Search results

1 – 10 of 27
Open Access
Article
Publication date: 26 June 2023

Petter Haglund and Mats Janné

The construction industry shows an increased interest in how to manage logistics within construction projects. Often construction logistics is outsourced to a logistics service…

1159

Abstract

Purpose

The construction industry shows an increased interest in how to manage logistics within construction projects. Often construction logistics is outsourced to a logistics service provider (LSP). However, construction logistics is normally approached either as a strategic decision or as an operational issue and rarely as a tactical concern. The purpose of this study is to explore how to organize the logistics outsourcing decision at strategic, tactical and operational levels.

Design/methodology/approach

This study is performed as a single-case study within a construction corporation, containing (amongst others) a building contractor (BC) and a construction equipment rental company (CERC) offering logistics services.

Findings

The study shows that to procure construction logistics service successfully, BCs need logistics capabilities at strategic and tactical levels to maintain an alignment between the use of logistics services and operational characteristics. Simultaneously, CERC’s need to design their service offerings to correspond to the needs of the BC.

Research limitations/implications

This study builds on a single-case study of a Swedish construction corporation. Further research is needed to better understand current logistics outsourcing and development practices and how these can be improved to foster better logistics management at the project level.

Practical implications

BCs find suggestions of different logistics organization structures and suitable outsourcing arrangements. CERCs and LSPs can use the findings to understand their customers’ needs and adapt service offerings.

Originality/value

To the best of the authors’ knowledge, this study is one of the first studies of how two companies within a corporation can work together to develop construction logistics service offerings.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 17 March 2023

Charlotta Winkler

This paper aims to explore the process of implementing solar photovoltaic (PV) systems in construction to contribute to the understanding of systemic innovation in construction.

1091

Abstract

Purpose

This paper aims to explore the process of implementing solar photovoltaic (PV) systems in construction to contribute to the understanding of systemic innovation in construction.

Design/methodology/approach

The exploratory research presented is based on qualitative data collected in workshops and interviews with 76 construction- and solar-industry actors experienced in solar PV projects. Actor-specific barriers were identified and analysed using an abductive approach.

Findings

In light of established definitions of systemic innovation, the process of implementing solar PV systems in construction involves challenges regarding technical and material issues, competencies, and informal and formal institutions. The specificities of this case highlight the necessity of paying attention to details in the process and to develop knowledge of systemic innovation in construction since the industry’s involvement in addressing societal challenges related to the energy transition will require implementing such innovations much more in the future.

Practical implications

New knowledge of solar PV systems as an innovation in professional construction is collected, enabling the adaptation of management strategies for its implementation. This knowledge can also be applied generally to other challenges encountered in highly systemic innovation implementation. Solar industry actors can gain an understanding of solar-specific challenges for the construction industry, challenges for which they must adapt their activities.

Originality/value

The exploration of actor-specific experiences of solar PV projects has resulted in a novel understanding of this specific innovation and its implementation. The findings illustrate a case of a high level of systemic innovation and the need to use a finer-grained scale for classification when studying innovation in construction.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 19 March 2024

Mansoor Ahmed and Lorenzo Lucianetti

The research study provides empirical insights on the relationship between entrepreneurial leadership (EL), entrepreneurial passion for founding (EPF), entrepreneurial bricolage…

Abstract

Purpose

The research study provides empirical insights on the relationship between entrepreneurial leadership (EL), entrepreneurial passion for founding (EPF), entrepreneurial bricolage (EB) and project success (PS), in the case of freelancers. The study aims to get a better understanding of whether freelancers, who behave like entrepreneurial leaders, can successfully complete projects through EB.

Design/methodology/approach

The study collected data from 209 freelancers through snowball sampling, in two waves, with a time-lag of fourteen days, to better examine the causality of variables. Data were analyzed by Model No. 4 and 7 (i.e. mediation and moderation, respectively) of Process macro.

Findings

Drawing on the effectuation theory, the results show that EB mediates the relationship between EL and PS and EPF moderates this relationship.

Practical implications

The freelancers can formally establish businesses later, after knowing whether they can complete these new types of projects. These online freelancing platforms can provide special services to freelancers who first want to test their skills on unrelated projects. In sum, the paper suggests that freelancers can be successful entrepreneurial leaders.

Originality/value

The EL, EPF, EB and PS are studied in the context of the informal sector, i.e. freelancing, which is the emerging working style in the world. It provides an in-depth understanding of phenomena in freelancers that lacks background literature.

Details

Journal of Small Business and Enterprise Development, vol. 31 no. 8
Type: Research Article
ISSN: 1462-6004

Keywords

Open Access
Article
Publication date: 1 August 2023

Jacob Guerrero and Susanne Engström

By adopting the “hard” and “soft” project management (PM) approaches from the PM-literature, this paper aims to problematize the expected role of client organizations in driving…

Abstract

Purpose

By adopting the “hard” and “soft” project management (PM) approaches from the PM-literature, this paper aims to problematize the expected role of client organizations in driving innovation in the transport infrastructure sector.

