1 – 10 of 49Neil Govender, Samuel Laryea and Ron Watermeyer
Competitive tendering in South Africa is often associated with procurement based on the lowest fee tendered. Previous research on this topic did not provide in-depth examinations…
Abstract
Purpose
Competitive tendering in South Africa is often associated with procurement based on the lowest fee tendered. Previous research on this topic did not provide in-depth examinations of how pricing within consulting engineering companies was affected by competitive tendering nor did it illuminate the extent to which professional services were impacted by competitive tendering. This paper aims to examine the implications of competitive tendering on pricing and delivery of consulting engineering services in South Africa.
Design/methodology/approach
A survey research strategy with a questionnaire as the research instrument elicited qualitative data from 28 experienced consulting engineers in South Africa. Thematic analysis was used to analyse qualitative data from the questionnaires.
Findings
Three key themes were identified, namely: considerations when determining consulting engineering fees on competitively tendered projects; the impact of reduced fees due to competitive tendering on the delivery of consulting engineering services; and interventions to prevent unsustainably “low” professional fees. Many consulting engineers in South Africa still determine fees using fee scales, while other considerations include resources, project complexity, risk, etc. Most participants asserted that design optimisation/value engineering, training, meetings and construction monitoring were adversely impacted by “low” fees.
Originality/value
This paper provides in-depth qualitative feedback from experienced consulting engineers (most having more than 20 years’ experience) on a topical issue in the South African construction industry. Thematic analysis was a novel method of analysis that was not used previously in this area of study.
Details
Keywords
Peter Dodzi Kwasi Agbaxode, Ehsan Saghatforoush and Sitsabo Dlamini
The conventional project delivery (CPD) approach has been reported in the literature as the most widely used project delivery method in the construction industry globally compared…
Abstract
Purpose
The conventional project delivery (CPD) approach has been reported in the literature as the most widely used project delivery method in the construction industry globally compared to other delivery methods. However, researchers and practitioners have argued that the approach, specifically during the production of design documentation under the CPD, lacks certain capabilities that ensure quality and enhance project delivery. Therefore, this study aims to use the Ghanaian construction industry to identify the capabilities required of the CPD in practice, particularly during the production of design documentation.
Design/methodology/approach
The study design follows a pragmatist philosophy and uses mixed methods based on a deductive approach. Data collection involved a questionnaire survey, followed by semi-structured interviews. Quantitative data analysis used descriptive and inferential statistics, whereas qualitative data analysis used content analysis with the assistance of IBM SPSS and QSR Nvivo 12 Pro.
Findings
Findings indicate that there should be incentives for producing good design documentation quality; mandatory coordination of design documentation; improving collaboration among designers; and allowing contractors to make input during the design stage.
Practical implications
The results indicate the need for the identified capabilities to be introduced in the CPD approach to improve design documentation quality.
Originality/value
This study offers a significant insight into the specific capabilities that are required of the CPD approach in practice particularly, in the production of design documentation
Details
Keywords
Yazeed A. Alragabah and Mohd. Ahmed
There is a limited number of research work on critical success factors (CSFs) in public construction projects in Saudi Arabia. In response to this knowledge gap, the objective of…
Abstract
Purpose
There is a limited number of research work on critical success factors (CSFs) in public construction projects in Saudi Arabia. In response to this knowledge gap, the objective of this paper is to assess the impact of CSFs on the government construction projects in Saudi Arabia. The success factors are investigated from a broader consideration of failure criteria, from consideration of most effectiveness in successful project completion and also from consideration of the impact of implementing control processes for successful project completion.
Design/methodology/approach
This study has analysed the impact of success factors on construction projects in Saudi Arabia using a descriptive methodology. An exhaustive literature survey is undertaken to identify the success and failure factors related to government construction projects in Saudi Arabia. The survey data are sorted out and analysed by cost, schedule, technical, context and finance dimensions of the projects based on project types, engineering complexity, size, modality, jurisdictional control and funding approach. To evaluate the influence of success factors implementation, qualitative data were collected in a survey via a web-based questionnaire that was sent to officials working and occupying a responsible position in national project guidelines organizations and in government construction organizations in Saudi Arabia. In all, 28 CSFs were identified, ranked and evaluated for their impact on project success. The four identified factors belong to process categories of construction projects, nine factors belong to management of construction projects and 15 success factors are identified for impact assessment of implementation in construction projects.
