Search results

1 – 10 of over 1000
Open Access
Article
Publication date: 7 May 2024

Yazeed A. Alragabah and Mohd. Ahmed

There is a limited number of research work on critical success factors (CSFs) in public construction projects in Saudi Arabia. In response to this knowledge gap, the objective of…

Abstract

Purpose

There is a limited number of research work on critical success factors (CSFs) in public construction projects in Saudi Arabia. In response to this knowledge gap, the objective of this paper is to assess the impact of CSFs on the government construction projects in Saudi Arabia. The success factors are investigated from a broader consideration of failure criteria, from consideration of most effectiveness in successful project completion and also from consideration of the impact of implementing control processes for successful project completion.

Design/methodology/approach

This study has analysed the impact of success factors on construction projects in Saudi Arabia using a descriptive methodology. An exhaustive literature survey is undertaken to identify the success and failure factors related to government construction projects in Saudi Arabia. The survey data are sorted out and analysed by cost, schedule, technical, context and finance dimensions of the projects based on project types, engineering complexity, size, modality, jurisdictional control and funding approach. To evaluate the influence of success factors implementation, qualitative data were collected in a survey via a web-based questionnaire that was sent to officials working and occupying a responsible position in national project guidelines organizations and in government construction organizations in Saudi Arabia. In all, 28 CSFs were identified, ranked and evaluated for their impact on project success. The four identified factors belong to process categories of construction projects, nine factors belong to management of construction projects and 15 success factors are identified for impact assessment of implementation in construction projects.

Findings

The study's findings have identified and ranked the top five CSFs that significantly influence project outcomes, including meeting time targets, adhering to financial budgets, delivering desired outcomes for all stakeholders, effectively managing risks and assembling the appropriate team while optimizing resource allocation. Additionally, the research indicates that hindrances to projects primarily stem from execution, economic, human and political factors. The study advocates for strict controls over incomplete engineering designs and advises against contractors independently handling design work to ensure project success. Additionally, addressing contractors' qualifications and financial matters is crucial for project success. By highlighting these CSFs and challenges, the research provides actionable insights to enhance project management practices in the construction industry.

Research limitations/implications

This study is limited to the infrastructure projects constructed by governmental bodies with the participation of officials from government organizations. Further study, including private projects and officials working on private projects, may be needed to generalized the research outcome.

Originality/value

Numerous studies have investigated CSFs in construction projects, but few have examined their relevance to Saudi Arabian government projects. This study aims to fill this gap by identifying key CSFs specific to Saudi Arabian public sector construction projects and assessing their impact on project success. It advocates for stringent controls in the Saudi Arabian construction sector, emphasizing the importance of preventing incomplete or altered engineering designs by contractors to increase the success rate of public sector projects. This research offers practical insights to stakeholders, advancing project management practices in Saudi Arabia's construction sector for improved outcomes and resource utilization.

Details

Frontiers in Engineering and Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2634-2499

Keywords

Article
Publication date: 21 May 2024

Chelteau Barajei, Emmanuel Bamfo-Agyei, Prince Antwi-Agyei, Musah Osumanu Doumbia and Mac Nyameche

The procurement reforms carried out by the Government of Ghana have led to the creation of the Public Procurement Authority and the passage of the Public Procurement (Amended) Act…

Abstract

Purpose

The procurement reforms carried out by the Government of Ghana have led to the creation of the Public Procurement Authority and the passage of the Public Procurement (Amended) Act 2016. Nevertheless, many obstacles could prevent an open and fair competition during the procurement of works. This significantly affects the success of Ghanaian construction projects. Therefore, this paper aims to explore the factors to enhance the success of the contractor selection phase of the Ghanaian public labor-based construction project.

Design/methodology/approach

A quantitative research approach was adopted by this study. Data was collected through a self-administered questionnaire to 377 respondents across Ghana. The data was then analyzed using structural equation modeling.

