Article
Publication date: 17 May 2022

Ruchini Senarath Jayasinghe, Raufdeen Rameezdeen and Nicholas Chileshe

The reverse logistics supply chain (RLSC) for demolition waste management (DWM) is a complex process that inherits significant interdependent risks. However, studies on the RLSC…

Abstract

Purpose

The reverse logistics supply chain (RLSC) for demolition waste management (DWM) is a complex process that inherits significant interdependent risks. However, studies on the RLSC have not explicitly identified the risks of its inter-relationships by disentangling their effects on operational performance. Accordingly, this paper aims to identify and assess the inter-dependencies of the risks in the RLSC to improve quality-related operational performance.

Design/methodology/approach

A sequential exploratory mixed-method research approach, consisting of qualitative and quantitative methods, was employed. The qualitative approach involved 25 semi-structured interviews, whereas the 18 subsequent structured interviews were conducted with stakeholders in the entire RLSC as part of the quantitative method. These were used to identify the cause and effect relationships of the identified risks. The data were analysed using thematic analysis, and the Bayesian belief network (BBN) technique was used to develop a conceptual risk model.

Findings

In total 20 risks in four RLSC sub-processes, namely, dismantling and on-site process, off-site resource recovery process, marketing of secondary products and residue disposal, emerged. Among cause and effect relationships of identified risk factors, inferior quality of secondary products was found to have the strongest relationship with customer satisfaction. Under-pricing of dismantling job, improper landfill operations and inadequacy of landfill levy are independent risks that initiate other risks down the supply chain. The aggregate effects of these risks affect customer dissatisfaction of the end-product, as well as health and safety risks in on-site, off-site and residue disposal.

Research limitations/implications

This study only identify the cause and effect relationships of the identified risks within the RLSC for DWM operations. It has not targeted a specific construction material or any secondary production, which could be practiced through a case study in future research.

Practical implications

The results encourage the investigation of RLSC process quality by maintaining the relationship between recycler and customer to enable a safe workplace environment. Hence, the role of relevant practitioners and government is inseparable in supporting decision-making. Future research could discuss the impact of those inter-related risks in relation to time- or cost-related operational performance criteria.

Originality/value

This study contributes to the field through presenting the first major study on the identification and assessment of the inter-dependencies of the risks in the RLSC in South Australia. The RLSC process mapping had been identified as a tactical and operational management approach. However, the risk management process is a strategic management approach. Therefore, the integration of both process mapping and the risk management approaches in one platform is germane to construction management research.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 15 April 2024

Tennakoon Mudiyanselage Maheshi Pabasara Tennakoon, Nicholas Chileshe, Raufdeen Rameezdeen, J. Jorge Ochoa and Aparna Samaraweera

Offsite construction (OC) is an efficient method to reduce waste in the construction industry from a circular economy perspective. Yet, its uptake is subdued by the ambiguities…

Abstract

Purpose

Offsite construction (OC) is an efficient method to reduce waste in the construction industry from a circular economy perspective. Yet, its uptake is subdued by the ambiguities around its supply chain. Hence, the purpose of this study is twofold: to identify the OC project delivery models, the limitations in their procurement approach to facilitate the resilience of the supply chain and interventions to promote supply chain resilience (SCR) and to identify the gaps in the existing procurement process and propose further research areas that implement strategies to improve SCR.

Design/methodology/approach

The study was conducted as a systematic literature review. In total, 41 peer-reviewed research papers published between 2013 and 2023 were shortlisted through the preferred reporting items for systematic reviews and meta-analysis guidelines. A descriptive analysis was conducted, followed by a thematic analysis.

Findings

The descriptive analysis reveals that the emphasis on digitising OC has shifted to transforming the business model, procurement and supply chain with a human-centric view. In thematic analysis, the predictability of the SC partners and the probabilities of evaluating the prospects are revealed as arbitrary characteristics in the current procurement strategies. Rewarding collaborative relationships among SC partners and incorporating provisions to postpone the module delivery are some interventions to promote flexibility. Drafting comprehensive and effective contracts that address transparency issues and facilitating the need for continuous development of capabilities through procurement are among the further research avenues proposed.

