridge members was achieved. (3) The strengthening and retrofitting efforts met design expectations, enabling the bridge to accommodate vehicles with a 30-ton axle haul on the railway line.

Originality/value

This research systematically tackles challenges and defects associated with Chinese existing railway steel bridges, providing valuable insights into adaptability assessment, strengthening techniques and service life extension methods. Furthermore, the development of fatigue S-N curves and the successful implementation of bridge enhancements have practical implications for improving the resilience and operational capacity of railway steel bridges in China.

Details

Railway Sciences, vol. 2 no. 4
Type: Research Article
ISSN: 2755-0907

Keywords

Article
Publication date: 16 April 2024

Shuyuan Xu, Jun Wang, Xiangyu Wang, Wenchi Shou and Tuan Ngo

This paper covers the development of a novel defect model for concrete highway bridges. The proposed defect model is intended to facilitate the identification of bridge’s…

Abstract

Purpose

This paper covers the development of a novel defect model for concrete highway bridges. The proposed defect model is intended to facilitate the identification of bridge’s condition information (i.e. defects), improve the efficiency and accuracy of bridge inspections by supporting practitioners and even machines with digitalised expert knowledge, and ultimately automate the process.

Design/methodology/approach

The research design consists of three major phases so as to (1) categorise common defect with regard to physical entities (i.e. bridge element), (2) establish internal relationships among those defects and (3) relate defects to their properties and potential causes. A mixed-method research approach, which includes a comprehensive literature review, focus groups and case studies, was employed to develop and validate the proposed defect model.

Findings

The data collected through the literature and focus groups were analysed and knowledge were extracted to form the novel defect model. The defect model was then validated and further calibrated through case study. Inspection reports of nearly 300 bridges in China were collected and analysed. The study uncovered the relationships between defects and a variety of inspection-related elements and represented in the form of an accessible, digitalised and user-friendly knowledge model.

Originality/value

The contribution of this paper is the development of a defect model that can assist inexperienced practitioners and even machines in the near future to conduct inspection tasks. For one, the proposed defect model can standardise the data collection process of bridge inspection, including the identification of defects and documentation of their vital properties, paving the path for the automation in subsequent stages (e.g. condition evaluation). For another, by retrieving rich experience and expert knowledge which have long been reserved and inherited in the industrial sector, the inspection efficiency and accuracy can be considerably improved.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 June 2022

Fatimah De'nan, Nor Salwani Hashim and Xing Yong Sua

With the vast advancement of structural steel properties over the recent decades, structural steel has become the dominate material for the construction of bridges, stadiums…

Abstract

Purpose

With the vast advancement of structural steel properties over the recent decades, structural steel has become the dominate material for the construction of bridges, stadiums, factories and high rise buildings. This paper aims to present the study of structural behaviour and efficiency of tapered steel section with elliptical perforation under shear loading conditions.

Design/methodology/approach

The effect of various elliptical perforation configurations such as tapering ratio, perforation size, perforation orientation and perforation layout on the shear behaviour of tapered steel section has been investigated by using finite element method. A total of 112 models are simulated via LUSAS software.

Findings

It has been found that the most efficient model is the tapered steel section with tapering ratio of 0.3 and vertical elliptical perforation of 0.2 times the section depths which are arranged in Layout 3. The most efficient model has a shear efficiency of 1,094.35 kN, which is 4.12% less than the tapered steel section without perforation, but it could achieve a 0.32% of weight reduction.

Originality/value

The smaller tapering ratio and perforation size contributed to the higher shear buckling capacity and efficiency for the elliptical perforated tapered steel section.

Details

World Journal of Engineering, vol. 20 no. 6
Type: Research Article
ISSN: 1708-5284

Keywords

Article
Publication date: 12 December 2023

Niveen Badra, Hosam Hegazy, Mohamed Mousa, Jiansong Zhang, Sharifah Akmam Syed Zakaria, Said Aboul Haggag and Ibrahim Abdul-Rashied

This research aims to create a methodology that integrates optimization techniques into preliminary cost estimates and predicts the impacts of design alternatives of steel…

Abstract

Purpose

This research aims to create a methodology that integrates optimization techniques into preliminary cost estimates and predicts the impacts of design alternatives of steel pedestrian bridges (SPBs). The cost estimation process uses two main parameters, but the main goal is to create a cost estimation model.

