Article
Publication date: 3 November 2022

Aba Essanowa Afful, Joshua Ayarkwa, Godwin Kojo Kumi Acquah, Ama Antwi Darkwa Ossei Assibey and Dickson Osei-Asibey

The purpose of this study is to identify the capacity needs of building professionals to deliver environmentally sustainable buildings (ESBs) globally, from a unique systems…

Abstract

Purpose

The purpose of this study is to identify the capacity needs of building professionals to deliver environmentally sustainable buildings (ESBs) globally, from a unique systems approach. Through a review of extant literature, this study contributes to knowledge of the global delivery of ESBs by identifying research trends and gaps that can be tackled in future research, and current hotspots in capacity building (CB) research within the built environment (BE). The adopted systems approach to CB postulates that the construction industry is systemized in nature, and thus, CB solutions within the industry should be approached from a systems approach.

Design/methodology/approach

A literature search was conducted using the Scopus search engine, augmented by Google Scholar and Web of Science, to produce 54 relevant articles for analysis. The scientometric analysis was undertaken with the use of VOSViewer to better understand the broad literature on CB in the construction industry which would not have been possible with traditional data analysis. The content analysis allowed, for a systematic review of selected articles, to reveal key themes in this study.

Findings

Through a content analysis, four levels of CB were identified within the construction industry; individual level, organizational level, industry level and state level. Nine sub-capacities were subsumed under the four identified levels adopted from Potter and Brough (2004), including but not limited to Performance capacity, Workload capacity, Supervisory capacity, Industry Role capacity and Systems capacity. Under each sub-capacity, key questions were posed to aid identify the capacity needs of BE professionals. A framework for identifying capacity needs in the BE is proposed.

Practical implications

The findings of this study serve as a useful reference for practitioners and policymakers to assess their level of commitment to CB efforts for ESB delivery. The findings of this study have revealed that building the capacities of BE professionals to deliver ESBs should be addressed as part of a broader framework, interdependent on the other levels of CB in the systemic construction industry.

Originality/value

As a review study identifying capacity needs for BE professionals to deliver ESBs, this study enhances knowledge of CB within the construction industry.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 5
Type: Research Article
ISSN: 1726-0531

Keywords

Open Access
Article
Publication date: 29 September 2023

Prateek Kalia, Meenu Singla and Robin Kaushal

This study is the maiden attempt to understand the effect of specific human resource practices (HRPs) on employee retention (ER) with the mediation of job satisfaction (JS) and…

6135

Abstract

Purpose

This study is the maiden attempt to understand the effect of specific human resource practices (HRPs) on employee retention (ER) with the mediation of job satisfaction (JS) and moderation of work experience (WE) and job hopping (JH) in the context of the textile industry.

Design/methodology/approach

This study adopted a quantitative methodology and applied quota sampling to gather data from employees (n = 365) of leading textile companies in India. The conceptual model and hypotheses were tested with the help of Partial Least Squares-Structural Equation Modelling (PLS-SEM).

Findings

The findings of a path analysis revealed that compensation and performance appraisal (CPA) have the highest impact on JS followed by employee work participation (EWP). On the other hand, EWP had the highest impact on ER followed by grievance handling (GRH). The study revealed that JS significantly mediates between HRPs like CPA and ER. During Multi-group analysis (MGA) it was found that the importance of EWP and health and safety (HAS) was more in employee groups with higher WE, but it was the opposite in the case of CPA. In the case of JH behavior, the study observed that EWP leads to JS in loyal employees. Similarly, JS led to ER, and the effect was more pronounced for loyal employees.

Originality/value

In the context of the Indian textile industry, this work is the first attempt to comprehend how HRPs affect ER. Secondly, it confirmed that JS is not a guaranteed mediator between HRPs and ER, it could act as an insignificant, partial or full mediator. Additionally, this study establishes the moderating effects of WE and JH in the model through multigroup analysis.

