Search results

1 – 9 of 9
Article
Publication date: 1 February 2024

Hakeem A. Owolabi, Azeez A. Oyedele, Lukumon Oyedele, Hafiz Alaka, Oladimeji Olawale, Oluseyi Aju, Lukman Akanbi and Sikiru Ganiyu

Despite an enormous body of literature on conflict management, intra-group conflicts vis-à-vis team performance, there is currently no study investigating the conflict prevention…

Abstract

Purpose

Despite an enormous body of literature on conflict management, intra-group conflicts vis-à-vis team performance, there is currently no study investigating the conflict prevention approach to handling innovation-induced conflicts that may hinder smooth implementation of big data technology in project teams.

Design/methodology/approach

This study uses constructs from conflict theory, and team power relations to develop an explanatory framework. The study proceeded to formulate theoretical hypotheses from task-conflict, process-conflict, relationship and team power conflict. The hypotheses were tested using Partial Least Square Structural Equation Model (PLS-SEM) to understand key preventive measures that can encourage conflict prevention in project teams when implementing big data technology.

Findings

Results from the structural model validated six out of seven theoretical hypotheses and identified Relationship Conflict Prevention as the most important factor for promoting smooth implementation of Big Data Analytics technology in project teams. This is followed by power-conflict prevention, prevention of task disputes and prevention of Process conflicts respectively. Results also show that relationship and power conflicts interact on the one hand, while task and relationship conflict prevention also interact on the other hand, thus, suggesting the prevention of one of the conflicts could minimise the outbreak of the other.

Research limitations/implications

The study has been conducted within the context of big data adoption in a project-based work environment and the need to prevent innovation-induced conflicts in teams. Similarly, the research participants examined are stakeholders within UK projected-based organisations.

Practical implications

The study urges organisations wishing to embrace big data innovation to evolve a multipronged approach for facilitating smooth implementation through prevention of conflicts among project frontlines. This study urges organisations to anticipate both subtle and overt frictions that can undermine relationships and team dynamics, effective task performance, derail processes and create unhealthy rivalry that undermines cooperation and collaboration in the team.

Social implications

The study also addresses the uncertainty and disruption that big data technology presents to employees in teams and explore conflict prevention measure which can be used to mitigate such in project teams.

Originality/value

The study proposes a Structural Model for establishing conflict prevention strategies in project teams through a multidimensional framework that combines constructs like team power conflict, process, relationship and task conflicts; to encourage Big Data implementation.

Details

Information Technology & People, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0959-3845

Keywords

Article
Publication date: 12 August 2022

Muhammad Azeem Abbas, Saheed O. Ajayi, Adekunle Sabitu Oyegoke and Hafiz Alaka

Master information delivery plan (MIDP) is a key requirement for building information modelling (BIM) execution plan (BEP) that enlists all information deliverables in BIM-based…

2654

Abstract

Purpose

Master information delivery plan (MIDP) is a key requirement for building information modelling (BIM) execution plan (BEP) that enlists all information deliverables in BIM-based project, containing information about what would be prepared, when, by who, as well as the procedures and protocols to be used. In a well-conceived BEP, the MIDP facilitates collaboration among stakeholders. However, current approaches to generating MIDP are manual, making it tedious, error-prone and inconsistent, thereby limiting some expected benefits of BIM implementation. The purpose of this study is to automate the MIDP and demonstrate a collaborative BIM system that overcomes the problems associated with the traditional approach.

Design/methodology/approach

A BIM cloud-based system (named Auto-BIMApp) involving naming that automated MIDP generation is presented. A participatory action research methodology involving academia and industry stakeholders is followed to design and validate the Auto-BIMApp.

Findings

A mixed-method experiment is conducted to compare the proposed automated generation of MIDP using Auto-BIMApp with the traditional practice of using spreadsheets. The quantitative results show over 500% increased work efficiency, with improved and error-free collaboration among team members through Auto-BIMApp. Moreover, the responses from the participants using Auto-BIMApp during the experiment shows positive feedback in term of ease of use and automated functionalities of the Auto-BIMApp.