Design/methodology/approach

Addressing a large public client in Sweden, a case study design was initially applied to provide in-depth insights and perspectives of client project managers’ views and experiences of managing projects expected to drive innovation. In this paper, the concepts of “hard” and “soft” are used to discuss empirical findings on challenges associated with adopting a PM-approach for driving innovation in projects. The empirical material consists of interview data, complemented with observations and archival data.

Findings

Findings reveal challenges associated with combining hard and soft approaches, frequently demonstrating difficulties in balancing short-term project expectations with the promotion of innovation. In line with the literature, project managers note that there is a need for soft approaches to promote development and drive innovation. Yet, findings reflect a situation in which operational success criteria predominate, whereas soft approaches are not sufficiently used to create the grounds required for fostering innovation.

Originality/value

Insights are provided into how PM-approaches may impact construction innovation in the infrastructure sector, demonstrating a need for further research on the challenges and implications of applying and combining hard and soft PM-approaches.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 3 July 2023

Siraj Ahmed, Jukka Majava and Kirsi Aaltonen

The purpose of this study is to investigate the benefits and challenges of implementing circular economy (CE), as well as shed light on the influence of procurement strategy in CE…

3429

Abstract

Purpose

The purpose of this study is to investigate the benefits and challenges of implementing circular economy (CE), as well as shed light on the influence of procurement strategy in CE implementation in construction projects.

Design/methodology/approach

A qualitative research approach with abductive reasoning was adopted. The empirical data were collected from the construction industry in the United Arab Emirates (UAE).

Findings

The results reveal that clients, consultants and contractors have limited awareness, knowledge and motivation to implement CE in construction projects. The absence of incentives to design projects following CE principles, lack of involvement of contractors and suppliers, non-use of materials that use CE principles and current procurement strategies are the main challenges for the implementation of CE in the UAE.

Originality/value

Previous research offers limited knowledge on CE and its implementation in construction projects particularly from a procurement strategy perspective. The findings of the study provide new knowledge of the benefits, challenges and role of procurement strategy for implementing CE. It is suggested that collaborative and partnering-based procurement methods are needed to facilitate the effective implementation of CE.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Abstract

Details

Journal of Financial Reporting and Accounting, vol. 22 no. 2
Type: Research Article
ISSN: 1985-2517

Open Access
Article
Publication date: 1 May 2024

Viktoria Rubin

With the rise of the gig economy, management positions are increasingly staffed with flexible labor, so-called interim managers. They plunge into organizations for a limited…

Abstract

Purpose

With the rise of the gig economy, management positions are increasingly staffed with flexible labor, so-called interim managers. They plunge into organizations for a limited period, operating in a liminal position as partly insider, partly outsider. Although several contributions to their client organizations are acknowledged, it is unknown how the interim manager’s knowledge from previous assignments is made useful in the new context under these particular working conditions. Therefore, the purpose of this paper is to increase the understanding of how the interim manager’s knowledge is transferred to the client organization while operating from a liminal position.

Design/methodology/approach

This paper presents an interview-based multiple case study of six interim assignments where knowledge transfer is considered a social and context-dependent process.

Findings

The findings unveil the multifaceted nature of the liminal position, which consists of task orientation, time limitation, political detachment and cultural distance. These facets contribute to knowledge transfer in terms of new shared understandings and joint interests, which in turn might create new practices that augment continuous knowledge-sharing patterns.

Originality/value

The results contribute to the research on flexible work arrangements by shedding light on how the liminal position, predominantly depicted as an obstacle for the individual, might facilitate knowledge transfer. Through the process of knowledge generation, it is shown how a short-term engagement might enable the organization to increase its knowledge over time.

Details

The Learning Organization, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-6474

Keywords

Open Access
Article
Publication date: 14 November 2023

Ylenia Curzi and Filippo Ferrarini

In the literature, evidence is to be found of the positive effect of high-performance work systems (HPWSs) on innovation in firms. However, innovation is enabled by not only human…

1588

Abstract

Purpose

In the literature, evidence is to be found of the positive effect of high-performance work systems (HPWSs) on innovation in firms. However, innovation is enabled by not only human resources but also digital technology, and scholars have called for further investigation into the interplay between digital technology and HRM systems. Drawing on signalling theory and HPWSs research, the purpose of this study is to explore the moderating role of digital technologies in the relationship between HPWSs and innovation in the firm and consider employee participation as an additional conditioning factor.

Design/methodology/approach

This study uses data from the European Company Suvery 2019 administered in a sample of more than 20,000 European establishments and applies logistic regression with a three-way interaction.

Findings

HPWSs underpin product and process innovation. Moreover, this study shows that in firms with low levels of employee participation, digital technology enhances the effect of HPWSs on innovation, while in firms with high levels of employee participation, this effect is reduced.