Findings
The study's findings have identified and ranked the top five CSFs that significantly influence project outcomes, including meeting time targets, adhering to financial budgets, delivering desired outcomes for all stakeholders, effectively managing risks and assembling the appropriate team while optimizing resource allocation. Additionally, the research indicates that hindrances to projects primarily stem from execution, economic, human and political factors. The study advocates for strict controls over incomplete engineering designs and advises against contractors independently handling design work to ensure project success. Additionally, addressing contractors' qualifications and financial matters is crucial for project success. By highlighting these CSFs and challenges, the research provides actionable insights to enhance project management practices in the construction industry.
Research limitations/implications
This study is limited to the infrastructure projects constructed by governmental bodies with the participation of officials from government organizations. Further study, including private projects and officials working on private projects, may be needed to generalized the research outcome.
Originality/value
Numerous studies have investigated CSFs in construction projects, but few have examined their relevance to Saudi Arabian government projects. This study aims to fill this gap by identifying key CSFs specific to Saudi Arabian public sector construction projects and assessing their impact on project success. It advocates for stringent controls in the Saudi Arabian construction sector, emphasizing the importance of preventing incomplete or altered engineering designs by contractors to increase the success rate of public sector projects. This research offers practical insights to stakeholders, advancing project management practices in Saudi Arabia's construction sector for improved outcomes and resource utilization.
Details
Keywords
Petteri Annunen, Juho Tella, Sini Pekki and Harri Haapasalo
This study describes how maintenance capability should be created during the design and construction phases of construction projects. Purpose of the abstract to define the…
Abstract
Purpose
This study describes how maintenance capability should be created during the design and construction phases of construction projects. Purpose of the abstract to define the elements for creating the maintenance capability and the process to be used in construction life cycle projects for buildings.
Design/methodology/approach
An inductive and qualitative research method was used to construct the proposed process based on the literature and 18 interviews in two large construction companies.
Findings
The results indicate that the maintenance phase is usually overlooked during the design and construction phases, and capabilities are not systematically built. In particular, processes are lacking in data management, causing severe problems in maintenance.
Originality/value
This study presents a process including key requirements and activities for creating maintenance capability in conjunction with the design and construction phases, which is novel to the literature. The validated process can be adapted based on the needs of the construction company.
Details
Keywords
Atupakisye Mwakolo, Meshack Siwandeti, Leticia Mahuwi and Baraka Israel
The study aims to explore the role of procurement of good governance (PGG) on value for money (VfM) achievement in public construction projects. By investigating various…
Abstract
Purpose
The study aims to explore the role of procurement of good governance (PGG) on value for money (VfM) achievement in public construction projects. By investigating various dimensions of PGG, including transparency, accountability, competition and integrity, this study provides insights into how these factors contribute to the successful achievement of VfM outcomes in public construction projects.
Design/methodology/approach
The data were sourced from 203 construction project practitioners from 24 selected procuring entities in Tanzania using a census approach and a cross-sectional questionnaire survey. Confirmatory factor analysis (CFA) and structural equation modelling (SEM) were used for data analysis.
Findings
The findings of the study revealed a positive and significant impact of various dimensions of PGG on VfM. Specifically, transparency, accountability, competition and integrity were positively and significantly related to VfM, with p-values <0.001. Based on the study findings, we conclude that PGG is an important predictor of VfM achievement in public construction projects.
Practical implications
The study offers policy implications for streamlined PGG and VfM achievement in public construction projects. It is suggested that procuring entities can enhance VfM by enforcing compliance with the principles of PGG throughout the entirety of construction projects. In this case, streamlined legislative frameworks and control mechanisms are crucial components that could enhance PGG and the achievement of VfM.
