1 – 10 of over 9000
Article
Publication date: 2 March 2023

B.H.V.H. Jayamaha, B.A.K.S. Perera, K.D.M. Gimhani and M.N.N. Rodrigo

Enterprise resource planning (ERP) systems that are equipped with numerous features and functionalities help to improve the profitability of construction corporations around the…

Abstract

Purpose

Enterprise resource planning (ERP) systems that are equipped with numerous features and functionalities help to improve the profitability of construction corporations around the world through enhancing the efficiency of the functions related to cost management. Thus, the purpose of this study was to investigate the applicability of ERP systems for cost management of building construction projects in Sri Lanka.

Design/methodology/approach

A qualitative technique was used in this study, which comprised two-round Delphi-based semistructured interviews. Purposive sampling was used to determine the interviewees. Content analysis was used to evaluate the collected data.

Findings

The findings of this study identified the ERP system as a strategic tool for gaining a competitive advantage for an organization while confirming 14 uses of ERP systems and 16 stages of the cost management process. Eighteen issues were finalized at the end of the interview rounds while categorizing the suitable ERP applications at each stage of the cost management process.

Originality/value

Even though there are numerous distinct studies conducted on cost management and ERP systems, there has been a lack of studies conducted on the synergy between these two areas that can be adapted for the building projects in the Sri Lankan context. Therefore, the findings of this study can bring a new paradigm to the Sri Lankan construction sector by influencing the adaption of correct ERP systems at numerous project stages by providing a competitive edge.

Details

Construction Innovation , vol. 24 no. 5
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 17 January 2024

Denise Rieg, Maria Laura Maclennan, Fernando Scramim, Melby Huertas and Eryka Augusto

This study aims to mitigate the inherent challenges associated with implementing project-based learning (PjBL) by integrating it with the service engineering methodology (SEEM)…

Abstract

Purpose

This study aims to mitigate the inherent challenges associated with implementing project-based learning (PjBL) by integrating it with the service engineering methodology (SEEM). The study demonstrates that combining PjBL with a methodological approach provides a step-by-step procedure that facilitates the practical application of PjBL and preserves the development of competencies inherent to PjBL.

Design/methodology/approach

Action research methodology was used to assess the effectiveness of combining PjBL learning strategy with SEEM. Data was collected through observations, questionnaires and focus group discussions to evaluate students’ expectations and perceptions of this combination.

Findings

The results show that PjBL implementation combined with SEEM enabled the organization of class dynamics, helping to mitigate difficulties encountered in the application of PjBL. Students conveyed that the integration of PjBL with SEEM afforded them a guiding structure without compromising their autonomy in decision-making for proposed solutions. It proved efficacious in honing skills pertinent to service design and analysis, teamwork, solution formulation, creativity and innovation stimulation.

Research limitations/implications

This research has been limited to four classes in one university in Brazil. Besides, PjBL was combined with only one methodology (SEEM). Therefore, this needs to be tested in broader settings and contexts.

Practical implications

The article highlights the potential benefits of PjBL in bridging the gap between academia and the professional world while acknowledging the challenges involved in its implementation, combining PjBL with a methodology that provides a sequence of steps to be followed.

Social implications

The social implications of implementing PjBL in higher education in the Brazilian and international contexts are multifaceted. The adoption of PjBL encourages instructors to adapt their learning strategies and align them with the evolving needs of worldwide society. Through PjBL, Brazilian and international higher education institutions may contribute to the development of individuals who are not only knowledgeable but also capable of applying their knowledge effectively in practical situations around the world.

Originality/value

The theoretical contribution lies in suggesting that combining PjBL with a methodology that provides a sequence of steps to be followed (such as that exemplified through SEEM) can address intrinsic issues that consider the complexity of PjBL implementation, preserving the development of competencies inherent to PjBL.

Details

Journal of International Education in Business, vol. 17 no. 2
Type: Research Article
ISSN: 2046-469X

Keywords

Article
Publication date: 11 April 2023

Mahipal Singh and Rajeev Rathi

The present environmental concern has enforced manufacturing firms to re-evaluate their business practices to reduce the adverse impact on the environment with optimum production…

Abstract

Purpose

The present environmental concern has enforced manufacturing firms to re-evaluate their business practices to reduce the adverse impact on the environment with optimum production. Therefore, the present study aims to deal with the implementation of the environmental lean six sigma (ELSS) framework in an Indian medical equipment manufacturing industry to obtain operational and environmental sustainability.

Design/methodology/approach

The proposed ELSS framework is based on the DMAIC (Define–Measure–Analyze–ImproveControl) methodology, sustainability and lean tools. The efficacy of the developed framework is tested through a case study in an Indian medical equipment manufacturing unit.

