1 – 3 of 3Biyanka Ekanayake, Alireza Ahmadian Fard Fini, Johnny Kwok Wai Wong and Peter Smith
Recognising the as-built state of construction elements is crucial for construction progress monitoring. Construction scholars have used computer vision-based algorithms to…
Abstract
Purpose
Recognising the as-built state of construction elements is crucial for construction progress monitoring. Construction scholars have used computer vision-based algorithms to automate this process. Robust object recognition from indoor site images has been inhibited by technical challenges related to indoor objects, lighting conditions and camera positioning. Compared with traditional machine learning algorithms, one-stage detector deep learning (DL) algorithms can prioritise the inference speed, enable real-time accurate object detection and classification. This study aims to present a DL-based approach to facilitate the as-built state recognition of indoor construction works.
Design/methodology/approach
The one-stage DL-based approach was built upon YOLO version 4 (YOLOv4) algorithm using transfer learning with few hyperparameters customised and trained in the Google Colab virtual machine. The process of framing, insulation and drywall installation of indoor partitions was selected as the as-built scenario. For training, images were captured from two indoor sites with publicly available online images.
Findings
The DL model reported a best-trained weight with a mean average precision of 92% and an average loss of 0.83. Compared to previous studies, the automation level of this study is high due to the use of fixed time-lapse cameras for data collection and zero manual intervention from the pre-processing algorithms to enhance visual quality of indoor images.
Originality/value
This study extends the application of DL models for recognising as-built state of indoor construction works upon providing training images. Presenting a workflow on training DL models in a virtual machine platform by reducing the computational complexities associated with DL models is also materialised.
Details
Keywords
Muneeb Afzal, Johnny Kwok Wai Wong and Alireza Ahmadian Fard Fini
Request for information (RFI) documents play a pivotal role in seeking clarifications in construction projects. However, perceived as inevitable “non-value adding” tasks, they…
Abstract
Purpose
Request for information (RFI) documents play a pivotal role in seeking clarifications in construction projects. However, perceived as inevitable “non-value adding” tasks, they harbour risks like schedule delays and increased project costs, underlining the importance of strategic RFI management in construction projects. Despite this, a lack of literature dissecting RFI processes impedes a full understanding of their intricacies and impacts. This study aims to bridge the gap through a comprehensive literature review, delving into RFI intricacies and implications, while emphasising the necessity for strategic RFI management to prevent project risks.
Design/methodology/approach
This research study systematically reviews RFI-related papers published between 2000 and 2023. Accordingly, the review discusses key themes related to RFI management, yielding best practices for industry stakeholders and highlighting research directions and gaps in the body of knowledge.
Findings
Present RFI management platforms exhibit deficiencies and lack analytics essential for streamlined RFI processing. Complications arise in building information modelling (BIM)-enabled projects due to software disparities and interoperability hurdles. The existing body of knowledge heavily relies on manual content analysis, an impractical approach for the construction industry. The proposed research direction involves automated comprehension of unstructured RFI content using advanced text mining and natural language processing techniques, with the potential to greatly elevate the efficiency of RFI processing.
Originality/value
The study extends the RFI literature by providing novel insights into the problemetisation with the RFI process, offering a holistic understanding and best practices to minimise adverse effects. Additionally, the paper synthesises RFI processes in traditional and BIM-enabled project settings, maps a causal-loop diagram to identify associated issues and summarises approaches for extracting knowledge from the unstructured content of RFIs. The outcomes of this review stand to offer invaluable insights to both industry practitioners and researchers, enabling and promoting the refinement of RFI processes within the construction domain.
Details
Keywords
Johnny Kwok Wai Wong, Mojtaba Maghrebi, Alireza Ahmadian Fard Fini, Mohammad Amin Alizadeh Golestani, Mahdi Ahmadnia and Michael Er
Images taken from construction site interiors often suffer from low illumination and poor natural colors, which restrict their application for high-level site management purposes…
Abstract
Purpose
Images taken from construction site interiors often suffer from low illumination and poor natural colors, which restrict their application for high-level site management purposes. The state-of-the-art low-light image enhancement method provides promising image enhancement results. However, they generally require a longer execution time to complete the enhancement. This study aims to develop a refined image enhancement approach to improve execution efficiency and performance accuracy.
Design/methodology/approach
To develop the refined illumination enhancement algorithm named enhanced illumination quality (EIQ), a quadratic expression was first added to the initial illumination map. Subsequently, an adjusted weight matrix was added to improve the smoothness of the illumination map. A coordinated descent optimization algorithm was then applied to minimize the processing time. Gamma correction was also applied to further enhance the illumination map. Finally, a frame comparing and averaging method was used to identify interior site progress.
Findings
The proposed refined approach took around 4.36–4.52 s to achieve the expected results while outperforming the current low-light image enhancement method. EIQ demonstrated a lower lightness-order error and provided higher object resolution in enhanced images. EIQ also has a higher structural similarity index and peak-signal-to-noise ratio, which indicated better image reconstruction performance.
Originality/value
The proposed approach provides an alternative to shorten the execution time, improve equalization of the illumination map and provide a better image reconstruction. The approach could be applied to low-light video enhancement tasks and other dark or poor jobsite images for object detection processes.
Details