Search results

1 – 8 of 8
Article
Publication date: 17 October 2022

Jiayue Zhao, Yunzhong Cao and Yuanzhi Xiang

The safety management of construction machines is of primary importance. Considering that traditional construction machine safety monitoring and evaluation methods cannot adapt to…

Abstract

Purpose

The safety management of construction machines is of primary importance. Considering that traditional construction machine safety monitoring and evaluation methods cannot adapt to the complex construction environment, and the monitoring methods based on sensor equipment cost too much. This paper aims to introduce computer vision and deep learning technologies to propose the YOLOv5-FastPose (YFP) model to realize the pose estimation of construction machines by improving the AlphaPose human pose model.

Design/methodology/approach

This model introduced the object detection module YOLOv5m to improve the recognition accuracy for detecting construction machines. Meanwhile, to better capture the pose characteristics, the FastPose network optimized feature extraction was introduced into the Single-Machine Pose Estimation Module (SMPE) of AlphaPose. This study used Alberta Construction Image Dataset (ACID) and Construction Equipment Poses Dataset (CEPD) to establish the dataset of object detection and pose estimation of construction machines through data augmentation technology and Labelme image annotation software for training and testing the YFP model.

Findings

The experimental results show that the improved model YFP achieves an average normalization error (NE) of 12.94 × 103, an average Percentage of Correct Keypoints (PCK) of 98.48% and an average Area Under the PCK Curve (AUC) of 37.50 × 103. Compared with existing methods, this model has higher accuracy in the pose estimation of the construction machine.

Originality/value

This study extends and optimizes the human pose estimation model AlphaPose to make it suitable for construction machines, improving the performance of pose estimation for construction machines.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 9 June 2023

Wahib Saif and Adel Alshibani

This paper aims to present a highly accessible and affordable tracking model for earthmoving operations in an attempt to overcome some of the limitations of current tracking…

Abstract

Purpose

This paper aims to present a highly accessible and affordable tracking model for earthmoving operations in an attempt to overcome some of the limitations of current tracking models.

Design/methodology/approach

The proposed methodology involves four main processes: acquiring onsite terrestrial images, processing the images into 3D scaled cloud data, extracting volumetric measurements and crew productivity estimations from multiple point clouds using Delaunay triangulation and conducting earned value/schedule analysis and forecasting the remaining scope of work based on the estimated performance. For validation, the tracking model was compared with an observation-based tracking approach for a backfilling site. It was also used for tracking a coarse base aggregate inventory for a road construction project.

Findings

The presented model has proved to be a practical and accurate tracking approach that algorithmically estimates and forecasts all performance parameters from the captured data.

Originality/value

The proposed model is unique in extracting accurate volumetric measurements directly from multiple point clouds in a developed code using Delaunay triangulation instead of extracting them from textured models in modelling software which is neither automated nor time-effective. Furthermore, the presented model uses a self-calibration approach aiming to eliminate the pre-calibration procedure required before image capturing for each camera intended to be used. Thus, any worker onsite can directly capture the required images with an easily accessible camera (e.g. handheld camera or a smartphone) and can be sent to any processing device via e-mail, cloud-based storage or any communication application (e.g. WhatsApp).

Article
Publication date: 3 May 2022

Odey Alshboul, Ali Shehadeh, Omer Tatari, Ghassan Almasabha and Eman Saleh

Efficient management of earthmoving equipment is critical for decision-makers in construction engineering management. Thus, the purpose of this paper is to prudently identify…

Abstract

Purpose

Efficient management of earthmoving equipment is critical for decision-makers in construction engineering management. Thus, the purpose of this paper is to prudently identify, select, manage and optimize the associated decision variables (e.g. capacity, number and speed) for trucks and loaders equipment to minimize cost and time objectives.

Design/methodology/approach

This paper addresses an innovative multiobjective and multivariable mathematical optimization model to generate a Pareto-optimality set of solutions that offers insights of optimal tradeoffs between minimizing earthmoving activity’s cost and time. The proposed model has three major stages: first, define all related decision variables for trucks and loaders and detect all related constraints that affect the optimization model; second, derive the mathematical optimization model and apply the multiobjective genetic algorithms and classify all inputs and outputs related to the mathematical model; and third, model validation.

