Search results

1 – 4 of 4
Article
Publication date: 17 May 2024

Ali M. Saad, Hasan D. Badran, Saheed Ajayi and Saad Sarhan

The construction industry has embraced building information modelling (BIM) as a practical methodology towards digitalisation. However, critics believe BIM has reached a plateau…

Abstract

Purpose

The construction industry has embraced building information modelling (BIM) as a practical methodology towards digitalisation. However, critics believe BIM has reached a plateau in addressing distinctive construction challenges. As a result, literature has seen an increase in the development and use of BIM-based plugins. Overall, the plugins have been critical in delivering custom-built solutions to longstanding construction challenges. The purpose of this study is to empirically investigate this trend and the potential barriers undermining the wider development of BIM plugins, by that contributing to a stimulating research topic and a growing knowledge gap.

Design/methodology/approach

Methodologically, this study used a quantitative approach to collect data through a carefully designed questionnaire. This study achieved a sample size of 39 experts who have been involved in developing, experimenting and publishing BIM-based plugins for specific construction activities.

Findings

The findings led to the identification of the key barriers to using BIM-based plugins and the identification of the key strategies to overcome them across the three situational awareness (SA) phases. Results also suggest that the development and use of plugins are destined to increase, and the research community can now rely on the insights of this paper as a departure point to address the technological plateau in BIM-related research.

Originality/value

To the best of the authors’ knowledge, this is the first study to empirically identify and assess the barriers undermining the wider development of BIM-based plugins. This study contributes to theory by building on SA, by challenging existing wisdom and fostering new knowledge around strategies to overcome the evaluated barriers.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 6 September 2022

Abdullahi B. Saka, Daniel W.M. Chan and Saheed O. Ajayi

Although there has been a surge in the adoption of building information modelling (BIM) in the construction industry, the small and medium-sized enterprises (SMEs) are still…

Abstract

Purpose

Although there has been a surge in the adoption of building information modelling (BIM) in the construction industry, the small and medium-sized enterprises (SMEs) are still struggling and perceive its adoption as risky. The SMEs in developing economies are especially on the disadvantaged side of the digital divide. Extant studies have focused on large firms and there are scanty studies on the influence of the external environments on BIM adoption in SMEs. Thus, this study espouses institutional theory (INT) to examine the influence of coercive, mimetic, and normative pressures on BIM awareness and adoption in SMEs.

Design/methodology/approach

A quantitative approach was employed, and data were collected from the Nigerian construction SMEs via an empirical questionnaire survey using a sequential stratified and convenient sampling method. Hypothesized relationships between the coercive, mimetic, and normative pressure and BIM in SMEs were empirically tested using the partial least squares structural equation modelling (PLS-SEM) technique and the model was validated with the “PLSpredict” procedure.

Findings

The results revealed that coercive and mimetic pressures significantly influence BIM adoption in SMEs while normative pressures have the strongest influence on BIM in SMEs. Also, BIM awareness is an important predictor of BIM adoption. The findings also shed light on the influence of firmographics on BIM awareness and adoption in Nigerian SMEs.

Originality/value

The study empirically validates the applicability of INT and highlights that BIM adoption is not only influenced by internal responses to the need for efficiency but also by external pressures. It implies a clear need for intentional isomorphic pressures in driving BIM adoption in SMEs. The study employs the INT to explain a phenomenon that has not been theoretically explored in the context of SMEs in developing economies. Lastly, the study provided valuable insights into driving BIM adoption, together with the effective practical implications for implementation and potential research areas for further studies.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 26 March 2024

Andrew Ebekozien, Clinton Aigbavboa, Mohamad Shaharudin Samsurijan, Noor Alyani Nor Azazi and Okechukwu Dominic Saviour Duru

Studies show that building information modelling (BIM) technology can improve construction productivity regarding the design, construction and maintenance of a project life cycle…

Abstract

Purpose

Studies show that building information modelling (BIM) technology can improve construction productivity regarding the design, construction and maintenance of a project life cycle in the 21st century. Revit has been identified as a frequently used tool for delivering BIM in the built environment. Studies about BIM technology via Revit are scarce in training middle-level workforce higher education institutions. Thus, this study aims to investigate the relevance of BIM technology and offer measures to promote digitalisation in Nigeria’s built environment polytechnic undergraduates via Revit.

Design/methodology/approach

Given the unexplored nature of training the middle-level workforce in Nigeria, 37 semi-structured virtual interviews were conducted across Nigeria, and saturation was achieved. The participants were knowledgeable about construction-related BIM. The researchers used a thematic analysis for the collected data and honed them with secondary sources.

Findings

Improved visualisation of design, effective and efficient work productivity, automatic design and quantification, improved database management and collaboration and data storage in the centrally coordinated model, among others, emerged as BIM’s benefits. BIM technology via Revit is challenging, especially in Nigeria’s polytechnic education curriculum. The 24 perceived issues were grouped into government/regulatory agencies-related, polytechnic management-related and polytechnic undergraduate students-related hindrances in Nigeria’s built environment.

Research limitations/implications

This study is limited to BIM implications for Nigeria’s built environment polytechnic undergraduates.

Originality/value

This study contributes to the literature paucity in attempting to uncover perceived issues hindering the implementation of BIM technology via Revit in training Nigeria’s built environment polytechnic undergraduates via a qualitative approach.

Article
Publication date: 11 October 2022

Onaopepo Adeniyi, Niraj Thurairajah and Feyisetan Leo-Olagbaye

Practitioners have reported a minimal and non-use of building information modelling (BIM), especially in small and medium-sized organisations and BIM infant construction…

Abstract

Purpose

Practitioners have reported a minimal and non-use of building information modelling (BIM), especially in small and medium-sized organisations and BIM infant construction industries. This development calls for a reappraisal of organisations’ strength in capabilities required for BIM uptake towards the target of global construction digitalisation. This study aims to assess the BIM Level 2 uptake capability of organisations in a BIM infant construction industry and identify the underlying interactions between the capability criteria.

Design/methodology/approach

The study used a multivariable analysis of fifteen descriptors identified from the people, process, policy, finance and technology domain. Data collection was done in the BIM infant construction industry in Nigeria. Verification of the descriptors and an evaluation of BIM uptake capability in organisations was done. Seventy-three responses were received within the selected context, and data analysis was done with mean weighting and exploratory factor analysis. Maximum Likelihood extraction and Direct Oblimin rotation were used.

Findings

Factor analysis revealed three factors that explained 53.28% of the total variance in the BIM Level 2 uptake capability of construction organisations. The factors are workforce capacity and continuous development, an affinity for innovation and strength in physical and operational facilities.

Research limitations/implications

This study provides an overarching and insightful discussion on BIM uptake capability and construction digitalisation with evidence from a BIM-infant construction industry.

Practical implications

The findings of this study are a piece of valuable empirical evidence on Level 2 BIM uptake capability. This empirical situation analysis will inform the advocacy for the advancement of BIM and enhanced utilisation of building information. Evidence on the capability performance of the BIM infant industry has been revealed.

Originality/value

The outcome is expected to stir debate on the preparedness of organisations to further exploit the benefits of BIM in the BIM infant construction industry. Examination of the capability for a particular phase of BIM is scanty in the literature.

Details

Construction Innovation , vol. 24 no. 2
Type: Research Article
ISSN: 1471-4175

Keywords

1 – 4 of 4