Findings

This study revealed that external, project procedures and project management factors impact the Ghanaian labor-based contractor selection phase success.

Research limitations/implications

This study is limited to the contractor selection phase of Ghanaian public labor-based projects and developing nations with similar socioeconomic characteristics.

Social implications

Strict adherence to this study’s findings will enable the government to undertake more infrastructure projects to raise the standard of living for its populace.

Originality/value

Although several studies have been conducted to improve the success of construction projects in developing nations, very little focus has been placed on the success factors of the contractor selection phase of public construction projects. These findings are vital in discovering for the first-time factors influencing the success of the tender stage of public labor-based projects in Ghana and developing nations with similar socioeconomic characteristics.

Details

Journal of Public Procurement, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1535-0118

Keywords

Article
Publication date: 26 March 2024

Duc-Anh Le, Chau Ngoc Dang, Long Le-Hoai and Viet Quoc Hoang

Official development assistance (ODA) education projects have played a crucial role in improving education and training fields in developing countries, but are often facing…

Abstract

Purpose

Official development assistance (ODA) education projects have played a crucial role in improving education and training fields in developing countries, but are often facing several considerable challenges (e.g. long implementation time). Thus, this study aims to identify critical success factors (CSFs) in ODA education projects and investigate the influences of CSFs on ODA project performance measured by 11 nonprofit outcomes (NPOs).

Design/methodology/approach

A comprehensive literature review and expert interviews were conducted to compile a list of 35 potential success factors for ODA education projects. Using a survey questionnaire, 143 valid responses were collected from practitioners joining ODA projects in Vietnam. Various statistical methods (e.g. mean score method, Spearman rank correlation test, analysis of variance test, factor analysis and regression analysis) were used to analyze the collected data.

Findings

This research identified seven CSFs for ODA education projects in Vietnam: comprehensive project management competency (C1), clarity and compliance in project execution (C2), transparency and committed funding (C3), external context conditions (C4), well-controlled design and project management procedures (C5), preparations in equipment and complexity insight (C6) and punctual site delivery (C7). Furthermore, the results of regression analysis indicated that comprehensive project management competency (C1) and transparency and committed funding (C3) could significantly affect various NPOs.

Originality/value

This study offers significant insights for practitioners (e.g. project managers) to improve ODA projects’ performance and effectiveness in the education and training sector of a developing country context (like Vietnam).

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 25 March 2024

Francis Nuako, Frank Ato Ghansah and Thomas Adusei

It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been…

Abstract

Purpose

It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been advancements in the management of building projects throughout time but cost overruns remain a key concern in the construction sector internationally, particularly in emerging economies such as Ghana. This study aims to answer the question, “What are the critical success factors (CSFs) that can assist reduce cost overruns in public sector infrastructure projects in the Ghanaian construction industry?”

Design/methodology/approach

This study used a quantitative survey method. The questionnaire was pre-tested by interviewing 15 contractors to ascertain the validity of the content. Factor analysis and multiple regression were adopted to analyze the data.

Findings

This study discovered that the critical factors that can reduce cost overruns in construction projects in Ghana are directly linked to five themes: early contractor involvement in the project planning stage, adequate funding, good project team relations, competent managers/supervisors and project participant incentives/bonuses. This study identifies indestructible, empirically measurable important success criteria for reducing cost overruns in public building projects in Ghana.

Practical implications

When well thought through from the project initiation stage to completion, these critical successes can also be used to deal with damaging economic effects such as allocative inefficiency of scarce resources, further delays, contractual disputes, claims and litigation, project failure and total abandonment.

