Search results

1 – 10 of 13
Open Access
Article
Publication date: 20 October 2023

Usman Musa, Mastura Jaafar and Faraziera Mohd Raslim

This study attempts to examine the factors that influence user intention to adopt e-procurement in the Nigerian public sector.

1585

Abstract

Purpose

This study attempts to examine the factors that influence user intention to adopt e-procurement in the Nigerian public sector.

Design/methodology/approach

A well-structured questionnaire was used to collect primary data from 278 procurement and information technology (IT) departments’ officials of key federal government ministries and agencies. The technology acceptance model (TAM) model was adopted and extended with security-related factors, namely perceived trust and perceived security. A partial least squares-structural equation modelling (PLS-SEM) approach was used to test and validate the model.

Findings

The results indicated that perceived usefulness is the best predictor of users’ intention to adopt e-procurement, followed by perceived security and perceived trust. In contrast, however, perceived ease of use was found to have a significant negative effect on the intention to adopt e-procurement.

Originality/value

This study is among the first in the Nigerian public sector context to evaluate users’ perceptions on e-procurement adoption with the use of a distinctive research model (TAM). The study's findings contribute to a better understanding of the factors influencing the adoption of e-procurement in the Nigerian public sector.

Details

Arab Gulf Journal of Scientific Research, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1985-9899

Keywords

Article
Publication date: 5 May 2023

Godwin Musah, Daniel Domeher and Abubakar Musah

This paper aims to investigate the effect of presidential elections on stock return volatility in five leading stock markets in sub-Saharan Africa.

Abstract

Purpose

This paper aims to investigate the effect of presidential elections on stock return volatility in five leading stock markets in sub-Saharan Africa.

Design/methodology/approach

This paper uses various criteria to select an appropriate generalized autoregressive conditional heteroscedasticity model to estimate the second moment of the return distribution with the inclusion of pre- and post-presidential election dummy variables that capture the effect of presidential elections on stock market volatility.

Findings

The empirical results show that high pre-election uncertainty increases volatility in the Nairobi Stock Exchange, Stock Exchange of Mauritius and the Nigeria Stock Exchange. Furthermore, the results show that volatility in stock return is reduced 90 days after an election in Nigeria and South Africa but increases 90 days after elections in Ghana.

Originality/value

Contrary to the previous studies that are conducted in a single country with focus on specific elections, this paper provides a comparative analysis of presidential elections and stock return volatility in five leading stock markets in sub-Saharan Africa.

Details

Journal of Financial Economic Policy, vol. 15 no. 3
Type: Research Article
ISSN: 1757-6385

Keywords

Open Access
Article
Publication date: 27 June 2023

Kabir Ibrahim, Fredrick Simpeh and Oluseyi Julius Adebowale

Technologies have had a positive impact on the construction industry. Technologies such as BIM, automation, augmented and virtual reality, Internet of Things and robotics have…

Abstract

Purpose

Technologies have had a positive impact on the construction industry. Technologies such as BIM, automation, augmented and virtual reality, Internet of Things and robotics have been adopted by construction firms to enhance productivity. However, not much research has been done on the awareness and adoption of wearable technologies for health and safety (H&S) management. This paper investigates the level of awareness and adoption of wearable technologies for H&S management in the Nigerian construction industry.

Design/methodology/approach

A quantitative research method was adopted for the study. An electronic questionnaire format was used as an instrument to collect the data. Both descriptive (mean score) and inferential statistics (Kruskal–Wallis test) were used to analyse the data.

Findings

The results indicate that organisations rarely use H&S wearable devices for H&S management although professionals within the construction industry are somewhat aware of the common H&S wearable devices. The findings further indicate that all 11 variables were perceived as “rarely adopted”, whereas 2 variables were perceived as “aware”, 3 variables as “slightly aware” and the remaining 6 variables as “somewhat aware”.

Research limitations/implications

Data were collected from only construction professionals working in government agencies, consultancy firms and grade D contracting firms in Lagos and Abuja. For a broader perspective, a study that expands the number of states and categories of construction firms is recommended.