Findings

In the case company, four major issues were reported, i.e. improper material handling, non-productive movement of men and material, poor indoor air quality and rework. The ELSS project facilitates the case organization to enhance their capacity utilization from 59.25% to 74.3%, defects per million opportunities reduce from 309,523 to 48,951.44 and indoor air quality levels decrease from 156.87 to 86.85 µgm3.

Research limitations/implications

The efficacy of the developed ELSS framework is evaluated through a case study conducted only in one Indian manufacturing environment.

Practical implications

The present study facilitates industrial managers and practitioners to achieve sustainability and process excellence through ELSS implementation. Organizations that intend to simultaneously improve operational and environmental performance can benefit from this paper as it can be used as a guide to conduct similar projects with both operational and environmental benefits.

Originality/value

This paper presents a successful implementation of the ELSS framework in the healthcare industry to achieve operational and environmental sustainability.

Details

The TQM Journal, vol. 36 no. 1
Type: Research Article
ISSN: 1754-2731

Keywords

Open Access
Article
Publication date: 6 July 2023

Caroline Ingvarsson, Anette Hallin and Christof Kier

The purpose of this paper is to explore how gamification may be used for project stakeholder engagement.

2368

Abstract

Purpose

The purpose of this paper is to explore how gamification may be used for project stakeholder engagement.

Design/methodology/approach

The paper presents the results of a systematic literature review of extant research concerning the gamification of projects. Based on this, an agenda for future studies is outlined.

Findings

Extant research on the gamification of projects is scarce and scattered among various disciplines, but the engineering fields dominate. The research performed does indicate that gamification may be used for involving stakeholders in projects, primarily by promoting learning, but also by engaging them, motivating action and solving problems.

Research limitations/implications

In several cases, extant research display poor quality in research design and a lack in cross-disciplinary perspectives, which means that more research is needed. The users’ perspective is often lacking. Furthermore, the ideas gamification might be “hidden” within other technologies.

Practical implications

The findings of this research may assist project management practitioners in the endeavor of adopting gamification principles to better involve stakeholders.

Originality/value

The study fills a gap in summarizing the research on how gamification may be used to promote project stakeholder engagement. Based on this, it proposes a research agenda for future research on the use of gamification to promote project stakeholder engagement.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Content available
Book part
Publication date: 1 September 2024

Matthew W. Ragas and Ron Culp

Abstract

Details

Business Acumen for Strategic Communicators
Type: Book
ISBN: 978-1-83797-085-8

Open Access
Article
Publication date: 23 December 2022

Rouzbeh Shabani, Tobias Onshuus Malvik, Agnar Johansen and Olav Torp

Uncertainty management (UM) in projects has been a point of attention for researchers for many years. Research on UM has mainly been aimed at uncertainty analyses in the front-end…

2452

Abstract

Purpose

Uncertainty management (UM) in projects has been a point of attention for researchers for many years. Research on UM has mainly been aimed at uncertainty analyses in the front-end and managing uncertainty in the construction phase. In contrast, UM components in the design phase have received less attention. This research aims to improve knowledge about the key components of UM in the design phase of large road projects.

Design/methodology/approach

This study adopted a literature review and case study. The literature review was used to identify relevant criteria for UM. These criteria helped to design the interview guide. Multiple case study research was conducted, and data were collected through document study and interviews with project stakeholders in two road projects. Each case's owners, contractors and consultants were interviewed individually.

Findings

The data analysis obtained helpful information on the involved parties, process and exploit tools and techniques during the design phase. Johansen's (2015) framework [(a) human and organisation, (b) process and (c) tools and techniques)] was completed and developed by identifying relevant criteria (such as risk averse or risk-taker, culture and documentation level) for each component. These criteria help to measure UM performance. The authors found that owners and contractors are major formal UM actors, not consultants. Empirical data showed the effectiveness of Web-based tools in UM.

Research limitations/implications

The studied cases were Norwegian, and this study focussed on uncertainties in the project's design phase. Relevant criteria did not cover all the criteria for evaluating the performance of UM. Qualitative evaluation of criteria allows further quantitative analysis in the future.

Practical implications

This paper gave project owners and managers a better understanding of relevant criteria for measuring UM in the owners and managers' projects. The paper provides policy-makers with a deeper understanding of creating rigorous project criteria for UM during the design phase. This paper also provides a guideline for UM in road projects.

