Search results

1 – 10 of 33
Article
Publication date: 8 March 2022

Augustine Senanu Komla Kukah, De-Graft Owusu-Manu, Edward Badu and David John Edwards

In comparison to other countries, power generation in Sub-Saharan Africa is poor. The demand for power has surged in recent times and continues to increase at a fast rate. The…

Abstract

Purpose

In comparison to other countries, power generation in Sub-Saharan Africa is poor. The demand for power has surged in recent times and continues to increase at a fast rate. The public–private partnership (PPP) model has been identified as an option to address the challenges in the power sector. The purpose of this research paper is to critically explore the reasons for entering into PPP power projects in Ghana by the public and private parties.

Design/methodology/approach

Questionnaires were used to elicit responses from respondents using a two-round Delphi survey. From 60 respondents contacted in round one, 48 responses were obtained, and these 48 respondents further took part in round two. Mean score ranking was used to rank the reasons for entering into PPP power projects, while analysis of variance (ANOVA) was run to test significant difference in perceptions among the respondents.

Findings

From round 2 of the Delphi survey, the significant reasons for public sector entering into PPP power projects were as follows: achieving improved value for money, access to additional capital, increased certainty of projects and greater efficiency of project delivery services. For private sector, most significant reasons were as follows: obtaining of investment support, improvement in private sector’s international image and synergy with public sector. From ANOVA analysis, there were significant different perceptions among some of factors on the respondent profile variables and the reasons for entering into PPP power projects, while other factors did not have significant different perception.

Originality/value

Significant reasons for both public and private sectors identified would be incorporated by the government when PPP policy guidelines and laws are reviewed. This will aid in the effective implementation of PPP for power projects.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 10 March 2022

Huimin Li, Chenchen Xu, Yongchao Cao and Chengyi Zhang

The purpose of this paper is twofold: first, it explores the influencing factors of the government’s trust decision-making in the private sector; second, it explores how these…

Abstract

Purpose

The purpose of this paper is twofold: first, it explores the influencing factors of the government’s trust decision-making in the private sector; second, it explores how these influencing factors affect the government’s trust decisions.

Design/methodology/approach

A theoretical model was established, and a questionnaire survey was conducted among 152 professionals. The collected datas were analyzed by the structural equation modeling (SEM) method.

Findings

The study identified four critical factors that influence the government’s decision to trust the private sector in public-private-partnership (PPP) projects. All the four factors have a positively correlated impact on the government’s trust decision-making. The structural equation path analysis shows that the most important factor affecting the government’s trust decision-making is the trustee’s (private sector) trustworthy characteristics, and the path coefficient is 0.92. The path coefficients of risk perception and the trustor’s trust tendency are 0.83 and 0.74, respectively. The influence of the legal system environment on government trust decision-making is moderate, with a path coefficient of 0.68.

Originality/value

This paper contributes to the literature in two aspects. First, the factors influencing decision-making to government trust in the private sector in PPP projects have been identified. Second, a comprehensive view of the mechanism of government trust in the private sector in PPP projects has been theorized by the SEM method.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 27 July 2022

Augustine Senanu Komla Kukah, De-Graft Owusu-Manu, Edward Badu and David John Edwards

Demand for private investment in infrastructure, notably in the power sector remains high, and this is anticipated to expand with the passage of time. Very little research…

Abstract

Purpose

Demand for private investment in infrastructure, notably in the power sector remains high, and this is anticipated to expand with the passage of time. Very little research currently exists on the power sector and specifically the private sector influencing factors (PSIFs) for entering into public–private partnerships (PPPs). The purpose of this study is to explore influencing factors for private sector participation in PPP power projects in Ghana.

Design/methodology/approach

Using purposive and snowball sampling techniques, questionnaires were used to gather responses from experts in the PPP power sector domain in a two-round Delphi survey. Reliability analysis was conducted using Cronbach’s alpha coefficient and level of agreement tested using Kendall’s concordance. Mean score ranking, analysis of variance (ANOVA) and Chi-square test were the main analysis conducted on the influencing factors.

Findings

The most significant PSIFs were: obtaining of investment support; improvement in private sector’s international image; synergy with public sector; sharing of risks; and gaining of profits. From ANOVA results, all the influencing factors had no significant different perception between the number of years in PPP practice and the motivations for the private sector entering into PPP power projects. Using Chi-square, the association between the variables indicated they were statistically significant.

Practical implications

The findings in this study are significant for multinational power generation firms that seek to enter the Ghanaian energy sector to help fill the generation gap and deficit.

Originality/value

The output of this research contributes to the checklist of influencing factors for private sector participation in PPP power projects and enhances the development of PPP practice.

