Search results
1 – 10 of 139Muhammad Azeem Abbas, Saheed O. Ajayi, Adekunle Sabitu Oyegoke and Hafiz Alaka
Master information delivery plan (MIDP) is a key requirement for building information modelling (BIM) execution plan (BEP) that enlists all information deliverables in BIM-based…
Abstract
Purpose
Master information delivery plan (MIDP) is a key requirement for building information modelling (BIM) execution plan (BEP) that enlists all information deliverables in BIM-based project, containing information about what would be prepared, when, by who, as well as the procedures and protocols to be used. In a well-conceived BEP, the MIDP facilitates collaboration among stakeholders. However, current approaches to generating MIDP are manual, making it tedious, error-prone and inconsistent, thereby limiting some expected benefits of BIM implementation. The purpose of this study is to automate the MIDP and demonstrate a collaborative BIM system that overcomes the problems associated with the traditional approach.
Design/methodology/approach
A BIM cloud-based system (named Auto-BIMApp) involving naming that automated MIDP generation is presented. A participatory action research methodology involving academia and industry stakeholders is followed to design and validate the Auto-BIMApp.
Findings
A mixed-method experiment is conducted to compare the proposed automated generation of MIDP using Auto-BIMApp with the traditional practice of using spreadsheets. The quantitative results show over 500% increased work efficiency, with improved and error-free collaboration among team members through Auto-BIMApp. Moreover, the responses from the participants using Auto-BIMApp during the experiment shows positive feedback in term of ease of use and automated functionalities of the Auto-BIMApp.
Originality/value
The replacement of traditional practices to a complete automated collaborative system for the generation of MIDP, with substantial productivity improvement, brings novelty to the present research. The Auto-BIMApp involve multidimensional information, multiple platforms, multiple types and levels of users, and generates three different representations of MIDP.
Details
Keywords
This paper presents a set of instrumental case studies for the context-based learning of BIM in the milieu of knowledge-based practice in the AEC industry. The study aimed to…
Abstract
Purpose
This paper presents a set of instrumental case studies for the context-based learning of BIM in the milieu of knowledge-based practice in the AEC industry. The study aimed to examine students' actions and perspectives in a simulated learning environment for real-world BIM processes. The core intent was to provide an in-depth understanding of strategic and functional BIM implementation by synthesizing a suggestive pedagogical framework based on context-based learning approaches.
Design/methodology/approach
Derived from context-based approaches and experiential learning methods such as role-play, problem-based and active learning, the study involved a set of doctoral-level case studies. In a qualitative research study, these cases were devised and organized around industry-focused simulations on various levels of BIM implementation strategies.
Findings
Results from the case studies and the student responses suggest that the comprehensive evaluation of real-world BIM implementation simulations facilitates a solid understanding of the value of BIM. The participation of industry professionals catalyzes the development of strategic and functional BIM competencies.
Originality/value
The study proposes a well-structured and replicable BIM learning framework based on context-based learning approaches. The novel framework is adaptive and flexible for BIM education. It can provide students with the necessary skills, strategic vision and professional competencies for innovative practices in the 21st-century AEC Industry. The simulative learning settings, including the evaluation rubrics and connected instructional methods, can be implemented and further developed for similar education efforts.
Details
Keywords
Dat Tien Doan, Ali Ghaffarianhoseini, Nicola Naismith, Amirhosein Ghaffarianhoseini and John Tookey
In New Zealand, building information modelling (BIM) prevalence is still in its early stages and faces many challenges. This research aims to develop a BIM adoption framework to…
Abstract
Purpose
In New Zealand, building information modelling (BIM) prevalence is still in its early stages and faces many challenges. This research aims to develop a BIM adoption framework to determine the key factors affecting the success of a BIM project.
Design/methodology/approach
Both primary and secondary data were employed in this research, including 21 semi-structured interviews and industry guidelines from the three most well-known global building excellence models (BEMs). The data were analysed through content analysis due to its recognised benefits as a transparent and reliable approach.
Findings
Leadership, clients and other stakeholders, strategic planning, people, resources, process and results were identified as seven main categories along with 39 indicators in the BIM adoption framework. Based on the interviewees' perspectives, leadership is considered the most significant category, impacting all of the remaining categories.