Originality/value

This research gives a holistic evaluation of UM by noticing relevant criteria and criteria's interconnection in the design phase.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Book part
Publication date: 17 November 2023

Simon Ofori Ametepey, Clinton Ohis Aigbavboa and Wellington Didibhuku Thwala

This section describes sustainable development (SD) in relation to infrastructure projects and explains how to evaluate SD. SD is assessed as context-dependent, considering the…

Abstract

This section describes sustainable development (SD) in relation to infrastructure projects and explains how to evaluate SD. SD is assessed as context-dependent, considering the project’s economic, social, and ecological context. Sustainable road infrastructure projects (SRIP) should encapsulate the complete life cycle from idea to development, functionality, and maintenance. SD should be considered as part of the evaluation process prior to project execution, but it can also serve other functions. Sustainability evaluation must start with project appraisal or evaluation and the earliest stages of project decision-making. Sustainable infrastructure projects (SIPs) are evaluated using a variety of techniques and models, such as cost-benefit analysis (CBA), multi-criteria techniques, ecological and societal impact assessments, ranking techniques, models, and evaluation guidelines. Established SD structures and modelling techniques for infrastructure projects are presented from an SD perspective, with the primary objective of investigating how they operate and determining whether existing models provide an effective method for applying the SD idea into infrastructure development. CBA is a widely used strategy for evaluating alternatives to maximize sociocultural well-being. It is based on the likelihood of costing customer advantages and negative impacts and has been discussed in scholarly articles. The multi-criteria decision analysis (MCDA) approach is an acceptable methodology for addressing complex matters involving high risk, conflicting objectives, different types of information and data, different concerns and points of view, and the representation of complex and evolving biological, ecological, and financial frameworks. It combines many methodologies and offers various advantages over more conventional ways of decision-making and plan development. It should be used to increase community participation and empower partner organizations and should apply several criteria at the same time, including those that are difficult to adjust and quantify. The key difficulty with this strategy is the usage of weightings, which has been sharply criticized by several researchers. Life-cycle assessment (LCA) is an adaptive tool used to assess the ecological effects of a particular action, task, or procedure. It is applied globally to decision-making in numerous fields, including transportation, energy, and water, and has become a typical tool for determining the ecological performance of infrastructure projects. However, it has a few flaws and could benefit from improvements to assess SD with greater precision. It is a fragmented mechanism for assessing the three components of SD, but its incorporation into other evaluation approaches is desirable. The evaluation of societal implications has been conducted using a variety of methods and techniques, but there is currently no standard method for assessing the communal and appropriation consequences of infrastructure initiatives. Social life-cycle assessments (SLCAs) are advancing, but consensus remains a challenge. The Evaluation Partnership and the Centre for European Policy Studies identified several obstacles and challenges to implementing an outstanding societal assessment, such as the term ‘societal impacts’ being potentially overbroad and not adequately defined, and the lack of a suitable method for quantitatively evaluating sociological effects. Additionally, a large section of societal assessments is biased and frequently inconsequential. The chapter discussed the theoretical and methodological stances on sustainable road infrastructure, using current SID concepts and evaluation techniques thoroughly.

Details

Sustainable Road Infrastructure Project Implementation in Developing Countries: An Integrated Model
Type: Book
ISBN: 978-1-83753-811-9

Keywords

Article
Publication date: 23 March 2023

Haftu Hailu Berhe, Hailekiros Sibhato Gebremichael and Kinfe Tsegay Beyene

Existing conceptual, empirical and case studies evidence suggests that manufacturing industries find the joint implementation of Kaizen philosophy initiatives. However, the…

1216

Abstract

Purpose

Existing conceptual, empirical and case studies evidence suggests that manufacturing industries find the joint implementation of Kaizen philosophy initiatives. However, the existing practices rarely demonstrated in a single framework and implementation procedure in a structure nature. This paper, therefore, aims to develop, validate and practically test a framework and implementation procedure for the implementation of integrated Kaizen in manufacturing industries to attain long-term improvement of operational, innovation, business (financial and marketing) processes, performance and competitiveness.

Design/methodology/approach

The study primarily described the problem, extensively reviewed the current state-of-the-art literature and then identified a gap. Based on it, generic and comprehensive integrated framework and implementation procedure is developed. Besides, the study used managers, consultants and academics from various fields to validate a framework and implementation procedure for addressing business concerns. In this case, the primary data was collected through self-administered questionnaire, and 244 valid questionnaires were received and were analyzed. Furthermore, the research verified the practicability of the framework by empirically exploring the current scenario of selected manufacturing companies.

Findings

The research discovered innovative framework and six-phase implementation procedure to fill the existing conceptual gap. Furthermore, the survey-based and exploratory empirical analysis of the research demonstrated that the practice of the proposed framework based on structured procedure is valued and companies attain the middling improvements of productivity, delivery time, quality, 5S practice, waste and accident rate by 61.03, 44, 52.53, 95.19, 80.12, and 70.55% respectively. Additionally, the companies saved a total of 14933446 ETH Birr and 5,658 M2 free spaces. Even though, the practices and improvements vary from company to company, and even companies unable to practice some of the unique techniques of the identified CI initiatives considered in the proposed framework.