Originality/value

This study is a precursor demonstrating the potential of the procurement process to implement the decrees of SCR for better goal congruence of the OC supply chain.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 24 August 2023

Tennakoon Mudiyanselage Maheshi Pabasara Tennakoon, Nicholas Chileshe, Raufdeen Rameezdeen, Jorge Ochoa Paniagua, Aparna Samaraweera and Larissa Statsenko

This paper aims to synthesise the latest literature on supply chain operations of offsite manufacturing in the construction industry to identify and evaluate the uncertainties at…

Abstract

Purpose

This paper aims to synthesise the latest literature on supply chain operations of offsite manufacturing in the construction industry to identify and evaluate the uncertainties at each stage of the offsite construction supply chain (OSC-SC) to compile contributions to knowledge and thereby determine the future research directions to improve supply chain resilience (SCR).

Design/methodology/approach

The study was conducted as a systematic literature review. In total, 99 peer-reviewed journal papers published between 2015 and mid-2022 were shortlisted and analysed through the Preferred Reporting Items for Systematic Reviews and Meta-Analyses guidelines.

Findings

The bibliometric analysis revealed that the research focusing on supply chain issues and developing best practices in offsite construction adopt case study approaches to investigate the research problems comprehensively. The content analysis revealed the lack of up-to-date knowledge in the construction workforce regarding OSC; low preparedness for the changes brought by the SC uncertainties; the lack of a proper procurement model for OSC; lack of end-to-end visibility of the supply chain to identify uncertainties and lack of national or government standards on OSC-SC, as some of the key problems instigating the identified the uncertainties.

Originality/value

This study clarifies the current knowledge by systematically presenting uncertainties at each stage of the OSC-SC. Moreover, it provides a framework and proposes that future research should focus specifically on individual/team, organisational, supply chain/network and sector/national/supranational levels to improve SCR.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 18 April 2023

Gihan Anuradha Tennakoon, Raufdeen Rameezdeen and Nicholas Chileshe

Timber waste from construction is downcycled into non-structural products, incinerated for energy generation or disposed of in landfills. Existing literature highlights that the…

Abstract

Purpose

Timber waste from construction is downcycled into non-structural products, incinerated for energy generation or disposed of in landfills. Existing literature highlights that the use of reprocessed timber for structural purposes is limited. Therefore, this study aims to focus on identifying factors limiting reprocessed structural timber (RST) uptake amongst construction professionals in Australia.

Design/methodology/approach

Current literature shows that the use of reprocessed materials (RMs) depends on user-specific personal factors and broader contextual factors. Therefore, data collection and analysis were based on the attitude-behaviour-context (ABC) theory, which affirms this relationship between personal and contextual factors in determining pro-environmental behaviours (PEBs). A qualitative research approach was adopted, considering limitations with industry expertise and the need for developing an in-depth understanding of limiting factors. Twenty semi-structured interviews were conducted amongst construction professionals experienced in using reprocessed materials, while the thematic analysis technique was used to analyse interview findings.

Findings

Personal factors that limit the uptake of RST include negative cost and quality perceptions, risk appetite, the tendency to maintain the status-quo, limited decision-making capability and lack of skills and expertise, while contextual factors include higher prices, poor and uncertain quality, limitations with information availability, under-developed supply and drawbacks in the regulatory environment.

Originality/value

The current study is amongst the first to explore the uptake of reprocessed timber for structural uses in Australia. The findings can be utilised to create a stronger demand for RST by directly addressing personal and contextual factors that constrain construction professionals from using RST.

