Article
Publication date: 7 April 2023

Win Myat Cho and Bonaventura H.W. Hadikusumo

The objectives of this paper are to examine the impact of psychological contract on project performance in private construction projects and to investigate if the positive effect…

Abstract

Purpose

The objectives of this paper are to examine the impact of psychological contract on project performance in private construction projects and to investigate if the positive effect of psychological contract on project performance can be mediated by inter-organisational teamwork.

Design/methodology/approach

Multiple regression analysis and mediation analysis were applied in this study to conduct the proposed hypotheses. Data were collected via questionnaire surveys from the construction professionals working for contractor firms on private construction projects.

Findings

The result of the multiple regression analysis indicated that psychological contract between contractors and owners is significantly related with project performance in construction projects. This study examined five psychological contract components, but the most important element was found as trust which can influence every aspect of project performance. Fairness is another key factor that can improve project performance in terms of budget and quality. Further, the findings of the mediation analysis revealed that inter-organisational teamwork has a mediating effect on the relationship between psychological contract and project performance.

Originality/value

This paper presents the important role of psychological contract between contractor and owner organizations in construction projects that can affect project performance. The study also highlights the significance of inter-organisational teamwork as a mediator to the relationship between psychological contract and project performance.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 17 May 2024

Xiaoyan Chen, Weina Zhu, Yajiao Chen and Qinghua He

The development and evolution of stakeholder collaborative innovation in megaprojects is impacted by various influencing factors. The effect of influencing factors on…

Abstract

Purpose

The development and evolution of stakeholder collaborative innovation in megaprojects is impacted by various influencing factors. The effect of influencing factors on collaborative innovation performance (CIP) in megaprojects is not a simplistic linear relationship but an iterative and non-linear relationship that requires a dynamic perspective to analyze. Therefore, this paper adopts the system dynamic (SD) approach to investigate the dynamic and interactive relationships between the CIP and the influencing factors.

Design/methodology/approach

The study first develops a research framework with the system boundary of “CIP system – organizational collaboration subsystem – knowledge collaboration subsystem – strategic collaboration subsystem”. Then, the causal relationship model, the stock-flow model, and the mathematical equations were determined based on the literature review and the expert interviews. Finally, five performance improvement scenarios were designed according to the practice context of CIP in megaprojects, and simulations were performed using the Vensim PLE software to investigate the CIP from a dynamic perspective.

Findings

The findings reveal that the effect of different influencing factors on CIP grows non-linearly, with the cumulative effect becoming more pronounced as time advances. The incentive mechanism has the most significant effect, and the combined effect of multiple influencing factors has a highly significant facilitating effect on improving CIP. Strategic collaboration, organizational collaboration and knowledge collaboration are mutually conditional and reinforcing with each other, which ultimately promotes the improvement of CIP.

Originality/value

This study uncovers the inherent pattern and the interactive dynamic mechanism of factors for improving CIP in the context of megaprojects. It enriches the theoretical research in the area of collaborative innovation in megaprojects and provides practical management strategies for improving CIP.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 4 September 2024

Richard Kadan and Jan Wium

Megaproject supply chains involve multiple layers of stakeholders, leading to complex relationships and risks. The role of social interactions within these networks is unexplored…

Abstract

Purpose

Megaproject supply chains involve multiple layers of stakeholders, leading to complex relationships and risks. The role of social interactions within these networks is unexplored. Therefore, an analysis of construction supply chain risk management from the perspective of social networks is essential to identify related stakeholders, their relationships and the social network risk factors.

Design/methodology/approach

About 65 risk factors, identified from literature and interviews, informed the development of a questionnaire for the study. Online questionnaires administered in Ghana and South Africa produced 120 valid responses. Feedback from the responses was ranked and assessed to determine the overall social network risk levels using the Normalised Mean and Fuzzy synthesis analysis methods.

Findings

About 24 risk factors were identified and classified into six groups: Client/Consultant-related, Community-related, Government-related, Industry Perception-related, Supplier-related and Stakeholder Opportunism. The top five social network risks identified include bribery, supplier monopoly, incomplete design teams, poor communication and lack of collaboration.

Practical implications

The study provides detailed evaluations of social network risks in Africa, and the findings will help in developing strategies to mitigate supply chain disruptions caused by these challenges.

Originality/value

This study contributes to the literature on supply chain risk management by offering context-specific insights into the social network perspective of megaprojects in Africa, which differs from those in developed countries.