Practical implications

The construction industry in Nigeria can use the recommendations to improve H&S management on site. Moreover, the recommendations can contribute to the development of policies to promote the adoption of wearable technologies in construction sites.

Originality/value

Research on wearable technologies, particularly in the Nigerian construction industry, is at the developing stage. With this article, the authors contribute to the body of knowledge in this area of research.

Details

Frontiers in Engineering and Built Environment, vol. 4 no. 1
Type: Research Article
ISSN: 2634-2499

Keywords

Article
Publication date: 20 March 2023

Haruna Sa'idu Lawal, Hassan Adaviriku Ahmadu, Muhammad Abdullahi, Muhammad Aliyu Yamusa and Mustapha Abdulrazaq

This study aims to develop a building renovation duration prediction model incorporating both scope and non-scope factors.

Abstract

Purpose

This study aims to develop a building renovation duration prediction model incorporating both scope and non-scope factors.

Design/methodology/approach

The study used a questionnaire to obtain basic information relating to identified project scope factors as well as information relating to the impact of the non-scope factors on the duration of building renovation projects. The study retrieved 121 completed questionnaires from construction firms on tertiary education trust fund (TETFund) building renovation projects. Artificial neural network was then used to develop the model using 90% of the data, while mean absolute percentage error was used to validate the model using the remaining 10% of the data.

Findings

Two artificial neural network models were developed – a multilayer perceptron (MLP) and a radial basis function (RBF) model. The accuracy of the models was 86% and 80%, respectively. The developed models’ predictions were not statistically different from those of actual duration estimates with less than 20% error margin. Also, the study found that MLP models are more accurate than RBF models.

Research limitations/implications

The developed models are only applicable to projects that suit the characteristics and nature of the data used to develop the models. Hence, models can only predict the duration of building renovation projects.

Practical implications

The developed models are expected to serve as a tool for realistic estimation of the duration of building renovation projects and thus, help construction project managers to effectively plan and manage it.

Social implications

The developed models are expected to serve as a tool for realistic estimation of the duration of building renovation projects and thus, help construction project managers to effectively plan and manage it; it also helps clients to effectively benchmark projects duration and contractors to accurately estimate duration at tendering stage.

Originality/value

The study presents models that combine both scope and non-scope factors in predicting the duration of building renovation projects so as to ensure more realistic predictions.

Details

Journal of Financial Management of Property and Construction , vol. 28 no. 3
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 6 September 2022

Abdullahi B. Saka, Daniel W.M. Chan and Saheed O. Ajayi

Although there has been a surge in the adoption of building information modelling (BIM) in the construction industry, the small and medium-sized enterprises (SMEs) are still…

Abstract

Purpose

Although there has been a surge in the adoption of building information modelling (BIM) in the construction industry, the small and medium-sized enterprises (SMEs) are still struggling and perceive its adoption as risky. The SMEs in developing economies are especially on the disadvantaged side of the digital divide. Extant studies have focused on large firms and there are scanty studies on the influence of the external environments on BIM adoption in SMEs. Thus, this study espouses institutional theory (INT) to examine the influence of coercive, mimetic, and normative pressures on BIM awareness and adoption in SMEs.

Design/methodology/approach

A quantitative approach was employed, and data were collected from the Nigerian construction SMEs via an empirical questionnaire survey using a sequential stratified and convenient sampling method. Hypothesized relationships between the coercive, mimetic, and normative pressure and BIM in SMEs were empirically tested using the partial least squares structural equation modelling (PLS-SEM) technique and the model was validated with the “PLSpredict” procedure.

Findings

The results revealed that coercive and mimetic pressures significantly influence BIM adoption in SMEs while normative pressures have the strongest influence on BIM in SMEs. Also, BIM awareness is an important predictor of BIM adoption. The findings also shed light on the influence of firmographics on BIM awareness and adoption in Nigerian SMEs.