Originality/value

The replacement of traditional practices to a complete automated collaborative system for the generation of MIDP, with substantial productivity improvement, brings novelty to the present research. The Auto-BIMApp involve multidimensional information, multiple platforms, multiple types and levels of users, and generates three different representations of MIDP.

Article
Publication date: 26 September 2022

Christian Nnaemeka Egwim, Hafiz Alaka, Oluwapelumi Oluwaseun Egunjobi, Alvaro Gomes and Iosif Mporas

This study aims to compare and evaluate the application of commonly used machine learning (ML) algorithms used to develop models for assessing energy efficiency of buildings.

Abstract

Purpose

This study aims to compare and evaluate the application of commonly used machine learning (ML) algorithms used to develop models for assessing energy efficiency of buildings.

Design/methodology/approach

This study foremostly combined building energy efficiency ratings from several data sources and used them to create predictive models using a variety of ML methods. Secondly, to test the hypothesis of ensemble techniques, this study designed a hybrid stacking ensemble approach based on the best performing bagging and boosting ensemble methods generated from its predictive analytics.

Findings

Based on performance evaluation metrics scores, the extra trees model was shown to be the best predictive model. More importantly, this study demonstrated that the cumulative result of ensemble ML algorithms is usually always better in terms of predicted accuracy than a single method. Finally, it was discovered that stacking is a superior ensemble approach for analysing building energy efficiency than bagging and boosting.

Research limitations/implications

While the proposed contemporary method of analysis is assumed to be applicable in assessing energy efficiency of buildings within the sector, the unique data transformation used in this study may not, as typical of any data driven model, be transferable to the data from other regions other than the UK.

Practical implications

This study aids in the initial selection of appropriate and high-performing ML algorithms for future analysis. This study also assists building managers, residents, government agencies and other stakeholders in better understanding contributing factors and making better decisions about building energy performance. Furthermore, this study will assist the general public in proactively identifying buildings with high energy demands, potentially lowering energy costs by promoting avoidance behaviour and assisting government agencies in making informed decisions about energy tariffs when this novel model is integrated into an energy monitoring system.

Originality/value

This study fills a gap in the lack of a reason for selecting appropriate ML algorithms for assessing building energy efficiency. More importantly, this study demonstrated that the cumulative result of ensemble ML algorithms is usually always better in terms of predicted accuracy than a single method.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 4
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 22 December 2022

Saheed O. Ajayi, Natasha Lister, Jamiu Adetayo Dauda, Adekunle Oyegoke and Hafiz Alaka

Health and safety is an important issue in workplaces, and despite safety procedures becoming more strict, serious accidents are still happening within the UK construction sector…

Abstract

Purpose

Health and safety is an important issue in workplaces, and despite safety procedures becoming more strict, serious accidents are still happening within the UK construction sector. This demonstrates poor performance in the implementation of safety procedures on construction sites. One of the key challenges is the unwillingness of the site workforce, especially the subcontracted operatives, to adhere to safety provisions on construction sites. As such, this study investigates the strategies for enhancing safe behaviour amongst subcontracted operatives in the UK construction industry.

Design/methodology/approach

The study used exploratory sequential mixed method research, involving interviews and questionnaires as means of data collection, and thematic analysis, reliability analysis and exploratory factor analysis as methods of data analysis.

Findings

The study suggests that various carrot and stick measures are expected to be put in place as part of the strategies for enhancing safe behaviour amongst subcontracted operatives. These include adequate enforcement of safety practices by the management, operative engagement and motivation, commendation and rewards, site safety targets, leadership style and motivation.

Originality/value

Application of the suggested measures could enhance safety on construction sites, as it provides practical measures and solutions for inculcating safety behaviours amongst the site operatives who are most likely to be the victims of site accidents.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 May 2022

Ismail Abiodun Sulaimon, Hafiz Alaka, Razak Olu-Ajayi, Mubashir Ahmad, Saheed Ajayi and Abdul Hye

Road traffic emissions are generally believed to contribute immensely to air pollution, but the effect of road traffic data sets on air quality (AQ) predictions has not been fully…

282

Abstract

Purpose

Road traffic emissions are generally believed to contribute immensely to air pollution, but the effect of road traffic data sets on air quality (AQ) predictions has not been fully investigated. This paper aims to investigate the effects traffic data set have on the performance of machine learning (ML) predictive models in AQ prediction.