Originality/value

The uniqueness of this research resides in the fact that it is, to the best of the authors’ knowledge, a first-of-its-kind investigation of the CSFs for reducing cost overruns in public building projects in developing countries.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 21 May 2024

Neda Kiani Mavi, Kerry Brown, Richard Glenn Fulford and Mark Goh

The global construction industry has a history of poor project success, with evident and frequent overruns in cost and schedule. This industry is a highly interconnected and…

Abstract

Purpose

The global construction industry has a history of poor project success, with evident and frequent overruns in cost and schedule. This industry is a highly interconnected and complex system in which the components, i.e. suppliers, contractors, end-users, and stakeholders, are delicately linked to each other, the community, and the environment. Therefore, defining and measuring project success can be challenging for sponsors, contractors, and the public. To address this issue, this study develops and analyzes a more comprehensive set of success criteria for medium and large construction projects.

Design/methodology/approach

After reviewing the existing literature, this study identified 19 success criteria for medium and large construction projects, which were categorized into five groups. The fuzzy decision-making trial and evaluation laboratory (fuzzy DEMATEL) method was used to gain further insight into the interrelationships between these categories and explain the cause-and-effect relationships among them. Next, this study applied the modified logarithmic least squares method to determine the importance weight of these criteria using the fuzzy analytic hierarchy process.

Findings

28 project managers working in the construction industries in Australia and New Zealand participated in this study. Results suggest that “project efficiency” and “impacts on the project team” are cause criteria that affect “business success,” “impacts on stakeholders,” and “impacts on end-users.” Effective risk management emerged as the most crucial criterion in project efficiency, while customer satisfaction and return on investment are top criteria in “impacts on end-users” and “business success.”

Originality/value

Although numerous studies have been conducted on project success criteria, multicriteria analyses of success criteria are rare. This paper presents a comprehensive set of success criteria tailored to medium and large construction projects. The aim is to analyze their interrelationships and prioritize them thoroughly, which will aid practitioners in focusing on the most important criteria for achieving higher success rates.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 20 May 2024

Abdulmawlay Ramadhan, Kolawole Iyiola and Ahmad Bassam Alzubi

The purpose of this study is to investigate the relationship between the absorptive capacity (AC) of a firm and project success (PS), with particular attention to the mediating…

Abstract

Purpose

The purpose of this study is to investigate the relationship between the absorptive capacity (AC) of a firm and project success (PS), with particular attention to the mediating role of customer knowledge management capability (CKMC) and the moderating role of environmental complexity (EC). By using data collected from Turkish SMEs across different sectors, the study seeks to understand how AC impacts project success, how CKMC mediates this relationship, and how EC moderates the link between AC and CKMC. The research contributes to both theory and practice by providing insights into these relationships and suggesting future research directions.

Design/methodology/approach

This study focuses on Small and Medium-sized Enterprises (SMEs) in Turkey, specifically within the cities of Istanbul, Ankara, Izmir, and Konya. To gather data, the researchers utilized a non-probabilistic convenience sampling method and distributed self-administered surveys to a selected pool of 918 respondents including shift supervisors, project managers, and team members within these SMEs. The surveys were translated to Turkish to avoid language issues. Out of the surveys distributed, 401 valid responses were collected, resulting in a response rate of 43.68%.

Findings

The main findings of the study indicate that a firm’s absorptive capacity (AC) positively impacts project success and customer knowledge management capability (CKMC). Furthermore, CKMC plays a mediating role, positively influencing project success. Additionally, the study reveals the moderating effect of environmental complexity (EC) on the relationship between AC and CKMC, suggesting that as EC becomes more complex, it strengthens the link between AC and CKMC. Moreover, CKMC was found to mediate the moderating effect of EC on the relationship between AC and project success, emphasizing the significance of environmental complexity in this interaction.

Research limitations/implications

This study’s limitations stem from its cross-sectional approach, which limits the ability to establish causal relationships between the constructs of absorptive capacity (AC), customer knowledge management capability (CKMC), and project success. It does not examine other potential mediators, such as customer relationship capability and innovation capability. Furthermore, the existing literature on this topic is scarce, suggesting a need for further research, particularly on constructs like team skills for managing CKMC. There is also an unexplored area around the effects of different forms of complexity, such as resource and technical complexity. Finally, further research is needed to understand how SMEs, which often face resource constraints, leverage AC in different functional domains for successful new product development.