Originality/value
This study contributes to the academic literature on the strategic role of PGG in enhancing VfM achievement. This is one of the research domains, which has not been adequately researched, particularly in Tanzania’s context. In addition, the study provides valuable insights to policymakers, practitioners and stakeholders involved in public construction projects to improve project outcomes and resource allocation.
Details
Keywords
Evan Shellshear and Kah Wee Oh
This paper investigates the constraints an organisation faces when using recruitment agencies and having to trade-off between the speed of hiring a candidate, the cost of a…
Abstract
Purpose
This paper investigates the constraints an organisation faces when using recruitment agencies and having to trade-off between the speed of hiring a candidate, the cost of a candidate and the match of the candidate against the job requirements across different job seniorities. We analyse how technology can shift the cost and hiring speed in spite of these constraints.
Design/methodology/approach
The research design is exploratory, quantitative and cross-sectional. The study employed a two-factor, unbalanced class Analysis of Variance (ANOVA) including interaction effects to test the difference between the means of the class of interest and a control class.
Findings
Our empirical findings confirm that (1) the technological innovation of a recruitment agency marketplace can liberate organisations from their time, cost and quality hiring constraints, accelerating the time to hire by four times and reducing costs by over 12%, and (2) these results hold across varying role seniority levels.
Originality/value
This study contributes to the existing literature in three ways: (1) it introduces the recruitment triangle from project management into the recruitment literature; (2) it demonstrates how technological innovations such as recruitment agency marketplaces are able to provide a shift in the constraints posed by the recruitment triangle.
Details
Keywords
Afamefuna Paul Eyisi and Emeka Emmanuel Okonkwo
The purpose of this paper is to explore and understand the perceptions of residents of Southeastern Nigeria about glocalizing tourism in the region to help improve their support…
Abstract
Purpose
The purpose of this paper is to explore and understand the perceptions of residents of Southeastern Nigeria about glocalizing tourism in the region to help improve their support for the sustainability of the industry. Emphasis is laid on their expectations and strategies to maximize the positive impacts while minimizing the negative aspects in a bid to address their specific local needs.
Design/methodology/approach
This paper adopts an ethnographic approach to explore the perspectives of key stakeholders in Southeastern Nigeria's tourism industry. These include traditional rulers, men, women and youth representatives, chief priests and local security agents. Decision-making theory is adopted to frame the study.
Findings
The findings identified residents' expectations from glocalizing tourism. They see tourism as an avenue for initiating community projects, creating jobs, patronizing farm produces, reviving cultural practices and addressing religious crises.
Research limitations/implications
This research focused only on selected communities within Southeastern Nigeria. The implication is that the findings do not represent what obtains in other communities within the region. Future research should extend to these areas to have a deeper understanding of how residents perceive the glocalization of tourism.
Practical implications
As the government and developers continue to invest in the tourism industry in the study area, glocalization could be a good way to address specific local needs and gain residents' support in the future.
Originality/value
This paper represents a new research approach for understanding the perceptions of residents about the Nigerian tourism industry.
Details
Keywords
Leticia Mahuwi and Baraka Israel
Understanding the interplay between transparency, accountability and e-procurement and their collective contribution to anti-corruption efforts in public procurement is crucial…
Abstract
Purpose
Understanding the interplay between transparency, accountability and e-procurement and their collective contribution to anti-corruption efforts in public procurement is crucial for developing effective strategies and policies. This research seeks to investigate whether e-procurement plays a significant role in enhancing transparency and accountability and subsequently reducing corruption risks in the public pharmaceutical procurement system.
Design/methodology/approach
The study employed a cross-sectional questionnaire survey to gather data from 274 procurement personnel and pharmacists working in 28 government-owned hospitals in the Southern Highlands of Tanzania. The collected data were then analysed using confirmatory factor analysis (CFA) and the Hayes PROCESS macro to test the study hypotheses.
Findings
The study findings revealed a negative and significant relationship between transparency and procurement corruption (ß = −0.117, p < 0.008). Moreover, accountability negatively and significantly affects procurement corruption (ß = −0.162, p = 0.006). Furthermore, the findings indicate that, at a high degree of e-procurement system implementation, transparency and accountability have a stronger impact on procurement anti-corruption measures.