Originality/value

The study empirically validates the applicability of INT and highlights that BIM adoption is not only influenced by internal responses to the need for efficiency but also by external pressures. It implies a clear need for intentional isomorphic pressures in driving BIM adoption in SMEs. The study employs the INT to explain a phenomenon that has not been theoretically explored in the context of SMEs in developing economies. Lastly, the study provided valuable insights into driving BIM adoption, together with the effective practical implications for implementation and potential research areas for further studies.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 29 October 2021

Abdullahi Babatunde Saka and Daniel W.M. Chan

Building information modelling (BIM) research studies are highly contextual as the contexts provide lenses for interpreting the results. However, there has been a growing…

Abstract

Purpose

Building information modelling (BIM) research studies are highly contextual as the contexts provide lenses for interpreting the results. However, there has been a growing decontextualization in extant studies especially between the small and medium-sized enterprises (SMEs) and large firms; and between developed and developing countries. Albeit these contexts are all in the same construction industry, they often react differently to the same conditions. Thus, this study aims to evaluate the perceptions of firms in varying contexts of size and location on the perceived barriers to the implementation of BIM in the architecture, engineering and construction (AEC) industry.

Design/methodology/approach

The perceptions of 228 firms gleaned from 26 countries across the 6 continents were collated via an international empirical questionnaire survey. The data was analysed using the mean score, rank agreement analysis, Mann-Whitney U test and factor analysis.

Findings

The findings revealed the major factors impending BIM implementation in each of the contexts and a comparative analysis emphasized the difference in their perceptions. The findings underscore that there is a general digital divide as regard BIM implementation between the SMEs and large firms, and a deepening divide between the developed and developing countries.

Originality/value

The study has provided empirical evidence for the BIM divide in the AEC industry, which would influence the promulgation of BIM policy and transferability of best practices across varying contexts of both firm size and country level.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 5
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 12 October 2022

Thi-Thao-Nguyen Nguyen, Sy Tien Do, Viet Thanh Nguyen and Thu Anh Nguyen

This study aims to identify the enabling factors for Building Information Modeling (BIM) adoption in Vietnamese construction enterprises and uncover their interrelationships. This…

589

Abstract

Purpose

This study aims to identify the enabling factors for Building Information Modeling (BIM) adoption in Vietnamese construction enterprises and uncover their interrelationships. This will help stakeholders focus on controlling and allocating resources (time, personnel, and costs) appropriately to adopt BIM and differentiate themselves from fierce competition in the architectural, engineering, construction and operations (AECO) industry.

Design/methodology/approach

This study first identifies and evaluates 32 enabling factors for applying BIM in the Vietnamese construction industry according to the TOE extended framework. Afterwards, a hybrid questionnaire survey using a convenient sampling method is conducted to capture stakeholders' views. The exploratory factor analysis (EFA) and the partial least squares structural equation modelling (PLS-SEM) technique are then applied to identify the constructs of the enabling factors and their interrelationships.

Findings

The study extracts six constructs that could have a significant impact on the adoption of BIM in construction enterprises, namely: technical feasibility (TF), human resources and management (HRM), company business vision (CBV), political environment (PE), economic viability (EV), and legal aspects (LA). Based on eleven proposed hypotheses, the analysis results confirm nine hypotheses and show that the HRM, TF, and CBV have the strongest effects on managers in evaluating the factors for BIM.

Originality/value

The results of the study fill the gap in knowledge by discovering the interrelationships among the enabling factors for BIM adoption in construction enterprises. The results might support the construction enterprises and their stakeholders in increasing the application of BIM, and digital transformation in construction industry.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 26 March 2024

Andrew Ebekozien, Clinton Aigbavboa, Mohamad Shaharudin Samsurijan, Noor Alyani Nor Azazi and Okechukwu Dominic Saviour Duru

Studies show that building information modelling (BIM) technology can improve construction productivity regarding the design, construction and maintenance of a project life cycle…

Abstract

Purpose

Studies show that building information modelling (BIM) technology can improve construction productivity regarding the design, construction and maintenance of a project life cycle in the 21st century. Revit has been identified as a frequently used tool for delivering BIM in the built environment. Studies about BIM technology via Revit are scarce in training middle-level workforce higher education institutions. Thus, this study aims to investigate the relevance of BIM technology and offer measures to promote digitalisation in Nigeria’s built environment polytechnic undergraduates via Revit.