Details

Built Environment Project and Asset Management, vol. 13 no. 3
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 10 May 2022

Xiao-Long Gan, Kexin Xie, Hanqiu Liu, Raufdeen Rameezdeen and Tao Wen

The purpose of this paper is to analyse the policy instruments used by the China's Government on prefabricated construction (PC) development, with the aim to clarify the pattern…

Abstract

Purpose

The purpose of this paper is to analyse the policy instruments used by the China's Government on prefabricated construction (PC) development, with the aim to clarify the pattern and discover the focus of the policy instruments using the methods of bibliometric analysis and content analysis.

Design/methodology/approach

Through a thorough screening by all researchers, 25 policies were identified from 1995 to 2021 were selected and analysed. The external attribute analysis clarified the issuing year, organisation, and the format of each policy. The content analysis was adopted firstly to analyse the policy instrument. An analysis framework including environmental instruments, supply instruments and demand instruments was applied in categorising and counting of each policy instrument. The bibliometric analysis was then carried out to extract keywords of the policy instruments, construct a co-word network and complete the cluster analysis.

Findings

The results indicate that the policies lack consistency and had relatively low authority. The results of content analysis show that the policy system relies heavily on environmental and supply instruments, whilst the use of demand instruments seems to be grossly inadequate. The results of the bibliometric analysis identify the core ideas of each policy instrument category, discuss the existing problems and then put forward the corresponding countermeasures.

Research limitations/implications

This study comprehensively and systematically analysed the policy instruments on facilitating the development of PC in China which broaden the research perspectives of the PC development by introducing the methods of political science. The research findings afford helpful information for future policy adjustments and elucidate the effective delivery of policies to facilitate PC development for developing countries.

Originality/value

This study provides an in-depth understanding of policy instruments used by China's Government on PC development. By integrating the policy instrument analysis framework into the mixed methods of content analysis and bibliometric analysis, this study provides an innovative way to conduct policy instrument analysis.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Content available
Article
Publication date: 15 August 2022

Safowaa Osei-Tutu, Joshua Ayarkwa, Dickson Osei-Asibey, Gabriel Nani and Aba Essanowa Afful

This study aimed to identify barriers impeding circular economy (CE) uptake in the construction industry in literature, categorize them for the development of a framework and to…

Abstract

Purpose

This study aimed to identify barriers impeding circular economy (CE) uptake in the construction industry in literature, categorize them for the development of a framework and to seek the interrelationships among the categorized barriers. This allowed for identifying integrated solutions to holistically address the barriers. The study also sought to identify the “hot” themes, the knowledge gaps and future research directions on barriers impeding CE.

Design/methodology/approach

Forty-eight relevant articles were desk reviewed from different construction peer-reviewed journals and published conference papers. A scientometric analysis allowed for co-occurrence of keywords relating to CE. A content analysis enabled the identification of 79 barriers impeding the uptake of CE in the construction industry which were further categorized into six distinct categories for the development of a framework showing the interrelationships among the categorized barriers.

Findings

The identified barriers include construction sector inertia, lack of design standards, lack of knowledge, awareness and understanding, design cost, and perception of second-hand materials as substandard among others. The study categorized the identified barriers for better understanding into six different groups: cultural barriers, social barriers, environmental barriers, economic barriers, technical barriers and technological barriers. Strategies to address the barriers were also proposed. The interrelationships among the various barriers were also shown in a proposed framework to educate professionals on the interconnectivity of the barriers.

Practical implications

Categorization of the various barriers impeding CE uptake contributes to the body of knowledge. Also, the interrelationships among the various categorized barriers in the framework will enable construction professionals make informed decisions regarding the successful integration of CE in the industry, better appreciate the barriers that impede CE uptake and apply strategies to holistically address the barriers. This will expand current knowledge outside the narrow scope of isolated barriers.

Social implications

To the global construction industry, the review presents a list of barriers and their interrelationships that could provide implementation strategies for the uptake of CE in the industry.

Originality/value

The geographical scope of this study is not limited, and therefore encourages wide applicability of the findings to the global construction industry.

Details

Smart and Sustainable Built Environment, vol. 12 no. 4
Type: Research Article
ISSN: 2046-6099

Keywords