Design/methodology/approach

To achieve this, the authors have set up an experiment with the control data set having only the AQ data set and meteorological (Met) data set, while the experimental data set is made up of the AQ data set, Met data set and traffic data set. Several ML models (such as extra trees regressor, eXtreme gradient boosting regressor, random forest regressor, K-neighbors regressor and two others) were trained, tested and compared on these individual combinations of data sets to predict the volume of PM2.5, PM10, NO2 and O3 in the atmosphere at various times of the day.

Findings

The result obtained showed that various ML algorithms react differently to the traffic data set despite generally contributing to the performance improvement of all the ML algorithms considered in this study by at least 20% and an error reduction of at least 18.97%.

Research limitations/implications

This research is limited in terms of the study area, and the result cannot be generalized outside of the UK as some of the inherent conditions may not be similar elsewhere. Additionally, only the ML algorithms commonly used in literature are considered in this research, therefore, leaving out a few other ML algorithms.

Practical implications

This study reinforces the belief that the traffic data set has a significant effect on improving the performance of air pollution ML prediction models. Hence, there is an indication that ML algorithms behave differently when trained with a form of traffic data set in the development of an AQ prediction model. This implies that developers and researchers in AQ prediction need to identify the ML algorithms that behave in their best interest before implementation.

Originality/value

The result of this study will enable researchers to focus more on algorithms of benefit when using traffic data sets in AQ prediction.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 7 September 2021

Christian Nnaemeka Egwim, Hafiz Alaka, Luqman Olalekan Toriola-Coker, Habeeb Balogun, Saheed Ajayi and Raphael Oseghale

This paper aims to establish the most underlying factors causing construction projects delay from the most applicable.

Abstract

Purpose

This paper aims to establish the most underlying factors causing construction projects delay from the most applicable.

Design/methodology/approach

The paper conducted survey of experts using systematic review of vast body of literature which revealed 23 common factors affecting construction delay. Consequently, this study carried out reliability analysis, ranking using the significance index measurement of delay parameters (SIDP), correlation analysis and factor analysis. From the result of factor analysis, this study grouped a specific underlying factor into three of the six applicable factors that correlated strongly with construction project delay.

Findings

The paper finds all factors from the reliability test to be consistent. It suggests project quality control, project schedule/program of work, contractors’ financial difficulties, political influence, site conditions and price fluctuation to be the six most applicable factors for construction project delay, which are in the top 25% according to the SIDP score and at the same time are strongly associated with construction project delay.

Research limitations/implications

This paper is recommending that prospective research should use a qualitative and inductive approach to investigate whether any new, not previously identified, underlying factors that impact construction projects delay can be discovered as it followed an inductive research approach.

Practical implications

The paper includes implications for the policymakers in the construction industry in Nigeria to focus on measuring the key suppliers’ delivery performance as late delivery of materials by supplier can result in rescheduling of work activities and extra time or waiting time for construction workers as well as for the management team at site. Also, construction stakeholders in Nigeria are encouraged to leverage the amount of data produced from backlog of project schedules, as-built drawings and models, computer-aided designs (CAD), costs, invoices and employee details, among many others through the aid of state-of-the-art data driven technologies such as artificial intelligence or machine learning to make key business decisions that will help drive further profitability. Furthermore, this study suggests that these stakeholders use climatological data that can be obtained from weather observations to minimize impact of bad weather during construction.

Originality/value

This paper establishes the three underlying factors (late delivery of materials by supplier, poor decision-making and Inclement or bad weather) causing construction projects delay from the most applicable.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 5
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 2 June 2023

Oluwaseun Enoch Akindele, Saheed Ajayi, Luqman Toriola-Coker, Adekunle Sabitu Oyegoke, Hafiz Alaka and Sambo Lyson Zulu

Amidst all solutions posited to address sustainable construction practices in Nigeria, the implementation plans are repudiated by sustainable barriers. This study examines and…

Abstract

Purpose

Amidst all solutions posited to address sustainable construction practices in Nigeria, the implementation plans are repudiated by sustainable barriers. This study examines and confirms the strategy with the most significant impacts on the identified barrier to sustainable construction practice (SCP).