Design/methodology/approach

Given the unexplored nature of training the middle-level workforce in Nigeria, 37 semi-structured virtual interviews were conducted across Nigeria, and saturation was achieved. The participants were knowledgeable about construction-related BIM. The researchers used a thematic analysis for the collected data and honed them with secondary sources.

Findings

Improved visualisation of design, effective and efficient work productivity, automatic design and quantification, improved database management and collaboration and data storage in the centrally coordinated model, among others, emerged as BIM’s benefits. BIM technology via Revit is challenging, especially in Nigeria’s polytechnic education curriculum. The 24 perceived issues were grouped into government/regulatory agencies-related, polytechnic management-related and polytechnic undergraduate students-related hindrances in Nigeria’s built environment.

Research limitations/implications

This study is limited to BIM implications for Nigeria’s built environment polytechnic undergraduates.

Originality/value

This study contributes to the literature paucity in attempting to uncover perceived issues hindering the implementation of BIM technology via Revit in training Nigeria’s built environment polytechnic undergraduates via a qualitative approach.

Open Access
Article
Publication date: 19 January 2024

Ummi Ibrahim Atah, Mustafa Omar Mohammed, Abideen Adewale Adeyemi and Engku Rabiah Adawiah

The purpose of this paper is to propose a model that will demonstrate how the integration of Salam (exclusive agricultural commodity trade) with Takaful (micro-Takaful – a…

Abstract

Purpose

The purpose of this paper is to propose a model that will demonstrate how the integration of Salam (exclusive agricultural commodity trade) with Takaful (micro-Takaful – a subdivision of Islamic insurance) and value chain can address major challenges facing the agricultural sector in Kano State, Nigeria.

Design/methodology/approach

The study conducted a thorough and critical analysis of relevant literature and existing models of financing agriculture in Nigeria to come up with the proposed model.

Findings

The findings indicate that measures undertaken to address the major challenges fail. In view of this, this study proposed Bay-Salam with Takaful and value chain model to solve a number of challenges such as poor access to financing, poor marketing and pricing, delay, collateral requirement and risk issues in order to avail farmers with easy access to finance and provide effective security to financial institutions.

Research limitations/implications

The paper is limited to using secondary data. Therefore, empirical investigation can be carried out to strengthen the validation of the model.

Practical implications

The study outcome seeks to improve the productivity of the farmers through enhancing their access to finance. This will increase their level of production and provide more employment opportunities. In addition, it will boost financial inclusion, income generation, poverty alleviation, standard of living, food security and overall economic growth and development.

Originality/value

The novelty of this study lies in the integration of classical Bay-Salam with Takaful and value chain and create a unique model structure which the researchers do not come across in any research that presented it in Nigeria.

Details

Islamic Economic Studies, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1319-1616

Keywords

Article
Publication date: 3 November 2021

Richard Ohene Asiedu, Patrick Manu, Abdul-Majeed Mahamadu, Colin Anthony Booth, Paul Olomolaiye, Kofi Agyekum and Mohamed Abadi

Effective procurement of infrastructure is partly dependent on infrastructure procurement personnel having the skills that are important for the discharge of their role…

Abstract

Purpose

Effective procurement of infrastructure is partly dependent on infrastructure procurement personnel having the skills that are important for the discharge of their role. Addressing the infrastructure deficits in developing countries, therefore, calls for an understanding of the skills that are important for the discharge of the roles of public personnel that are involved in infrastructure procurement. This study aims to investigate these skills from the perspective of public infrastructure procurement personnel in the sub-Saharan African region.

Design/methodology/approach

A questionnaire survey of procurement personnel yielded 590 useable responses, which were analysed using t-tests and exploratory factor analysis (EFA).

Findings

EFA established eight key components of important infrastructure procurement skills to include skills related to: project success factors; social and environmental sustainability; marketing and e-procurement; project phase management, the application of procurement laws and procedures; soft skills, ICT and communication; and data analysis and team building.

Originality/value

The findings are crucial in developing infrastructure procurement capacity building programmes that would be appropriate for infrastructure procurement personnel in developing country contexts. Infrastructure procurement personnel ought to engage more in capacity development training that is aligned to enhancing skills within the eight components.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 6
Type: Research Article
ISSN: 1726-0531

Keywords

1 – 10 of 13