Design/methodology/approach

This study explores a flexible model design that uses computing capabilities for decision-making. Using cost optimization techniques, the model can select an optimal pedestrian bridge system based on multiple criteria that may change independently. This research focuses on four types of SPB systems prevalent in Egypt and worldwide. The study also suggests developing a computerized cost and weight optimization model that enables decision-makers to select the optimal system for SPBs in keeping up with the criteria established for that system.

Findings

In this paper, the authors developed an optimization model for cost estimates of SPBs. The model considers two main parameters: weight and cost. The main contribution of this study based on a parametric study is to propose an approach that enables structural engineers and designers to select the optimum system for SPBs.

Practical implications

The implications of this research from a practical perspective are that the study outlines a feasible approach to develop a computerized model that utilizes the capabilities of computing for quick cost optimization that enables decision-makers to select the optimal system for four common SPBs based on multiple criteria that may change independently and in concert with cost optimization during the preliminary design stage.

Social implications

The model can choose an optimal system for SPBs based on multiple criteria that may change independently and in concert with cost optimization. The resulting optimization model can forecast the optimum cost of the SPBs for different structural spans and road spans based on local unit costs of materials cost of steel structures, fabrication, erection and painting works.

Originality/value

The authors developed a computerized model that uses spreadsheet software's capabilities for cost optimization, enabling decision-makers to select the optimal system for SPBs meeting the criteria established for such a system. Based on structural characteristics and material unit costs, this study shows that using the optimization model for estimating the total direct cost of SPB systems, the project cost can be accurately predicted based on the conceptual design status, and positive prediction outcomes are achieved.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 16 April 2024

Chaofan Wang, Yanmin Jia and Xue Zhao

Prefabricated columns connected by grouted sleeves are increasingly used in practical projects. However, seismic fragility analyses of such structures are rarely conducted…

Abstract

Purpose

Prefabricated columns connected by grouted sleeves are increasingly used in practical projects. However, seismic fragility analyses of such structures are rarely conducted. Seismic fragility analysis has an important role in seismic hazard evaluation. In this paper, the seismic fragility of sleeve connected prefabricated column is analyzed.

Design/methodology/approach

A model for predicting the seismic demand on sleeve connected prefabricated columns has been created by incorporating engineering demand parameters (EDP) and probabilities of seismic failure. The incremental dynamics analysis (IDA) curve clusters of this type of column were obtained using finite element analysis. The seismic fragility curve is obtained by regression of Exponential and Logical Function Model.

Findings

The IDA curve cluster gradually increased the dispersion after a peak ground acceleration (PGA) of 0.3 g was reached. For both columns, the relative displacement of the top of the column significantly changed after reaching 50 mm. The seismic fragility of the prefabricated column with the sleeve placed in the cap (SPCA) was inadequate.

Originality/value

The sleeve was placed in the column to overcome the seismic fragility of prefabricated columns effectively. In practical engineering, it is advisable to utilize these columns in regions susceptible to earthquakes and characterized by high seismic intensity levels in order to mitigate the risk of structural damage resulting from ground motion.

Details

International Journal of Structural Integrity, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1757-9864

Keywords

Article
Publication date: 4 March 2024

Yuxuan Wu, Wenyuan Xu, Tianlai Yu and Yifan Wang

Polyurethane concrete (PUC), as a new type of steel bridge deck paving material, the bond-slip pattern at the interface with the steel plate is not yet clear. In this study, the…

Abstract

Purpose

Polyurethane concrete (PUC), as a new type of steel bridge deck paving material, the bond-slip pattern at the interface with the steel plate is not yet clear. In this study, the mechanical properties of the PUC and steel plate interface under the coupled action of temperature, normal force and tangential force were explored through shear tests and numerical simulations. An analytical model for bond-slip at the PUC/steel plate interface and a predictive model for the shear strength of the PUC/steel plate interface were developed.