Details

Built Environment Project and Asset Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 8 March 2024

Md. Mohaimenul Islam Sourav, Mohammed Russedul Islam, Sheikh Mohibur Rahman and Md. Istiak Jahan

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of…

Abstract

Purpose

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of delays by taking responses from the stakeholders who are responsible for planning, design, funding, approval and implementation. There are few studies that have related infrastructure project delays to heterogeneity in stakeholders’ perceptions.

Design/methodology/approach

A structural equation (SE) model is developed with 350 normally distributed data points to understand the heterogeneity in stakeholders’ perceptions regarding delays in infrastructure projects in BD. Additionally, the relative importance index (RII) approach is used to assess the responses, validating the SE model.

Findings

The study finds that among the three latent variables, “Project itself related delay” has more influence on delays in infrastructure projects. Among the observed variables under the “project itself related delay” latent variable, “DPP approval process” has the most significance. From the heterogeneity analysis, the study found differences in responses among the stakeholders from “the Engineering Department,” “the Planning Office” and “the Construction Firm/Industry.” An important class of stakeholders believes that their stage is not being delayed and that other stages require attention.

Research limitations/implications

The data sample is 350. More data can improve the accuracy of the findings. Most of the respondents are civil engineers (74%) and represent the owner of the project. Sample data from more stakeholders’ will enhance the accuracy of the result.

Practical implications

This study addresses the requirements of Bangladeshi project stakeholders and how their interactions cause delays in projects. Furthermore, the opinions of other stakeholders are taken into consideration when determining the specific factors of individual stakeholders that are causing delays. Practically, the distance between stakeholders should be reduced. A project manager can play a role in this regard. Initiatives should be taken on how to complete the project quickly by eliminating the requirements discussed among the stakeholders and bureaucratic complications. Instead of placing blame on one another, stakeholders should take the initiative to figure out how to work together to finish the project on schedule. The Planning Commission’s approval of the Development Project Proposal (DPP) and Revised Development Project Proposal (RDPP) should be obtained as soon as possible by owner stakeholders. In order to avoid frequently changing the DPP, owners should also exercise greater caution when choosing contractors. Contractor stakeholders should use efficient and proper manpower and equipment so that unexpected delays are not created during the execution of work. Since the role of the contractor stakeholder is the most important among the three types of stakeholders, the contractor should raise awareness and urge the owners to get the RDPP approved quickly.

Originality/value

The findings from the study can help mitigate delays in infrastructure projects in BD, taking into account the perceptions of various stakeholders.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 6 August 2024

Mazen M. Omer, Tirivavi Moyo, Ali Al-Otaibi, Aawag Mohsen Alawag, Ahmad Rizal Alias and Rahimi A. Rahman

This study aims to analyze the critical factors affecting workplace well-being at construction sites across countries with different income levels. Accordingly, this study’s…

Abstract

Purpose

This study aims to analyze the critical factors affecting workplace well-being at construction sites across countries with different income levels. Accordingly, this study’s objectives are to identify: critical factors affecting workplace well-being at construction sites in low-, lower-middle-, upper-middle- and high-income countries, overlapping critical factors across countries with different income levels and agreements on the critical factors across countries with different income levels.

Design/methodology/approach

This study identified 19 factors affecting workplace well-being using a systematic literature review and interviews with construction industry professionals. Subsequently, the factors were inserted into a questionnaire survey and distributed among construction industry professionals across Yemen, Zimbabwe, Malaysia and Saudi Arabia, receiving 110, 169, 335 and 193 responses. The collected data were analyzed using descriptive and inferential statistics, including mean, normalized value, overlap analysis and agreement analysis.

Findings

This study identified 16 critical factors across all income levels. From those, 3 critical factors overlap across all countries (communication between workers, general safety and health monitoring and timeline of salary payment). Also, 3 critical factors (salary package, working environment and working hours) overlap across low-, low-middle and upper-middle-income countries, and 1 critical factor (project leadership) overlaps across low-middle, upper-middle and high-income countries. The agreements are inclined to be compatible between low- and low-middle-income, and between low- and high-income countries. However, agreements are incompatible across the remaining countries.

Practical implications

This study can serve as a standard for maintaining satisfactory workplace well-being at construction sites.