Details

Journal of Facilities Management , vol. 22 no. 2
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 28 November 2022

Jiaqi Liu and Jicai Liu

This paper aims to determine the demand category and level of government and investors in public–private partnership (PPP) projects. It emphasizes the importance of meeting the…

Abstract

Purpose

This paper aims to determine the demand category and level of government and investors in public–private partnership (PPP) projects. It emphasizes the importance of meeting the demands of stakeholders and controlling the unreasonable demands. This study aims to improve the demand management of stakeholders in the PPP project and lay a foundation for the research on behavior based on the motivation theory.

Design/methodology/approach

This paper opted for a questionnaire survey to collect data based on indicators identified through literature. The participants come from the government and private sector (investors, contractors, operators, etc.) in China PPP Lecture Hall. The reliability, validity and variance analyses are used to test the reliability of data. Factor analysis and entropy method are used to determine demand categories and weights.

Findings

The government’s 14 demands are divided into four groups: satisfy public activities, self-interest, responsibility and relief financial pressure; 6 investor's demands are divided into development ability and satisfy social activities. The self-interest of government is higher than that of the publicity in PPP projects; investor's social reputation is most important, it is a foundation for obtaining external resources and achieving enterprise development.

Research limitations/implications

Because of the chosen research approach, the demand indexes cannot be exhausted. Therefore, researchers are encouraged to enrich relevant contents further.

Practical implications

This paper includes implications for a targeted demand control mechanism and for managing the unreasonable demand.

Originality/value

This paper comprehensively identifies the demand hierarchy of the government and investors, and provides the theoretical basis for the target management of stakeholders.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 15 December 2022

Cong Wang, Henry Liu, Michael C.P. Sing and Jin Wu

Pre-construction of a project comprises stages that are pivotal for the procurement performance. It is defined as the duration from the project's initiation to construction…

Abstract

Purpose

Pre-construction of a project comprises stages that are pivotal for the procurement performance. It is defined as the duration from the project's initiation to construction. However, Private Public Partnerships (PPPs) have been subjected to a long pre-construction, thereby leading to an inefficient development process. Therefore, the purpose of this paper is to pay attention to the influencing factors elongating the pre-construction duration.

Design/methodology/approach

Based on data of 5,677 PPP projects between 2009 and 2021 in China, the authors adopt the Accelerated Failure Time (AFT) model in duration analysis to empirically analyze the following underlying dynamics determining the duration of PPP pre-construction stages: (1) policy uncertainty; (2) corruption; and (3) procurement method selection. To observe the influencing paths more specifically, the authors divided the pre-construction duration into the pre-tendering period and tendering period and regressed them separately.

Findings

The results indicate that the pre-construction duration is significantly prolonged with increased policy uncertainty and corruption degree as well as the use of tendering methods. Meanwhile, the above factors have a greater impact on the pre-tendering period than the tendering period.

Originality/value

The contribution of this study is twofold: (1) theoretically, this paper provides new evidence on the impact of PPP policy uncertainty, corruption and procurement method selection on the pre-construction duration. It complements empirical studies on the factors elongating the time efficiency of PPPs projects. (2) In practice, it provides a specific path for the government to improve the time efficiency of PPPs.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 12 April 2024

Rogers Mwesigwa, Gonzaga Basulira, Joseph Mayengo and Jude Thadeo Mugarura

This study aims to examine the association between community engagement, community commitment and sustainability of public–private partnership (PPP) projects in Uganda.

Abstract

Purpose

This study aims to examine the association between community engagement, community commitment and sustainability of public–private partnership (PPP) projects in Uganda.

Design/methodology/approach

This study adopted a cross-sectional and quantitative approach. Data were collected using a questionnaire from 42 PPP projects in Uganda.

Findings

The study found that community engagement and commitment are all positively and significantly associated with the sustainability of PPP projects in Uganda. Results also show that community commitment mediates community engagement and project sustainability.

Research limitations/implications

The study results imply that for sustainability to be achieved, communities must be engaged in project activities such as planning, design and implementation to boost their commitment to project sustainability.

Originality/value

The sustainability of PPP projects is an emerging phenomenon. This paper contributes to scanty literature on ensuring the sustainability of PPP projects from a developing country’s perspective.

Details

Journal of Management Development, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0262-1711

Keywords

Article
Publication date: 28 March 2022

Muhammad Ayat, Azmat Ullah and Changwook Kang

The primary purpose of this study is to explore the relationship between the unsolicited proposal (USP) and the performance of private participation infrastructure (PPI) projects…

Abstract

Purpose

The primary purpose of this study is to explore the relationship between the unsolicited proposal (USP) and the performance of private participation infrastructure (PPI) projects in developing countries.

