Vartenie Aramali, George Edward Gibson, Hala Sanboskani and Mounir El Asmar

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on…

Abstract

Purpose

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on their technical aspects rather than social. This study aims to hypothesize that improving both the technical maturity of EVMS and the social environment elements of EVMS applications together will significantly impact project performance outcomes. For the first time, empirical evidence supports a strong relationship between EVMS maturity and environment.

Design/methodology/approach

Data was collected from 35 projects through four workshops, attended by 31 industry practitioners with an average of 19 years of EVMS experience. These experts, representing 23 organizations, provided over 2,800 data points on sociotechnical integration and performance outcomes, covering projects totaling $21.8 billion. Statistical analyses were performed to derive findings on the impact of technical maturity and social environment on project success.

Findings

The results show statistically significant differences in cost growth, compliance, meeting project objectives and business drivers and customer satisfaction, between projects with high EVMS maturity and environment and projects with poor EVMS maturity and environment. Moreover, the technical and social dimensions were found to be significantly correlated.

Originality/value

Key contributions include a novel and tested performance-driven framework to support integrated project management using EVMS. The adoption of this detailed assessment framework by government and industry is driving a paradigm shift in project management of some of the largest and most complex projects in the U.S.; specifically transitioning from a project assessment based upon a binary approach for EVMS technical maturity (i.e. compliant/noncompliant to standards) to a wide-ranging scale (i.e. 0–1,000) across two dimensions.

Details

International Journal of Managing Projects in Business, vol. 17 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Content available
Book part
Publication date: 30 July 2018

Abstract

Details

Marketing Management in Turkey
Type: Book
ISBN: 978-1-78714-558-0

Content available
Book part
Publication date: 20 October 2020

Jane Beckett-Camarata

Abstract

Details

Public-Private Partnerships, Capital Infrastructure Project Investments and Infrastructure Finance
Type: Book
ISBN: 978-1-83909-654-9

Open Access
Article
Publication date: 28 September 2021

Alex Copping, Noorullah Kuchai, Laura Hattam, Natalia Paszkiewicz, Dima Albadra, Paul Shepherd, Esra Sahin Burat and David Coley

Understanding the supply network of construction materials used to construct shelters in refugee camps, or during the reconstruction of communities, is important as it can reveal…

1850

Abstract

Purpose

Understanding the supply network of construction materials used to construct shelters in refugee camps, or during the reconstruction of communities, is important as it can reveal the intricate links between different stakeholders and the volumes and speeds of material flows to the end-user. Using social network analysis (SNA) enables another dimension to be analysed – the role of commonalities. This is likely to be particularly important when attempting to replace vernacular materials with higher-performing alternatives or when encouraging the use of non-vernacular methods. This paper aims to analyse the supply networks of four different disaster-relief situations.

Design/methodology/approach

Data were collected from interviews with 272 displaced (or formally displaced) families in Afghanistan, Bangladesh, Nepal and Turkey, often in difficult conditions.

Findings

The results show that the form of the supply networks was highly influenced by the nature/cause of the initial displacement, the geographical location, the local availability of materials and the degree of support/advice given by aid agencies and or governments. In addition, it was found that SNA could be used to indicate which strategies might work in a particular context and which might not, thereby potentially speeding up the delivery of novel solutions.

Research limitations/implications

This study represents the first attempt in theorising and empirically investigating supply networks using SNA in a post-disaster reconstruction context. It is suggested that future studies might map the up-stream supply chain to include manufacturers and higher-order, out of country, suppliers. This would provide a complete picture of the origins of all materials and components in the supply network.

Originality/value

This is original research, and it aims to produce new knowledge.

Details

Journal of Humanitarian Logistics and Supply Chain Management, vol. 12 no. 1
Type: Research Article
ISSN: 2042-6747

Keywords

Content available
Book part
Publication date: 19 July 2023

Abstract

Details

Inclusive Developments Through Socio-economic Indicators: New Theoretical and Empirical Insights
Type: Book
ISBN: 978-1-80455-554-5

Open Access
Article
Publication date: 21 May 2018

Saeed Akbari, Mostafa Khanzadi and Mohammad Reza Gholamian

To address requirements and specifications of construction project, academics need to build a project classification model. In recent years, project success concept, particularly…

2812

Abstract

Purpose

To address requirements and specifications of construction project, academics need to build a project classification model. In recent years, project success concept, particularly on large-scale construction projects, has been a controversial issue, especially in developing countries. Hence, in this paper, after introducing a sustainable success index (SSI), a novel method called “rough set approach” had been adopted to induce decision rules and to classify construction projects. The paper aims to discuss these issues.

Design/methodology/approach

At first, 20 effective success factors and 15 success criteria based on three pillars of sustainability of economy, society and environment had been categorized. The research data used for analysis had been collected from 26 large-scale construction projects in Iran and five other countries. After collecting data collection, observations had been analyzed and 51 decision rules were generated, and the projects were classified. Eventually, in order to evaluate the performance of the generated rules, confusion matrix was applied, and the model was validated.

Findings

The results of the present study show that rough set theory (RST) can be an effective and valuable tool for building expert systems. Practical applications of these results along with limitations and future research are described.

Originality/value

Perhaps for the first time, in the present study, a number of large-scale construction projects are classified based on SSI. Applying RST for building rule-based system and classifying projects in construction project area are novel attempts undertaken in this paper. The rules induced in this study can be applied to develop a sustainable success prediction model in the future studies.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Content available

Abstract

Details

Sustainable Road Infrastructure Project Implementation in Developing Countries: An Integrated Model
Type: Book
ISBN: 978-1-83753-811-9

Content available
Article
Publication date: 4 October 2018

Denis S. Clayson, Alfred E. Thal, Jr and Edward D. White III

The purpose of this study was to investigate the stability of the cost performance index (CPI) for environmental remediation projects as the topic is not addressed in the…

1016

Abstract

Purpose

The purpose of this study was to investigate the stability of the cost performance index (CPI) for environmental remediation projects as the topic is not addressed in the literature. CPI is defined as the earned value of work performed divided by the actual cost of the work, and CPI stability represents the point in time in a project after which the CPI varies by less than 20 percent (measured in different ways).

Design/methodology/approach

After collecting monthly earned value management (EVM) data for 136 environmental remediation projects from a United States federal agency in fiscal years 2012 and 2013, the authors used the nonparametric Wilcoxon signed-rank test to analyze CPI stability. The authors also used nonparametric statistical comparisons to identify any significant relationships between CPI stability and independent variables representing project and contract characteristics.

Findings

The CPI for environmental projects did not stabilize until the projects were 41 percent complete with respect to project duration. The most significant factors contributing to CPI stability were categorized into the following managerial insights: contractor qualifications, communication, stakeholder engagement, contracting strategy, competition, EVM factors, and macro project factors.

Originality/value

As CPI stability for environmental remediation projects has not been reported in the literature, this research provides new insights to help project managers understand when the CPIs of environmental remediation projects stabilize and which factors have the most impact on CPI stability.

Details

Journal of Defense Analytics and Logistics, vol. 2 no. 2
Type: Research Article
ISSN: 2399-6439

Keywords

Content available
Book part
Publication date: 11 July 2018

Abstract

Details

The Emerald Handbook of Entrepreneurship in Tourism, Travel and Hospitality
Type: Book
ISBN: 978-1-78743-529-2

Content available
Book part
Publication date: 16 September 1997

Abstract

Details

Advances in Librarianship
Type: Book
ISBN: 978-0-12024-621-2

1 – 10 of over 1000