Originality/value

To the best of the authors’ knowledge, this study is the first attempt to analyze factors affecting workplace well-being at construction sites across countries with different income levels.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 30 March 2023

Seyed Ashkan Zarghami and Ofer Zwikael

A variety of buffer allocation methods exist to distribute an aggregated time buffer among project activities. However, these methods do not pay simultaneous attention to two key…

Abstract

Purpose

A variety of buffer allocation methods exist to distribute an aggregated time buffer among project activities. However, these methods do not pay simultaneous attention to two key attributes of disruptive events that may occur during the construction phase: probability and impact. This paper fills this research gap by developing a buffer allocation method that takes into account the synergistic impact of these two attributes on project activities.

Design/methodology/approach

This paper develops a three-step method, calculating the probability that project activities are disrupted in the first step, followed by measuring the potential impact of disruption on project activities, and then proposing a risk-informed buffer allocation index by simultaneously integrating probability and impact outputs from the first two steps.

Findings

The proposed method provides more accurate results by sidestepping the shortcomings of conventional fuzzy-based and simulation-based methods that are purely based on expert judgments or historical precedence. Further, the paper provides decision-makers with a buffer allocation method that helps in developing cost-effective buffering and backup strategies by prioritizing project activities and their required resources.

Originality/value

This paper develops a risk-informed buffer allocation method that differs from those already available. The simultaneous pursuit of the probability and impact of disruptions distinguishes our method from conventional buffer allocation methods. Further, this paper intertwines the research domains of complexity science and construction management by performing centrality analysis and incorporating a key attribute of project complexity (i.e. the interconnectedness between project activities) into the process for buffer allocation.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 August 2024

Wenyao Liu, Qingfeng Meng, Zhen Li, Heap-Yih Chong, Keyao Li and Hui Tang

Construction workers’ safety behavior has been proven to be crucial in preventing occupational injuries and improving workplace safety, and organizational safety support provides…

Abstract

Purpose

Construction workers’ safety behavior has been proven to be crucial in preventing occupational injuries and improving workplace safety, and organizational safety support provides essential resources to promote such behavior. However, the specific mechanisms of how organizational safety support affects safety behavior have not been thoroughly explored. Therefore, this study explored the relationship between workers’ perceived organizational safety support (perceived supervisor/coworker safety support) and safety behavior (safety task/contextual behavior), while considering the mediating effects of safety motivation, emotional exhaustion, and the moderating effect of psychosocial safety climate.

Design/methodology/approach

Based on the quantitative research method, the hypothesis was tested. The data were collected from 500 construction workers using a structured questionnaire. Observed variables were tested using confirmatory factor analysis, and the path coefficient of fitted model was then analyzed including the associated mediating and moderating effects.

Findings

The study found that (1) safety support from both supervisors and coworkers directly forecasted both types of safety behavior, (2) safety motivation was primarily predicted by perceived supervisor safety support, and perceived coworker safety support better predicted emotional exhaustion. Safety motivation mediated the relationship between perceived supervisor safety support and safety contextual behavior, and emotional exhaustion mediated the relationship between both types of safety support and both types of safety behavior, (3) psychosocial safety climate moderated the pathway relationships mediated by safety motivation and emotional exhaustion, respectively.

Research limitations/implications

The samples of this study were mostly immersed in eastern culture and the construction industry, and the cultural and industry diversity of the samples deserves further consideration to enhance the universality of the results. The cross-sectional approach may have some impact on the accuracy of the results. In addition, other potential mediating variables deserve to be explored in future studies.

Originality/value

This study provides a new basis for extending current theoretical frameworks of organizational safety support and safety behavior by using a moderated mediation model. Some practical insights on construction safety management have also been proposed based on the research findings. It is recommended that practitioners should further raise awareness of the critical role of supervisor-worker and worker-coworker relationships, as high levels of safety support from the supervisor/worker respectively effectively encourage safety motivation, alleviate emotional exhaustion, and thus improve workers’ safety performance. Meanwhile, the psychosocial health conditions of workers should also receive further attention.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 4 July 2023

Aziz Yousif Shaikh, Robert Osei- kyei, Mary Hardie and Matt Stevens

This paper systematically reviewed research work on drivers of teamwork, which will reinforce construction work teams to enhance workers’ safety performance. This study adds to…

Abstract

Purpose

This paper systematically reviewed research work on drivers of teamwork, which will reinforce construction work teams to enhance workers’ safety performance. This study adds to the existing but limited understanding of teamwork drivers on construction workers’ safety performance. This paper presents scholars and industry-based professionals with critical initiatives that have to be implemented in organisations to get positive results in safety while working in teams with an emphasis on systems drivers of teamwork on safety performance at the organisational level, which will help in providing information on the functioning of the teams and contribute towards improved safety performance of team workers.