Practical implications
Policymakers and decision-makers should implement robust mechanisms that enhance transparency, accountability and anti-corruption efforts. These may include providing clear and accessible information on procurement processes, efficient mechanisms for monitoring and reporting procurement irregularities and continuous improvement of e-procurement systems. By incorporating these measures and nurturing collaboration amongst procurement stakeholders, it becomes possible to foster a procurement environment characterised by integrity, fairness, accountability and reduced corruption.
Originality/value
Whilst previous studies delved into exploring the effect of transparency and accountability on procurement anti-corruption, the novelty of this study is the inclusion of e-procurement as a moderating variable in the relationship between transparency, accountability and anti-corruption. By so doing, this study adds to the existing body of knowledge regarding anti-corruption measures and offers valuable practical insights for policymakers and professionals aiming to enhance transparency, accountability and ethical conduct within the public pharmaceutical procurement system.
Details
Keywords
Priscila Laczynski de Souza Miguel and Andrea Lago da Silva
This paper aims to investigate how purchasing organizations implement supplier diversity (SD) initiatives over time.
Abstract
Purpose
This paper aims to investigate how purchasing organizations implement supplier diversity (SD) initiatives over time.
Design/methodology/approach
A multiple case study approach was conducted. Data were collected through in-depth interviews with participants from purchasing organizations, intermediary organizations and diverse suppliers.
Findings
The research suggests that the SD journey encompasses three different, but interrelated stages before full implementation is achieved: structuring, operation and adaptation. The findings also provide evidence that SD implementation in Brazil is highly influenced by the lack of a consistent knowledge base and the lack of legitimized intermediary organizations.
Research limitations/implications
Using a temporal approach to understand how different practices suggested by the literature have been managed by practitioners over time, this study contributes to the understanding of the path to effective SD implementation and how intra- and interorganizational context influences this journey.
Practical implications
By identifying which practices should be adopted during different phases of SD implementation and proposing ways to overcome some of the inherent challenges, managers can better plan and allocate resources for the adoption of a successful SD initiative.
Social implications
This research demonstrates how organizations can promote diversity and reduce social and economic inequalities by buying from diverse suppliers.
Originality/value
Using a temporal approach, the research empirically investigates how different purchasing organizations have implemented and managed the known practices and dealt with the challenges faced when trying to adopt SD.
Details
Keywords
Johanna Maria Liljeroos-Cork and Kaisu Laitinen
Infrastructure forms a basis for the operations and sustainability of the modern society. This paper aims to recognize value creation from the infrastructure procurement ecosystem…
Abstract
Purpose
Infrastructure forms a basis for the operations and sustainability of the modern society. This paper aims to recognize value creation from the infrastructure procurement ecosystem perspective to achieve those goals. The pursuit of enhancing value creation involves an examination of infrastructure procurement challenges, boundaries as well as boundary spanners that facilitate effective knowledge transfer and interaction.
Design/methodology/approach
The qualitative study is based on content analysis of 25 thematic interviews. Data was transcribed and coded via Atlas.ti software.
Findings
Infrastructure procurement value creation challenges appear complex and related to boundaries that hamper collaboration, coordination and knowledge sharing. Our results show that these boundaries locate within and between different levels of procurement ecosystem. Therefore, value creation in infrastructure procurement requires boundary spanners for leveraging knowledge sharing and interaction. Artifacts, discussion, processes and brokers as identified boundary spanners are strongly nested and interrelated in the industry. Special attention should be given to supporting individuals to act as brokers, since they play the key roles in trust building, culture steering and usage of other boundary spanners.
Social implications
Promoting value creation in infrastructure procurement helps to achieve socio-economic development goals.
Originality/value
This study offers a unique perspective on value creation in the context of infrastructure by adopting an ecosystem lens and examining boundary crossing mechanisms. The results support future development of collaboration and knowledge sharing practices fostering procurement productivity.