Design/methodology/approach

The main data set for this study was collected from the World Bank database consisting of 8,951 PPI projects that occurred in developing countries from 1996 to 2020. Hierarchical logistic regression was applied for investigating the effects of USPs on project success. Three moderators, namely, control of corruption, presence of local sponsor and project size were also included in the model to test the impact of their interactions with the USP on the performance of PPI projects. Further, to assess the impact of the effect of USPs, the average marginal effect was calculated. The framework used in this study consists of 18 control variables, three moderators and one noncontrolled independent variable (the USP).

Findings

The results of hierarchical logistic regression indicate that USPs have a significant and negative effect on the success of PPI projects occurring in developing countries. The negative effect of a USP weakens with the presence of local sponsors and stronger control of corruption in the host country. However, contrary to the authors’ expectations, the results show that project size does not significantly affect the association between USPs and the success of PPI projects. Moreover, the results of average marginal effects show that the negative impact of USP on the success of PPI projects ranges between 2.4% and 3.8%.

Originality/value

This study quantifies the negative impact of USP on the success of PPI projects in developing countries, which will be helpful for the practitioners to understand the associated risk with USP projects. Furthermore, it also identifies the moderating roles of control of corruption and the presence of local sponsors on the relationship between USP and the success of PPI projects.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 30 April 2024

Junesoo Lee

This article conceptualizes and constructs a comprehensive framework that can better help to answer that question – Who is accountable for social and public problems?  

Abstract

Purpose

This article conceptualizes and constructs a comprehensive framework that can better help to answer that question – Who is accountable for social and public problems? – theoretically and practically.

Design/methodology/approach

Tracing the drivers behind two phenomena “accountability hole” and “accountability black hole”, stemming from “pushing power game” and “pulling power game”, respectively, this study considers (1) the three actors of society: citizens (civil society), corporations (market) and civil servants (government), and (2) the principal-agent relationship between the three actors in the face of social and public problems. As a result, the 4CAs framework that contains the three actors’ collaborative accountabilities to one another is presented.

Findings

The 4CAs model emphasizes (1) all three actors function as agents that are accountable to one another, (2) collaborative accountability beyond collaborative governance and (3) repowering citizens and corporations beyond just empowering them, i.e. returning their inherent rights and obligations to serve one another.

Originality/value

The 4CAs model may function as a descriptive and prescriptive lens through which the trilemma between market failure, government failure and citizen failure can be re-assessed and balanced. The model can also be used as a set of indicators for assessing and helping a society to better resolve the social and public problems collectively.

Details

International Journal of Public Sector Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0951-3558

Keywords

Article
Publication date: 11 April 2024

Yun Li, Zhe Cheng, Jiangbin Yin, Zhenshan Yang and Ming Xu

Infrastructure financialization plays a critical role in infrastructure development and urban growth around the world. However, on the one hand, the existing research on the…

Abstract

Purpose

Infrastructure financialization plays a critical role in infrastructure development and urban growth around the world. However, on the one hand, the existing research on the infrastructure financialization focuses on qualitative and lacks quantitative country-specific studies. On the other hand, the spatial heterogeneity and influencing factors of infrastructure financialization are ignored. This study takes China as a typical case to identify and analyze the spatial characteristics, development process and impact factors of infrastructure financialization.

Design/methodology/approach

To assess the development and characteristics of infrastructure financialization in China, this study constructs an evaluation index of infrastructure financialization based on the infrastructure financialization ratio (IFR). This study then analyzes the evolution process and spatial pattern of China's infrastructure financialization through the spatial analysis method. Furthermore, this study identifies and quantitatively analyzes the influencing factors of infrastructure financialization based on the spatial Dubin model. Finally, this study offers a policy suggestion as a governance response.

Findings

The results demonstrate that infrastructure financialization effectively promotes the development of infrastructure in China. Second, there are significant spatial differences in China’s infrastructure financialization. Third, many factors affect infrastructure financialization, with government participation having the greatest impact. In addition, over-financialization of infrastructure has the potential to lead to government debt risks, which is a critical challenge the Chinese Government must address. Finally, this study suggests that infrastructure financialization requires more detailed, tailored,and place-specific policy interventions by the government.

Originality/value

This study not only contributes to enriching the knowledge body of global financialization theory but also helps optimize infrastructure investment and financing policies in China and provides peer reference for other developing countries.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Expert briefing
Publication date: 1 May 2024

The plan envisages a massive expansion of geothermal energy, through the sinking of 57 new wells across six major steam fields, which would make Kenya the world’s fourth-largest…

Details

DOI: 10.1108/OXAN-DB286774

ISSN: 2633-304X

Keywords

Geographic
Topical
1 – 10 of 33