Research limitations/implications

All data collected in the survey came from professionals working for Ethiopian manufacturing companies, universities and government. It is important to highlight that n = 244 is high sample size, which is adequate for a preliminary survey but reinforcing still needs further survey in terms of generalization of the results since there are hundreds of manufacturing companies, consultants and academicians implementing and consulting Kaizen. Therefore, a further study on a wider Ethiopian manufacturing companies, consultants and academic scale would be informative.

Practical implications

This work is very important for Kaizen professionals in the manufacturing industry, academic and government but in particular for senior management and leadership teams. Aside from the main findings on framework development, there is some strong evidence that practice of Kaizen resulted in achieving quantitative (monetary and non-monetary) and qualitative results. Thus, senior management teams should use this research out to practice and analyze the effect of Kaizen on their own organizations. Within the academic community, this study is one of the first focusing on development, validating and practically testing and should aid further study, research and understanding of Kaizen in manufacturing industries.

Originality/value

So far, it is rare to find preceding studies proposed, validated and practically test an integrated Kaizen framework with the context of manufacturing industries. Thus, authors understand that this is the very first research focused on the development of the framework for manufacturing industries continuously to be competitive and could help managers, institutions, practitioners and academicians in Kaizen practice.

Details

International Journal of Quality & Reliability Management, vol. 40 no. 10
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 19 December 2022

Juliano Endrigo Sordan, Clésio Aparecido Marinho, Pedro Carlos Oprime, Márcio Lopes Pimenta and Roy Andersson

This paper aims to characterize a sample of Lean Six Sigma (LSS) projects in healthcare settings and discuss some specificities of operational excellence (OPEX) initiatives in…

Abstract

Purpose

This paper aims to characterize a sample of Lean Six Sigma (LSS) projects in healthcare settings and discuss some specificities of operational excellence (OPEX) initiatives in hospitals and healthcare organizations in the USA.

Design/methodology/approach

A content analysis involving a sample of 23 documents shared by US hospitals was performed in order to achieve the research objectives. Such analysis was based on a conceptual framework developed from the literature review. It was also applied to a quantitative approach, including descriptive statistics, hypothesis testing and correspondence analysis that supported the research.

Findings

Most LSSH projects were focused on business transformation and strategic improvements. Simple techniques and tools were predominant such as descriptive statistics, process mapping, 5S and spaghetti charts, usually implemented by Green Belts and Black Belts through the define, measure, analyze, improve and control (DMAIC) method. In addition to the expressive findings reported, these projects' results have been aligned with lead time and operational cost reduction, quality improvement and capacity increase.

Research limitations/implications

The study adds knowledge to the OPEX literature by analyzing the Lean Six Sigma healthcare (LSSH) in hospitals and healthcare institutions in the USA. It also demonstrates that different approaches, such as the kaizen event and DMAIC project show different results according to some techniques and tools applied in the hospital environment.

Originality/value

The empirical evidence presented in this study provides scenery of the LSS practices in the healthcare settings, highlighting the implementation areas, outcomes, tools and techniques mostly used in the North American healthcare institutions.

Details

Benchmarking: An International Journal, vol. 30 no. 10
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 4 July 2023

Muhammad Sami Ur Rehman, Muhammad Tariq Shafiq, Fahim Ullah and Khaled Galal Ahmed

The purpose of this study is to investigate the current construction progress monitoring (CPM) process in relation to the contractual obligations, how project management teams…

Abstract

Purpose

The purpose of this study is to investigate the current construction progress monitoring (CPM) process in relation to the contractual obligations, how project management teams carry out this activity in the field and why teams continue to adopt the current method. The study aims to provide a comprehensive understanding of the current monitoring process and its effectiveness, identify any shortcomings and propose recommendations for improvements that can lead to better project outcomes.

Design/methodology/approach

The study conducted semi-structured interviews with 28 construction management practitioners to explore their views on contractual requirements, traditional progress monitoring practices and advanced monitoring methods. Thematic analysis was used to identify existing processes, practices and incentives for advanced monitoring.

Findings

Standard construction contracts mandate current progress monitoring practices, which often rely on manual, document-centric and labor-intensive methods, leading to slow and erroneous progress reporting and project delays. Key barriers to adopting advanced tools include rigid contractual clauses, lack of incentives and the absence of reliable automated tools. A holistic automated approach that covers the entire CPM process, from planning to claim management, is needed as a viable alternative to traditional practices.

Research limitations/implications

The study's findings can inform researchers, stakeholders and decision-makers about the existing monitoring practices and contribute to enhancing project management practices.

Originality/value

The study identified contractually mandated progress monitoring processes, traditional methods of collecting, transferring, analyzing and dispensing progress-related information and potential incentives and points of departure towards technologically advanced methods.

Details

Built Environment Project and Asset Management, vol. 13 no. 6
Type: Research Article
ISSN: 2044-124X

Keywords