Design/methodology/approach

This study aims to systematically examine the existing body of knowledge on drivers of teamwork by analysing 53 publications from the years 1997–2021. The Scopus search engine was used to conduct a systematic review and germane publications were collated.

Findings

According to the findings of the review, since 1997, there has been a burgeoning concern in the research of drivers of teamwork and its impact on workers’ safety performance. After performing a systematic review, 37 drivers of teamwork were identified. The top five drivers are effective communications, team workers’ relations, leadership, shared knowledge and information, and team training. Moreover, it was noted that the United States and Australia have been the international regions of focus for most of the research in the area of drivers of teamwork from the years 1997–2021. The 37 drivers of teamwork are distributed into six major socio-technical components: people drivers; culture drivers; metrics drivers; organisational and management practices and procedures drivers; infrastructure drivers and technology drivers.

Practical implications

The results reported present research scholars and professional practitioners with an overview of the drivers of teamwork that could be implemented in the construction industry to streamline potential implementations and improve safety performance of construction workers.

Originality/value

A list of teamwork drivers has been developed to ratify potential empirical research in the area of construction safety. The results would contribute to the existing but restricted understanding of drivers of teamwork in the construction industry.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 9 January 2024

Benjamin Boahene Akomah and Prasanna Venkatesan Ramani

This paper aims to identify the unidimensionality and reliability of 84 factors that influence the performance of construction projects and develop a confirmatory factor analysis…

Abstract

Purpose

This paper aims to identify the unidimensionality and reliability of 84 factors that influence the performance of construction projects and develop a confirmatory factor analysis (CFA) model.

Design/methodology/approach

The study adopted a deductive research approach and started by identifying the positive factors that influence construction project performance. This was followed by the modification of the identified factors. After that, a questionnaire was developed out of the factors for data collection. Exploratory factor analysis was used to establish the factor structure of the positive factors, and this was verified using CFA afterwards. A model fit analysis was performed to determine the goodness of fit of the hypothesised model, followed by the development of the confirmatory model.

Findings

The study demonstrated substantial correlation in the data, sufficient unidimensionality and internal reliability. In addition, the estimated fit indices suggested that the postulated model adequately described the sample data.

Practical implications

The paper revealed that performance can be enhanced if stakeholders identify and leverage the positive factors influencing performance. The paper suggests that project stakeholders, particularly government, project owners, consultants and construction firms, can improve project performance by critically examining economic and financial systems (EFS), regulation and policy-making systems (RPS), effective management practices (EMP) and project implementation strategies (PIS).

Originality/value

The contribution of this paper to the present literature is identifying the positive factors and developing the confirmatory factor model. The model comprised 42 positive variables under four indicators: EMP, RPS, PIS and EFS.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 9 July 2024

Peter Dodzi Kwasi Agbaxode, Ehsan Saghatforoush, Sitsabo Dlamini and John Kwesi Korsah

The purpose of this study was to identify specific enablers intrinsic to integrated project delivery (IPD) that can be adapted into the conventional project delivery (CPD…

Abstract

Purpose

The purpose of this study was to identify specific enablers intrinsic to integrated project delivery (IPD) that can be adapted into the conventional project delivery (CPD) approach to enhance the quality of design documentation produced under the CPD within the Ghanaian construction industry.

Design/methodology/approach

The study employed questionnaires and semi-structured interviews for data collection. The sample size was 235 responses for questionnaires while 15 participants were interviewed. The survey instrument was piloted with industry professionals to ensure validity. IBM SPSS was used to analyze quantitative data by determining frequencies, percentages, correlation and regression, while content analysis was used on qualitative data with the aid of QSR Nvivo software.

Findings

Key findings include the need to adapt the early involvement of key participants for collaborative design input, tie individual success to overall project success with incentives and establish shared accountability for design errors and encourage open communication.

Practical implications

Adapting IPD enablers into the CPD approach would ensure higher-quality design documentation and more efficient project delivery. This has the potential to improve project outcomes, reduce errors, and foster better collaboration among stakeholders.

Originality/value

This study is the first of its kind to identify specific enablers inherent in IPD that can be adapted into the CPD approach to improve the quality of design documentation within the Ghanaian construction industry.

Details

Built Environment Project and Asset Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-124X

Keywords

1 – 10 of 25