Combining optimisation and simulation for steel production scheduling

Patrik Appelqvist (Helsinki University of Technology, Department of Industrial Engineering and Management, Helsinki, Finland)
Juha‐Matti Lehtonen (Helsinki University of Technology, Department of Industrial Engineering and Management, Helsinki, Finland)

Journal of Manufacturing Technology Management

ISSN: 1741-038X

Article publication date: 1 March 2005

2956

Abstract

Purpose

Scheduling problems in steel plants tend to be difficult and require complex algorithms due to many constraints. An approach is presented where only the main constraints are included in the scheduling algorithm. The schedule is validated using a discrete‐event simulation model that includes additional detail.

Design/methodology/approach

The combined approach is utilised for production scheduling in a steel mill in Finland. Operational performance of the steel mill is measured before and after software installation. The paper presents the scheduling environment, the software application and the resulting increase of production.

Findings

Case experiences indicate that combining optimisation techniques with simulation is beneficial. The optimisation can be kept simpler as validation with a simulation model increases the credibility and accuracy of the resulting schedule. During software development and testing, the simulation model offered a testing environment for the optimisation algorithm.

Practical implications

The case implementation was a success that increased production without making trade‐offs with other production goals. Company management estimate the productivity increase directly caused by the project to be worth €2,500,000 annually.

Originality/value

The paper presents a successful application of simulation for schedule validation in a complex and demanding environment.

Keywords

Citation

Appelqvist, P. and Lehtonen, J. (2005), "Combining optimisation and simulation for steel production scheduling", Journal of Manufacturing Technology Management, Vol. 16 No. 2, pp. 197-210. https://doi.org/10.1108/17410380510576831

Publisher

:

Emerald Group Publishing Limited

Copyright © 2005, Emerald Group Publishing Limited

Related articles