Design/methodology/approach

The new shear test device designed in this paper overcomes the defect that the traditional oblique shear test cannot test the interface shear performance under the condition of fixed normal force. The universal testing machine (UTM) test machine was used to adjust the test temperature conditions. Combined with the results of the bond-slip test, the finite element simulation of the interface is completed by using the COHENSIVE unit to analyze the local stress distribution characteristics of the interface. The use of variance-based uncertainty analysis guaranteed the validity of the simulation.

Findings

The shear strength (τf) at the PUC-plate interface was negatively correlated with temperature while it was positively correlated with normal stress. The effect of temperature on the shear properties was more significant than that of normal stress. The slip corresponding to the maximum shear (D1) positively correlates with both temperature and normal stress. The interfacial shear ductility improves with increasing temperature.

Originality/value

Based on the PUC bond-slip measured curves, the relationship between bond stress and slip at different stages was analyzed, and the bond-slip analytical model at different stages was established; the model was defined by key parameters such as elastic ultimate shear stress τ0, peak stress τf and interface fracture energy Gf.

Details

International Journal of Structural Integrity, vol. 15 no. 2
Type: Research Article
ISSN: 1757-9864

Keywords

Article
Publication date: 14 November 2023

Chunliang Niu

To obtain better fatigue resistance for marine engineering equipment welded joints in the design stage, the design method of the marine engineering equipment welded joint design…

Abstract

Purpose

To obtain better fatigue resistance for marine engineering equipment welded joints in the design stage, the design method of the marine engineering equipment welded joint design stage needs to be studied.

Design/methodology/approach

Based on the structural stress theory, a design method of the marine engineering equipment welded joints with better fatigue performance is proposed. The effectiveness of the method is demonstrated through the simulation analysis and fatigue test of typical marine engineering equipment welded joints.

Findings

Methods based on the theoretical advantages of structural stress and the principle of ensuring that the welded joint has a low degree of stress concentration.

Originality/value

The design method of marine engineering equipment welded joints proposed in this study provides a set of operable design routes for technicians, which can better meet the needs of engineering applications.

Details

International Journal of Structural Integrity, vol. 15 no. 1
Type: Research Article
ISSN: 1757-9864

Keywords

Article
Publication date: 15 November 2023

Jianbo Zhu, Jialong Chen, Wenliang Jin and Qiming Li

Promoting technological innovation is important to address the complexity of major engineering challenges. Technological innovations include short-term innovations at the project…

Abstract

Purpose

Promoting technological innovation is important to address the complexity of major engineering challenges. Technological innovations include short-term innovations at the project level and long-term innovations that can enhance competitive advantages. The purpose of this study is to develop an incentive mechanism for the public sector that considers short-term and long-term efforts from the private sector, aiming to promote technological innovation in major engineering projects.

Design/methodology/approach

This study constructs an incentive model considering the differences in short-term and long-term innovation efforts from the private sector. This model emphasizes the spillover effect of long-term efforts on current projects and the cost synergy effect between short-term and long-term efforts. It also explores the factors influencing the optimal incentive strategies for the public sector and innovation strategies for the private sector.

Findings

The results indicate that increasing the output coefficient of short-term and long-term efforts and reducing the cost coefficient not only enhance the innovation efforts of the private sector but also prompt the public sector to increase the incentive coefficient. The spillover effect of long-term innovation efforts and the synergy effect of the two efforts are positively related to the incentive coefficient for the public sector.

Originality/value

This research addresses the existing gap in understanding how the public sector should devise incentive mechanisms for technological innovation when contractors acting as the private sector are responsible for construction within a public-private partnership (PPP) model. In constructing the incentive mechanism model, this study incorporates the private sector's short-term efforts at the project level and their long-term efforts for sustained corporate development, thus adding considerable practical significance.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of 19