Practical implications
Using the developed framework will enhance comprehension of BIM, offering directives for those embracing BIM. This will aid construction stakeholders in being better equipped for BIM projects. Having a skilled BIM manager can lead to the success of construction projects.
Originality/value
This research contributed to the existing body of knowledge by providing the categories with specific factors that assist BIM practitioners in assessing their BIM performance for further BIM practice improvement.
Details
Keywords
Abraham Kuol, Koorosh Gharehbaghi, Ken Farnes, Kong Fah Tee and Kerry McManus
While efficient design in engineering projects is crucial, this paper aims to examine the integration of Building Information Modeling (BIM) into railway Intelligent…
Abstract
Purpose
While efficient design in engineering projects is crucial, this paper aims to examine the integration of Building Information Modeling (BIM) into railway Intelligent Transportation Systems (ITS). The paper provides some key understanding of integrating BIM and ITS to improve the efficiency of railway infrastructure projects.
Design/methodology/approach
An in-depth qualitative analysis of three ITS case studies was conducted to understand BIM’s global impact and benefits in railway infrastructure projects. While case study one investigated the Crossrail (UK), the other two case studies were TUC Rail (Belgium) and the Intercity railway network (Norway).
Findings
The findings include the specific benefits of BIM, regarding the railway infrastructure. The result indicated that BIM benefits were consistently the same across all case studies. Although Case study 1 was the only one that boasts a high reduction in waste and reworks, all of the case studies showed less rework and delays due to BIM. The results indicated that the advantages of BIM for such projects are cost optimization, reduction in waste, rework and lessening delays. Subsequently, this leads to the ease and efficiency with which structures and railways can be built. The outcomes can ultimately assist transportation planners in better planning and managing railway projects.
Practical implications
This study proposes the integration of BIM into railway projects as a part of their ITS. The BIM integration into railway projects as a part of their ITS fits within the overall planning to handover phases. Specifically, the BIM integration improves the design process of typical railway projects. Thus, the most significant advantage of BIM for railway projects is to further improve their design process leading to a higher degree of constructability.
Originality/value
Railway infrastructure performs a major role in economic and regional development. The complexity of railway projects continues to increase as the need for more railway infrastructure is on the rise globally. BIM is proving to be an effective tool for improving the efficiency of railway infrastructure projects. As the utilization of BIM is intensifying, the railway industry can further exploit BIM to improve project delivery adeptness by offering greater collaboration leading to efficient design processes. As a result, the understanding of BIM for horizontal projects such as railway infrastructure on a global scale is a substantial exercise that this research aims to respond to.
Details
Keywords
Heap-Yih Chong, Yufan Zhang, Cen Ying Lee, Fei Wang and Yubin Zhang
Audit trail cost management is crucial for ensuring accountability and enhancing quality assurance in construction management. Despite limited practical studies on audit trail…
Abstract
Purpose
Audit trail cost management is crucial for ensuring accountability and enhancing quality assurance in construction management. Despite limited practical studies on audit trail management from a cost perspective; this study developed a lifecycle-based audit trail cost management framework. It used synchronized Building Information Modeling (BIM) cost models and Bills of Quantities (BoQs) to address the existing gap.
Design/methodology/approach
This study employed a descriptive case study approach of a real-life hospital project in China. Data triangulation was achieved through interviews, observations, documents, and relevant artifacts.
Findings
The study identified three key factors contributing to cost variances between BIM cost models and BoQs: differences in measurement rules, model precision, and professional errors, particularly evident during the preliminary estimate stage. Notably, significant cost savings of approximately RMB 5.811 million were achieved during the detailed estimate stage. During the construction phase, a synchronized approach was deployed to improve precise payment verification and modifications to the BIM model. In the post-construction phase, the synchronized as-built BIM models and BoQs served as primary references to facilitate the resolution of operational discrepancies.
Practical implications
The research contributes to the literature by proposing a synchronized approach of BIM cost models and BoQs. This approach enhances traceability and accountability of project information, catering to the digitalization needs of the construction industry.