Design/methodology/approach

The study deployed a questionnaire survey to evaluate the perspective of 100 construction actors on the barriers and strategies of sustainable construction practice in Nigeria. Factor Analysis was employed to categorize key barriers and strategies into their underlying clusters for further analysis. Partial least squares-structural equation modelling (PLS-SEM) was used to confirm the construct's significant relationship and magnitude, thereby establishing the strategies with the highest impacts on the barriers to sustainable construction practices.

Findings

The findings revealed three clusters of barriers and four groups of strategies to SCP, including technopolitic barrier, perception and awareness barrier and sociocultural barrier. For the significant strategies, education and training, stakeholder regulation, incentive support and government and legislative support strategies were established. Overall, education and training strategy was identified as the most dominant and effective strategy to mitigate the barriers of SCP in Nigeria.

Originality/value

The paper establishes education and training as the key strategy to achieving sustainable quest in the AEC industry. The practical implication is that policymakers, educators and professional bodies can harness sustainable knowledge transfer through education and training to improve sustainable construction practices in Nigeria.

Details

Built Environment Project and Asset Management, vol. 13 no. 4
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 7 November 2023

Christian Nnaemeka Egwim, Hafiz Alaka, Youlu Pan, Habeeb Balogun, Saheed Ajayi, Abdul Hye and Oluwapelumi Oluwaseun Egunjobi

The study aims to develop a multilayer high-effective ensemble of ensembles predictive model (stacking ensemble) using several hyperparameter optimized ensemble machine learning…

77

Abstract

Purpose

The study aims to develop a multilayer high-effective ensemble of ensembles predictive model (stacking ensemble) using several hyperparameter optimized ensemble machine learning (ML) methods (bagging and boosting ensembles) trained with high-volume data points retrieved from Internet of Things (IoT) emission sensors, time-corresponding meteorology and traffic data.

Design/methodology/approach

For a start, the study experimented big data hypothesis theory by developing sample ensemble predictive models on different data sample sizes and compared their results. Second, it developed a standalone model and several bagging and boosting ensemble models and compared their results. Finally, it used the best performing bagging and boosting predictive models as input estimators to develop a novel multilayer high-effective stacking ensemble predictive model.

Findings

Results proved data size to be one of the main determinants to ensemble ML predictive power. Second, it proved that, as compared to using a single algorithm, the cumulative result from ensemble ML algorithms is usually always better in terms of predicted accuracy. Finally, it proved stacking ensemble to be a better model for predicting PM2.5 concentration level than bagging and boosting ensemble models.

Research limitations/implications

A limitation of this study is the trade-off between performance of this novel model and the computational time required to train it. Whether this gap can be closed remains an open research question. As a result, future research should attempt to close this gap. Also, future studies can integrate this novel model to a personal air quality messaging system to inform public of pollution levels and improve public access to air quality forecast.

Practical implications

The outcome of this study will aid the public to proactively identify highly polluted areas thus potentially reducing pollution-associated/ triggered COVID-19 (and other lung diseases) deaths/ complications/ transmission by encouraging avoidance behavior and support informed decision to lock down by government bodies when integrated into an air pollution monitoring system

Originality/value

This study fills a gap in literature by providing a justification for selecting appropriate ensemble ML algorithms for PM2.5 concentration level predictive modeling. Second, it contributes to the big data hypothesis theory, which suggests that data size is one of the most important factors of ML predictive capability. Third, it supports the premise that when using ensemble ML algorithms, the cumulative output is usually always better in terms of predicted accuracy than using a single algorithm. Finally developing a novel multilayer high-performant hyperparameter optimized ensemble of ensembles predictive model that can accurately predict PM2.5 concentration levels with improved model interpretability and enhanced generalizability, as well as the provision of a novel databank of historic pollution data from IoT emission sensors that can be purchased for research, consultancy and policymaking.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Abstract

Details

Built Environment Project and Asset Management, vol. 13 no. 4
Type: Research Article
ISSN: 2044-124X

1 – 9 of 9