Practical implications

The study’s findings have significant practical implications for SMEs, highlighting the importance of absorptive capacity (AC) and customer knowledge management capability (CKMC) in promoting project success, particularly under conditions of environmental complexity. As businesses navigate uncertain environments, external knowledge acquisition becomes crucial for improvement and innovation. Efficient transformation of this knowledge can enhance project success rates. Thus, firms should cultivate a proactive, innovative, and risk-taking climate. Also, firms should regularly assess their AC and CKMC in the face of shifting stakeholder expectations and market competition. The ability to detect, integrate, and apply external knowledge in product and service development can significantly enhance project success rates.

Originality/value

This study’s originality lies in its exploration of the complex interplay between a firm’s absorptive capacity (AC), customer knowledge management capability (CKMC), environmental complexity (EC), and project success (PS). By examining Turkish SMEs across various sectors, the study uncovers the mediating role of CKMC and the moderating role of EC in the relationship between AC and PS. Furthermore, it reveals how the effect of AC on PS through CKMC strengthens with increasing environmental complexity. These findings offer fresh insights into the complexity theory and the factors influencing project success, providing a unique perspective for both academics and practitioners, with practical implications for managing SMEs in complex environments.

Details

Business Process Management Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1463-7154

Keywords

Article
Publication date: 3 May 2024

Maria Cleofe Giorgino and Federico Barnabè

Drawing motivation from the greater exposure to uncertainty and condition changes that affect large projects due to their long lifecycle, this paper aims to investigate how the…

Abstract

Purpose

Drawing motivation from the greater exposure to uncertainty and condition changes that affect large projects due to their long lifecycle, this paper aims to investigate how the time factor affects the use of governance mechanisms to pursue the success of these projects.

Design/methodology/approach

To pursue its aim, the article applies the dichotomization between the hard and soft mechanisms of project governance to the analysis of a historical case study, whose findings are organized over the short, medium and long periods. The case selected is referred to the peculiar water system, made up of tunnels named “bottini,” that was in use in Siena (Italy) as the old aqueduct. Specifically, the study focuses on the project of expansion of this water system that was realized during the 14th century for the construction of the “Bottino maestro di Fontegaia.”

Findings

This article highlights the different relevance that, during the lifecycle of large projects, is assumed by hard and soft governance mechanisms, with the former having main relevance in a short and medium period, and the latter usually emerging in the medium period and, subsequently, playing a growing role for the project success in the long period.

Originality/value

The article contributes to the literature on large projects by providing novel insights about how the time factor impacts the governance of these projects. Furthermore, the case study, with its unique history, highlights the relevance of combining effectively the hard and the soft dimensions of project governance to pursue success.

Details

Journal of Management History, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1751-1348

Keywords

Article
Publication date: 6 May 2024

Ling Liang, Jiqing Xie, Jie Ren, Jialiang Wang and Chang Wang

Information opacity in donation crowdfunding activities has constrained the healthy development of China’s public welfare activities. Addressing the trust crisis and enhancing…

Abstract

Purpose

Information opacity in donation crowdfunding activities has constrained the healthy development of China’s public welfare activities. Addressing the trust crisis and enhancing public engagement warrants further investigation. This study aims to uncover the moderating effect of activity transparency by utilizing data from 1,029 donation crowdfunding projects on the Sina Weibo Public Welfare Social Platform. In this way, we seek to elucidate the impact of donation crowdfunding events on fundraising ability.

Design/methodology/approach

This study selects text complexity, number of supporters, creator experience, and social capital as explanatory variables; innovatively selects the number of updates of online crowdfunding activities and total reading volume as moderating variables; selects the number of shares of crowdfunding activities as a mediating variable; and constructs a moderated mediation multiple regression model for fundraising ability.