Findings

The efficiency of the proposed optimization model has been validated using a case study of earthmoving activities based on data collected from the real-world construction site. The outputs of the conducted optimization process promise the model’s originality and efficiency in generating optimal solutions for optimal time and cost objectives.

Originality/value

This model provides the decision-maker with an efficient tool to select the optimal design variables to minimize the activity's time and cost.

Details

Journal of Facilities Management , vol. 22 no. 1
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 12 April 2022

Anthony Abdelmassih, Rafic Faddoul and Fadi Geara

This research aims to investigate the adoption of future technologies in earthmoving applications. The increased development in automated driving systems (ADS) has opened up…

Abstract

Purpose

This research aims to investigate the adoption of future technologies in earthmoving applications. The increased development in automated driving systems (ADS) has opened up significant opportunities to revolutionize mobility and to set the path for technologies, such as electrification. The research also aims to explore the impact of automation on electromobility in earthmoving applications.

Design/methodology/approach

This paper adopts a multi-objective simulation-based optimization approach using machine learning in earthmoving applications.

Findings

This study concludes that ADS is “conditionally” an enabler for electrification. The study highlights and explains how local and global factors affect this conclusion. In addition to that, the research explores the impact of the equipment size on the integration of future mobility technologies. The shift from “elephant to ants” in the fleet selection resulted in improved feasibility from the integration of ADS in electrification.

Originality/value

This research provides fundamental considerations in the assessment of the impact of autonomous driving solutions on electromobility in the construction industry.

Details

Construction Innovation , vol. 23 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 21 December 2022

Prashan Bandara Wijesinghe and Prasanna Illankoon

The purpose of this study was to improve the overall equipment effectiveness (OEE) of the production process of the shredder operation of ABC company, an industrial waste…

Abstract

Purpose

The purpose of this study was to improve the overall equipment effectiveness (OEE) of the production process of the shredder operation of ABC company, an industrial waste management company which supplies pre-processed industrial waste as alternative fuel to a cement plant.

Design/methodology/approach

This case study investigated all possible availability and performance losses that caused the shredder system’s OEE and various problem-solving techniques, such as root cause analysis and Pareto analysis, were used to find the root cause of the reduced OEE.

Findings

After analysing this case study, three significant loss factors were identified from all the availability and performance losses, which caused the shredder system’s OEE losses. Practical solutions were found for the effect of those loss factors to improve the machine’s OEE and productivity.

Research limitations/implications

This case study has been concentrated on only analysing of losses and improvement of OEE in the production process and not about cost analysis between loss and improvements.

Originality/value

This paper shows how to improve the OEE of a production process through various problem-solving techniques by identifying its losses and how to achieve the best solutions for those losses in a practical manner.

Details

Journal of Global Operations and Strategic Sourcing, vol. 17 no. 2
Type: Research Article
ISSN: 2398-5364

Keywords

Article
Publication date: 5 October 2022

H.P.M.N.L.B. Moragane, B.A.K.S. Perera, Asha Dulanjalie Palihakkara and Biyanka Ekanayake

Construction progress monitoring (CPM) is considered a difficult and tedious task in construction projects, which focuses on identifying discrepancies between the as-built product…

Abstract

Purpose

Construction progress monitoring (CPM) is considered a difficult and tedious task in construction projects, which focuses on identifying discrepancies between the as-built product and the as-planned design. Computer vision (CV) technology is applied to automate the CPM process. However, the synergy between the CV and CPM in literature and industry practice is lacking. This study aims to fulfil this research gap.

Design/methodology/approach

A Delphi qualitative approach was used in this study by conducting two interview rounds. The collected data was analysed using manual content analysis.

Findings

This study identified seven stages of CPM; data acquisition, information retrieval, verification, progress estimation and comparison, visualisation of the results and schedule updating. Factors such as higher accuracy in data, less labourious process, efficiency and near real-time access are some of the significant enablers in instigating CV for CPM. Major challenges identified were occlusions and lighting issues in the site images and lack of support from the management. The challenges can be easily overcome by implementing suitable strategies such as familiarisation of the workforce with CV technology and application of CV research for the construction industry to grow with the technology in line with other industries.