Originality/value
This study unveils a pragmatic approach to enhancing transparency and accountability in audit-trail cost management by synchronizing BIM cost models and BoQs at various project stages. The synchronized approach offers a promising direction for future research and implementation of audit trail frameworks to enhance cost management in construction.
Details
Keywords
Samuel Adeniyi Adekunle, Clinton Ohis Aigbavboa and Obuks Augustine Ejohwomu
The implementation of BIM in the construction industry requires the coevolution of the various aspects of the BIM ecosystem. The human dimension is a very important dimension of…
Abstract
Purpose
The implementation of BIM in the construction industry requires the coevolution of the various aspects of the BIM ecosystem. The human dimension is a very important dimension of the ecosystem necessary for BIM implementation. It is imperative to study this aspect of the BIM ecosystem both from the employer perspective and employee availability to provide insights for stakeholders (job seekers, employers, students, researchers, policymakers, higher education institutions, career advisors and curriculum developers) interested in the labour market dynamics.
Design/methodology/approach
To understand the BIM actor roles through the employer lens and the actual BIM actors in the construction industry, this study employed data mining of job adverts from LinkedIn and Mncjobs website. Content analysis was employed to gain insights into the data collected. Also, through a quantitative approach, the existing BIM actor roles were identified.
Findings
The study identified the employers' expectations of BIM actors; however, it is noted that the BIM actor recruitment space is still a loose one as recruiters put out open advertisements to get a large pool of applicants. From the data analysed, it is concluded that the BIM actor role is not an entirely new profession. However, it simply exists as construction industry professionals with BIM tool skills. Also, the professional development route is not well defined yet.
Originality/value
This study presents a realistic angle to BIM actor roles hence enhancing BIM implementation from the human perspective. The findings present an insight into the preferred against the actual.
Details
Keywords
Stephanie Sheamar, Gayan Wedawatta, Maheshi Tennakoon, Roshani Palliyaguru and Maxwell Fordjour Antwi-Afari
Cost overrun is a significant issue in construction, an undesirable feature the industry has long been associated with. Poor procurement practices are often blamed for subsequent…
Abstract
Purpose
Cost overrun is a significant issue in construction, an undesirable feature the industry has long been associated with. Poor procurement practices are often blamed for subsequent cost overruns in construction, especially with conventional procurement methods leading to outrageous cost overruns. The purpose of this study is to review the features of the new models of construction procurement (NMCP) and assess their potential to reduce cost overruns in construction projects.
Design/methodology/approach
A literature review was conducted to identify the issues of procurement leading to cost escalations. Primary data were obtained through exploratory, semi-structured interviews using a case study approach.
Findings
Clients’ lack of knowledge was highlighted as a key issue in procurement that interlinks with many factors causing cost escalation. The findings suggest that the features contained within the NMCP, such as early contractor involvement and collaboration throughout the project team, have the potential to make a positive contribution to addressing cost escalation in construction.
Research limitations/implications
The primary research was undertaken as an exploratory study and presents the contractor's perspective. Further research is therefore suggested, with multiple organisations representing all key stakeholders in a construction project, including clients, consultants, sub-contractors and suppliers.
Practical implications
The study recommends awareness of the NMCP be raised throughout the industry, and simplified information must be made available to help widen uptake of these contemporary procurement methods.
Originality/value
Addressing the dearth of research concerning the use of NMCP within the industry, this study makes a niche contribution to the body of knowledge on construction cost management by illustrating the potential offered by these new procurement methods for addressing cost escalation. For an industry where collaboration is accepted with reservations, this case study demonstrates how novel collaborative strategies such as open book costing, project bank accounts and shared pain and gain mechanisms can be implemented as part of the procurement strategy and how such strategies can contribute towards minimising the cost escalation inherent in construction projects.
Details
Keywords
Bruno Falcón Silveira and Dayana Bastos Costa
Several studies have addressed the use of four-dimensional (4D) building information modeling (BIM) for construction management. However, the automation of the processes for…
Abstract
Purpose
Several studies have addressed the use of four-dimensional (4D) building information modeling (BIM) for construction management. However, the automation of the processes for generating 4D models and their integrated use with Location-Based Planning and the Last Planner® System is not well discussed. Therefore, this paper aims to develop a method for automating the generation and use of 4D BIM models integrated with Location-Based Planning and Last Planner® System supporting project control cycles.