Findings

Our findings indicate that independent variables, such as text complexity, number of supporters, and social capital, can significantly affect the dependent variable, fundraising ability. However, creator experience does not influence fundraising ability. Furthermore, social interaction has a mediating effect, whereas activity transparency has a reverse moderating effect. These results indicate that social interaction can enhance the fundraising ability of donation crowdfunding events. However, with an increase in information transparency, the fundraising ability of social media decreases.

Originality/value

The originality of this research is in clarifying the internal factors affecting fundraising ability through induction, making bold assumptions, and focusing on how social media’s effective interaction and activity transparency will affect public welfare crowdfunding fundraising ability.

Details

Industrial Management & Data Systems, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0263-5577

Keywords

Article
Publication date: 14 March 2024

Umer Zaman, Laura Florez-Perez, Saba Abbasi and Muhammad Shahid Nawaz

Organizations are full of contradictions and leadership dilemmas. Managers often face challenges such as selecting between two contradicting options such that which one is more…

159

Abstract

Purpose

Organizations are full of contradictions and leadership dilemmas. Managers often face challenges such as selecting between two contradicting options such that which one is more important can hardly be judged. To manage contradicting dynamics, today’s managers can adopt the paradoxical leadership approach. We build a theoretical model to investigate the influence of paradoxical leadership on multi-dimensional project agility (proactivity, adaptability, and resilience), and multi-dimensional project success (management, investment, and ownership success).

Design/methodology/approach

Drawing on survey-based data from the China–Pakistan Economic Corridor (CPEC) megaproject (N = 209), we performed covariance-based structural equation modeling to test the conceptual model.

Findings

The findings show that (1) paradoxical leadership has a significant positive impact on megaproject success, (2) paradoxical leadership has a significant positive influence on project agility, (3) project agility has a significant positive effect on megaproject success, and (4) project agility has a significant effect that mediates the link between paradoxical leadership and megaproject success. This research provides a theoretical and practical comprehension of paradoxical leadership with a new perspective on megaprojects.

Originality/value

This study provides an extension of the existing studies on paradoxical leadership and identifies the role of contradicting dynamics and their impact on multiple facets of megaproject success. It not only clarifies the relationship between paradoxical leadership and megaproject success, but also identifies the mediating role of project agility that can play an effective role in mobilizing success in megaprojects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 17 May 2024

Farah Shahrin, Zerafinas Abu Hassan and Ross Azura Zahit

This interdisciplinary study re-evaluates the Sungai Melaka flood mitigation project’s impact on community success in Malaysia’s UNESCO World Heritage site, broadening the…

Abstract

Purpose

This interdisciplinary study re-evaluates the Sungai Melaka flood mitigation project’s impact on community success in Malaysia’s UNESCO World Heritage site, broadening the definition of success considering historical and cultural significance. This study aims to revisit success metrics, focusing on the project’s influence on people’s interactions, cultural well-being, social cohesion and heritage preservation.

Design/methodology/approach

This study explored visitors’ reviews of their experience visiting Sungai Melaka in several data collection stages. The first data collection involved a Web survey posted on Facebook to capture diverse perspectives of the population and grasp the core strand of knowledge to focus on the second data collection, the questionnaire. The final stage involved interviews to generate rich qualitative data.

Findings

The findings of this study revealed that the impact exceeded tangible outcomes, as the project impacted people’s interactions and practices. This research assesses cultural benefits, incorporating these indicators into evaluating cultural ecosystem services by capturing local visitors’ and communities’ perceptions, preferences and behaviours. The findings found that other project success attributes include identities, capabilities and experience, further defining learning, health, economics, connection to nature and symbolism.

Originality/value

This research explores the meaning of project success beyond the traditional metrics by capturing success from the users’ perspectives and people’s interaction and their impact on culture and well-being. The cultural ecosystem services framework used in this study is applied to explore the interactions between people and the facility and its effect on the people.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Access

Year

Last 3 months (1196)

Content type

Earlycite article (1196)
1 – 10 of over 1000