Search results

1 – 6 of 6
Article
Publication date: 12 September 2023

Yunfei Xing, Yuming He and Justin Z. Zhang

The coronavirus disease 2019 (COVID-19) pandemic caused significant disruption to the global labor market, resulting in a rapid transition toward remote work, e-commerce and…

Abstract

Purpose

The coronavirus disease 2019 (COVID-19) pandemic caused significant disruption to the global labor market, resulting in a rapid transition toward remote work, e-commerce and workforce automation. This shift has sparked a considerable amount of public discussion. This study aims to explore the online public's sentiment toward remote work amid the pandemic.

Design/methodology/approach

Based on justice theory, this paper examines user-generated content on social media platforms, particularly Twitter, to gain insight into public opinion and discourse surrounding remote work during the COVID-19 pandemic. Employing content analysis techniques such as sentiment analysis, text clustering and evolutionary analysis, this study aims to identify prevalent topics, temporal patterns and instances of sentiment polarization in tweets.

Findings

Results show that people with positive opinions focus mainly on personal interests, while others focus on the interests of the company and society; people's subjectivities are higher when they express extremely negative or extremely positive emotions. Distributive justice and interactional justice are distinguishable with a high degree of differentiation in the cluster map.

Originality/value

Previous research has inadequately addressed public apprehensions about remote work during emergencies, particularly from a justice-based perspective. This study seeks to fill this gap by examining how justice theory can shed light on the public's views regarding corporate policy-making during emergencies. The results of this study provide valuable insights and guidance for managing public opinion during such events.

Details

Library Hi Tech, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0737-8831

Keywords

Article
Publication date: 29 August 2024

Yizhuo Zhang, Yunfei Zhang, Huiling Yu and Shen Shi

The anomaly detection task for oil and gas pipelines based on acoustic signals faces issues such as background noise coverage, lack of effective features, and small sample sizes…

Abstract

Purpose

The anomaly detection task for oil and gas pipelines based on acoustic signals faces issues such as background noise coverage, lack of effective features, and small sample sizes, resulting in low fault identification accuracy and slow efficiency. The purpose of this paper is to study an accurate and efficient method of pipeline anomaly detection.

Design/methodology/approach

First, to address the impact of background noise on the accuracy of anomaly signals, the adaptive multi-threshold center frequency variational mode decomposition method(AMTCF-VMD) method is used to eliminate strong noise in pipeline signals. Secondly, to address the strong data dependency and loss of local features in the Swin Transformer network, a Hybrid Pyramid ConvNet network with an Agent Attention mechanism is proposed. This compensates for the limitations of CNN’s receptive field and enhances the Swin Transformer’s global contextual feature representation capabilities. Thirdly, to address the sparsity and imbalance of anomaly samples, the SpecAugment and Scaper methods are integrated to enhance the model’s generalization ability.

Findings

In the pipeline anomaly audio and environmental datasets such as ESC-50, the AMTCF-VMD method shows more significant denoising effects compared to wavelet packet decomposition and EMD methods. Additionally, the model achieved 98.7% accuracy on the preprocessed anomaly audio dataset and 99.0% on the ESC-50 dataset.

Originality/value

This paper innovatively proposes and combines the AMTCF-VMD preprocessing method with the Agent-SwinPyramidNet model, addressing noise interference and low accuracy issues in pipeline anomaly detection, and providing strong support for oil and gas pipeline anomaly recognition tasks in high-noise environments.

Details

International Journal of Intelligent Computing and Cybernetics, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1756-378X

Keywords

Article
Publication date: 29 August 2024

Yunxiang Li, Yunfei Ai, Jinzhou Zou, Liangyu Liu, Chengjian Liu, Siheng Fu, Dehua Zou and Wang Wei

By analyzing the shortcomings of existing insulator robots, a novel ultra high voltage (UHV) insulator climbing robot, which could transfer between adjacent insulator strings, is…

Abstract

Purpose

By analyzing the shortcomings of existing insulator robots, a novel ultra high voltage (UHV) insulator climbing robot, which could transfer between adjacent insulator strings, is proposed for operation on 800KV multiple-string insulators. An extended inchworm-like configuration was chosen and a stable gripping claw suitable for the insulator string was designed to enable the robot to multiple-string insulators. Then a set of nonheuristic structural parameters that can influence energy consumption was chosen to formulate a nonlinear optimization problem based on the configuration, which improved the energy efficiency of the robot during progressing along a string of insulator.

Design/methodology/approach

The purpose of this paper is to design an insulator climbing robot for operation on UHV multiple-string insulators, which could transfer between adjacent insulator strings and progressed along a string of insulator with high energy efficiency.

Findings

A physical prototype was constructed that can operate at the speed of six pieces per minute (approximately 1.44 meters per minute) on a single string and complete transference between adjacent strings in 45 s. The energy consumption of joints during progressed along a string of insulator had been reduced by 38.8% with the optimized parameters, demonstrating the consistency between the experimental and simulation results.

Originality/value

An insulator climbing robot for operation on UHV multiple-string insulators has been developed with energy consumption optimization design. The robot can transfer between adjacent insulator strings and progressed along a string of insulator with high energy efficiency. The CLIBOT could be expanded to detect or clean the insulators with similar specification.