Design/methodology/approach
The research strategy adopted was Design Science Research. The automated method for using the 4D models was developed and refined in two residential building projects in Brazil, along with 31 meetings and involving 11 direct users. The assessment of the proposed method focuses on four constructs: the impact of process automation, the impact on the identification and assessment of site progress and the planning process, ease of adoption and utility of the proposed method.
Findings
The results of this paper indicated increased adherence between planned and executed through an automated method for using the 4D models. The established routines enabled automating the link between the planning levels and the three-dimensional (3D) model, providing a more agile and updated data source and achieving 92.8% of user satisfaction regarding the deadline and frequency of delivery of the 4D model reports. Moreover, this study identified the relationships between the processes of the method proposed and Digital Models.
Originality/value
The primary scientific value achieved in this study is creating a method for automating processes and simplifying steps for the generation and use of 4D BIM models in the production planning and control cycles during the construction phase.
Details
Keywords
Ningshuang Zeng, Xuling Ye, Yan Liu and Markus König
The unstable labor productivity and periodic planning method cause barriers to improving construction logistics management. This paper aims to explore a demand-driven mechanism…
Abstract
Purpose
The unstable labor productivity and periodic planning method cause barriers to improving construction logistics management. This paper aims to explore a demand-driven mechanism for efficient construction logistics planning to record the material consumption, report the real-time demand and trigger material replenishment from off-site to on-site, which is aided by Building Information Modeling (BIM) and the Kanban technique.
Design/methodology/approach
This paper follows the design science research (DSR) principles to propose a system of designing and applying Kanban batch with 4D BIM for construction logistics planning and monitoring. Prototype development with comparative simulation experiments of a river remediation project is conducted to analyze the conventional and Kanban-triggered supply. Two-staged industrial interviews are conducted to guide and evaluate the system design.
Findings
The proposed BIM-enabled Kanban system enables construction managers and suppliers to better set integrated on- and off-site targets, report real-time demands and conduct collaborative planning and monitoring. The simulation results present significant site storage and schedule savings applying the BIM-enabled Kanban system. Feedback and constructive suggestions from practitioners are collected via interviews and analyzed for further development.
Originality/value
This paper brings to the limelight the benefits of implementing BIM-enabled demand-driven replenishment to remove waste from the material flow. This paper combines lean production theory with advanced information technology to solve construction logistics management problems.
Details
Keywords
Furkan Polat and Sevilay Demirkesen
The main purpose of this study is to reveal the degree of association between lean, building information modeling (BIM) and construction project success. The study further intends…
Abstract
Purpose
The main purpose of this study is to reveal the degree of association between lean, building information modeling (BIM) and construction project success. The study further intends to provide strategies for high and low associations of the factors.
Design/methodology/approach
Lean construction and BIM are two important applications that have recently gained popularity in terms of enhancing project success. Considering this impact, this study investigates the synergy between lean construction and BIM and determines to what extent these two contribute to the success of the projects. As a first step, lean, BIM and project success were examined based on an in-depth literature review. In the second stage, a structural equation model (SEM) was established to reflect the relationship among these three through hypotheses. Then, a questionnaire was designed and administered to the construction professionals experienced in both lean and BIM implementation. The SEM was tested using Analysis of Moment Structures (AMOS), an SPSS tool.
Findings
The results indicated that lean implementation has a significant and positive impact on BIM implementation and project success. On the other hand, BIM implementation had a lower significant impact on project success than lean implementation construct.
Research limitations/implications
The results of this study can be used by both policymakers and industry practitioners in terms of developing strategies for effectively using both lean and BIM. The researchers can further develop other implementation models to investigate whether these concepts are more effective in increasing project success when used integratively.
Originality/value
This study considers both the impact of lean and BIM on project success through input from construction practitioners working on large projects. This way, the study fosters the use of lean, BIM or lean–BIM together in construction projects to enhance project success.
Details