Details

International Journal of Productivity and Performance Management, vol. 73 no. 11
Type: Research Article
ISSN: 1741-0401

Keywords

Open Access
Article
Publication date: 13 September 2024

Baraka Israel and Beny Mwenda

Public procurement presents substantial market opportunities for small- and medium-sized enterprises (SMEs), which can contribute to their economic growth. However, limited…

Abstract

Purpose

Public procurement presents substantial market opportunities for small- and medium-sized enterprises (SMEs), which can contribute to their economic growth. However, limited dynamic capabilities often pose challenges for SMEs to participate effectively in public procurement markets. Drawing on dynamic capability (DC) theory, this study explores whether financial capability (FNCP) influences SMEs’ ability to leverage their technological capability (TECC) and marketing sensing capability (MKSC) and actively engage in public procurement.

Design/methodology/approach

Data for this study were collected from 248 SME managers in the Ilala District, Tanzania, using a cross-sectional questionnaire survey and stratified random sampling technique. The proposed hypotheses were tested empirically through confirmatory factor analysis (CFA) and the Hayes PROCESS macro.

Findings

TECC and MKSC demonstrated significant positive associations with SME participation in public procurement (SMPP). Moreover, the interaction between TECC and FNCP as well as the interaction between MKSC and FNCP demonstrate a significant positive effect, suggesting that FNCP strengthens the impact of TECC and MKSC on SMPP.

Research limitations/implications

The scope of this study was limited to SMEs in the Ilala District of Tanzania, hence affecting the generalizability of the findings to other contexts. More importantly, the study findings enrich the understanding of DC theory, signifying that the integration and reconfiguration of MKSC, TECC and FNCP add significant value to SMPP.

Practical implications

The findings suggest that policymakers, support institutions and SME managers should focus on enhancing SMEs' MKSC and TECC to improve their participation in public procurement. In addition, improving SMEs' access to financial resources can further strengthen these effects, enabling more inclusive participation in public procurement.

Originality/value

The study contributes to the literature on SMPP by highlighting the critical roles of MKSC and TECC. It also underscores the importance of FNCP as a moderator in these relationships, which has not been addressed in the existing literature. By integrating these factors, the study offers a comprehensive framework for understanding the dynamics that influence SMPP from financial, technological and marketing perspectives, particularly in developing economies like Tanzania.

Details

IIMBG Journal of Sustainable Business and Innovation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2976-8500

Keywords

Open Access
Article
Publication date: 28 June 2022

Sahar Jawad, Ann Ledwith and Rashid Khan

There is growing recognition that effective project control systems (PCS) are critical to the success of projects. The relationship between the individual elements of PCS and…

1977

Abstract

Purpose

There is growing recognition that effective project control systems (PCS) are critical to the success of projects. The relationship between the individual elements of PCS and successfully achieving project objectives has yet to be explored. This research investigates the enablers and barriers that influence the elements of PCS success and drive project objectives.

Design/methodology/approach

This study adopts a mixed approach of descriptive analysis and regression models to explore the impact of six PCS elements on project outcomes. Petroleum and chemical projects in Saudi Arabia were selected as a case study to validate the research model.

Findings

Data from a survey of 400 project managers in Saudi’s petroleum and chemical industry reveal that successful PCS are the key to achieving all project outcomes, but they are particularly critical for meeting project cost objectives. Project Governance was identified as the most important of the six PCS elements for meeting project objectives. A lack of standard processes emerged as the most significant barrier to achieving effective project governance, while having skilled and experienced project team members was the most significant enabler for implementing earned value.

Practical implications

The study offers a direction for implementing and developing PCS as a strategic tool and focuses on the PCS elements that can improve project outcomes.

Originality/value

This research contributes to project management knowledge and differs from previous attempts in two ways. Firstly, it investigates the elements of PCS that are critical to achieving project scope, schedule and cost objectives; secondly, enablers and barriers of PCS success are examined to see how they influence each element independently.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988