Details

Industrial Robot: the international journal of robotics research and application, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0143-991X

Keywords

Article
Publication date: 27 July 2023

Binchao Deng, Xindong Lv, Yaling Du, Xiaoyu Li and Yilin Yin

Inefficiency dilemmas in project governance are caused by various risks arising from the characteristic of construction supply chain projects, such as poor project performance…

Abstract

Purpose

Inefficiency dilemmas in project governance are caused by various risks arising from the characteristic of construction supply chain projects, such as poor project performance, conflicts between stakeholders and cost overrun. This research aims to establish a fuzzy synthetic evaluation (FSE) model to analyze construction supply chain risk factors. Corresponding risk mitigation strategies are provided to facilitate the improvement performance of ongoing construction supply chain projects.

Design/methodology/approach

A literature review is utilized to reveal the deficiencies of construction supply chain risk management. Thus, a total of five hundred (500) questionnaires are distributed to construction professionals, and four hundred and thirty-five (435) questionnaires are recovered to obtain the evaluation data of construction professionals on critical risk factors. Additionally, the FSE is used to analyze and rank the significance of critical risk factors. Finally, this research discusses nine critical risk factors with high weight in the model, and explains the reason for the significance of critical risk factors in the construction supply chain.

Findings

The questionnaire results show that the thirty-one (31) identified critical risk factors are verified by related practitioners (government departments, universities and research institutions, owners, construction units, financial institutions, design units, consulting firms). Thirty-one (31) identified critical risk factors are divided into common risks, risks from contractors and risks from owners. The most significant factors in the three categories, respectively, are “political risks,” “owner's unprofessional” approach and “cash flow.” Managing these risks can facilitate the development of the construction supply chain.

Originality/value

This paper expands the research perspective of construction supply chain risk management and complements the risks in the construction supply chain. For practitioners, the research result provides some corresponding measures to deal with these risks. For researchers, the research result provides the direction of construction supply chain risk treatment.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 4 June 2024

Emna Gara Bach Ouerdian

Previous research suggests that motivation to transfer is related to the effective transfer of training, but less is known about the boundary conditions of this relationship…

Abstract

Purpose

Previous research suggests that motivation to transfer is related to the effective transfer of training, but less is known about the boundary conditions of this relationship. Therefore, this study aims to propose that motivation to transfer is more strongly related to training transfer when employees have a stronger personal capacity for transfer. The author also hypothesizes that this two-way interaction is further moderated by gender.

Design/methodology/approach

Using a cross-sectional design and a sample of 257 Tunisian workers, a three-way interaction model with the PROCESS macro (Hayes, 2018) was used to test the hypotheses.

Findings

Results show that workers respond to motivation to transfer with increased training transfer. Personal capacity for transfer and gender moderated the proposed relationship. Thus, the interaction effect between motivation to transfer and personal capacity for transfer is significant for women but not significant for men. More specifically, motivation to transfer is more likely to predict training transfer among women with high personal capacity for transfer than among those with low.

Originality/value

This study adds to the literature on motivation to transfer and training transfer by explaining two boundary conditions in this relationship and by recognizing the conditional interaction effect of gender on the moderating effect of personal capacity for transfer.

Details

European Journal of Training and Development, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-9012

Keywords

Article
Publication date: 11 December 2023

Mohammad Hosein Madihi, Ali Akbar Shirzadi Javid and Farnad Nasirzadeh

In traditional Bayesian belief networks (BBNs), a large amount of data are required to complete network parameters, which makes it impractical. In addition, no systematic method…

Abstract

Purpose

In traditional Bayesian belief networks (BBNs), a large amount of data are required to complete network parameters, which makes it impractical. In addition, no systematic method has been used to create the structure of the BBN. The aims of this study are to: (1) decrease the number of questions and time and effort required for completing the parameters of the BBN and (2) present a simple and apprehensible method for creating the BBN structure based on the expert knowledge.

Design/methodology/approach

In this study, by combining the decision-making trial and evaluation laboratory (DEMATEL), interpretive structural modeling (ISM) and BBN, a model is introduced that can form the project risk network and analyze the impact of risk factors on project cost quantitatively based on the expert knowledge. The ranked node method (RNM) is then used to complete the parametric part of the BBN using the same data obtained from the experts to analyze DEMATEL.

Findings

Compared to the traditional BBN, the proposed method will significantly reduce the time and effort required to elicit network parameters and makes it easy to create a BBN structure. The results obtained from the implementation of the model on a mass housing project showed that considering the identified risk factors, the cost overruns relating to material, equipment, workforce and overhead cost were 37.6, 39.5, 42 and 40.1%, respectively.

Research limitations/implications

Compared to the traditional BBN, the proposed method will significantly reduce the time and effort required to elicit network parameters and makes it easy to create a BBN structure. The results obtained from the implementation of the model on a mass housing project showed that considering the identified risk factors, the cost overruns relating to material, equipment, workforce and overhead cost were 37.6, 39.5, 42 and 40.1%, respectively. The obtained results are based on a single case study project and may not be readily generalizable.

Originality/value

The presented framework makes the BBN more practical for quantitatively assessing the impact of risk on project costs. This helps to manage financial issues, which is one of the main reasons for project bankruptcy.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 6 of 6