Originality/value

This study enriches the scholarly discussion about the link between HPWSs and innovation in the firm, by investigating in theoretical and empirical terms the moderating effect of digital technology, underlining that either positive or negative synergistic effects are possible. By adding employee participation to the analysis, the authors cast light on an important boundary condition for understanding when the synergic effects become more prominent. This intends to respond to recent calls from scholars and practitioners for more insight into the precise nature of the synergies between HPWSs and digital technology on innovation in the firm, with important implications for management.

Open Access
Article
Publication date: 7 May 2024

Yazeed A. Alragabah and Mohd. Ahmed

There is a limited number of research work on critical success factors (CSFs) in public construction projects in Saudi Arabia. In response to this knowledge gap, the objective of…

Abstract

Purpose

There is a limited number of research work on critical success factors (CSFs) in public construction projects in Saudi Arabia. In response to this knowledge gap, the objective of this paper is to assess the impact of CSFs on the government construction projects in Saudi Arabia. The success factors are investigated from a broader consideration of failure criteria, from consideration of most effectiveness in successful project completion and also from consideration of the impact of implementing control processes for successful project completion.

Design/methodology/approach

This study has analysed the impact of success factors on construction projects in Saudi Arabia using a descriptive methodology. An exhaustive literature survey is undertaken to identify the success and failure factors related to government construction projects in Saudi Arabia. The survey data are sorted out and analysed by cost, schedule, technical, context and finance dimensions of the projects based on project types, engineering complexity, size, modality, jurisdictional control and funding approach. To evaluate the influence of success factors implementation, qualitative data were collected in a survey via a web-based questionnaire that was sent to officials working and occupying a responsible position in national project guidelines organizations and in government construction organizations in Saudi Arabia. In all, 28 CSFs were identified, ranked and evaluated for their impact on project success. The four identified factors belong to process categories of construction projects, nine factors belong to management of construction projects and 15 success factors are identified for impact assessment of implementation in construction projects.

Findings

The study's findings have identified and ranked the top five CSFs that significantly influence project outcomes, including meeting time targets, adhering to financial budgets, delivering desired outcomes for all stakeholders, effectively managing risks and assembling the appropriate team while optimizing resource allocation. Additionally, the research indicates that hindrances to projects primarily stem from execution, economic, human and political factors. The study advocates for strict controls over incomplete engineering designs and advises against contractors independently handling design work to ensure project success. Additionally, addressing contractors' qualifications and financial matters is crucial for project success. By highlighting these CSFs and challenges, the research provides actionable insights to enhance project management practices in the construction industry.

Research limitations/implications

This study is limited to the infrastructure projects constructed by governmental bodies with the participation of officials from government organizations. Further study, including private projects and officials working on private projects, may be needed to generalized the research outcome.

Originality/value

Numerous studies have investigated CSFs in construction projects, but few have examined their relevance to Saudi Arabian government projects. This study aims to fill this gap by identifying key CSFs specific to Saudi Arabian public sector construction projects and assessing their impact on project success. It advocates for stringent controls in the Saudi Arabian construction sector, emphasizing the importance of preventing incomplete or altered engineering designs by contractors to increase the success rate of public sector projects. This research offers practical insights to stakeholders, advancing project management practices in Saudi Arabia's construction sector for improved outcomes and resource utilization.

Details

Frontiers in Engineering and Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2634-2499

Keywords

Open Access
Article
Publication date: 15 May 2023

Kai Hänninen, Jouni Juntunen and Harri Haapasalo

The purpose of this study is to describe latent classes explaining the innovation logic in the Finnish construction companies. Innovativeness is a driver of competitive…

16143

Abstract

Purpose

The purpose of this study is to describe latent classes explaining the innovation logic in the Finnish construction companies. Innovativeness is a driver of competitive performance and vital to the long-term success of any organisation and company.

Design/methodology/approach

Using finite mixture structural equation modelling (FMSEM), the authors have classified innovation logic into latent classes. The method analyses and recognises classes for companies that have similar logic in innovation activities based on the collected data.

Findings

Through FMSEM analysis, the authors have identified three latent classes that explain the innovation logic in the Finnish construction companies – LC1: the internal innovators; LC2: the non-innovation-oriented introverts; and LC3: the innovation-oriented extroverts. These three latent classes clearly capture the perceptions within the industry as well as the different characteristics and variables.

Research limitations/implications

The presented latent classes explain innovation logic but is limited to analysing Finnish companies. Also, the research is quantitative by nature and does not increase the understanding in the same manner as qualitative research might capture on more specific aspects.

Practical implications

This paper presents starting points for construction industry companies to intensify innovation activities. It may also indicate more fundamental changes for the structure of construction industry organisations, especially by enabling innovation friendly culture.

Originality/value

This study describes innovation logic in Finnish construction companies through three models (LC1–LC3) by using quantitative data analysed with the FMSEM method. The fundamental innovation challenges in the Finnish construction companies are clarified via the identified latent classes.

Access

Only content I have access to

Year

Last week (27)

Content type

1 – 10 of 27