Originality/value

This study addresses the gap pertaining to the synergy between the CV in CPM literature and the industry practice. This research contributes by enabling the construction personnel to identify the shortcomings and the opportunities to apply automated technologies concerning each stage in the progress monitoring process.

Details

Construction Innovation , vol. 24 no. 2
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 14 March 2023

Roosefert Mohan, J. Preetha Roselyn and R. Annie Uthra

The artificial intelligence (AI) based total productive maintenance (TPM) condition based maintenance (CBM) approach through Industry 4.0 transformation can well predict the…

Abstract

Purpose

The artificial intelligence (AI) based total productive maintenance (TPM) condition based maintenance (CBM) approach through Industry 4.0 transformation can well predict the breakdown in advance to eliminate breakdown.

Design/methodology/approach

Meeting the customer requirement as per the delivery schedule with the existing resources are always a big challenge in industries. Any catastrophic breakdown in the equipment leads to increase in production loss, damage to machines, repair cost, time and affects delivery. If these breakdowns are predicted in advance, the breakdown can be addressed before its occurrence and the demand supply chain can be met. TPM is one of the essential operational excellence tool used in industries to utilize the existing resources of a plant in a optimal way. The conventional time based maintenance (TBM) and CBM approach of TPM in Industry 3.0 is time consuming and not accurate enough to achieve zero down time.

Findings

The proposed AI and IIoT based TPM is achieved in a digitalized data oriented platform to monitor and control the health status of the machine which may reduce the catastrophic breakdown by 95% and also improves the quality rate and machine performance rate. Based on the identified key signature parameters related to major breakdown are measured using the sensors, digitalised by programmable logic controller (PLC) and monitored by supervisory control and data acquisition (SCADA) and predicted in server or cloud.

Originality/value

Long short term memory based deep learning network was developed as a regression forecasting model to predict the remaining useful life RUL of the part or assembly and based on the predictions, corrective action has been implemented before the occurrence of breakdown. The reliability and consistency of the proposed approach are validated and horizontally deployed in similar machines to achieve zero downtime.

Details

Journal of Quality in Maintenance Engineering, vol. 29 no. 4
Type: Research Article
ISSN: 1355-2511

Keywords

Article
Publication date: 12 July 2023

Hadi Mahamivanan, Navid Ghassemi, Mohammad Tayarani Darbandy, Afshin Shoeibi, Sadiq Hussain, Farnad Nasirzadeh, Roohallah Alizadehsani, Darius Nahavandi, Abbas Khosravi and Saeid Nahavandi

This paper aims to propose a new deep learning technique to detect the type of material to improve automated construction quality monitoring.

Abstract

Purpose

This paper aims to propose a new deep learning technique to detect the type of material to improve automated construction quality monitoring.

Design/methodology/approach

A new data augmentation approach that has improved the model robustness against different illumination conditions and overfitting is proposed. This study uses data augmentation at test time and adds outlier samples to training set to prevent over-fitted network training. For data augmentation at test time, five segments are extracted from each sample image and fed to the network. For these images, the network outputting average values is used as the final prediction. Then, the proposed approach is evaluated on multiple deep networks used as material classifiers. The fully connected layers are removed from the end of the networks, and only convolutional layers are retained.

Findings

The proposed method is evaluated on recognizing 11 types of building materials which include 1,231 images taken from several construction sites. Each image resolution is 4,000 × 3,000. The images are captured with different illumination and camera positions. Different illumination conditions lead to trained networks that are more robust against various environmental conditions. Using VGG16 model, an accuracy of 97.35% is achieved outperforming existing approaches.

Practical implications

It is believed that the proposed method presents a new and robust tool for detecting and classifying different material types. The automated detection of material will aid to monitor the quality and see whether the right type of material has been used in the project based on contract specifications. In addition, the proposed model can be used as a guideline for performing quality control (QC) in construction projects based on project quality plan. It can also be used as an input for automated progress monitoring because the material type detection will provide a critical input for object detection.

Originality/value

Several studies have been conducted to perform quality management, but there are some issues that need to be addressed. In most previous studies, a very limited number of material types were examined. In addition, although some studies have reported high accuracy to detect material types (Bunrit et al., 2020), their accuracy is dramatically reduced when they are used to detect materials with similar texture and color. In this research, the authors propose a new method to solve the mentioned shortcomings.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

1 – 8 of 8