Search results

1 – 7 of 7
Content available
Article
Publication date: 15 March 2013

559

Abstract

Details

Anti-Corrosion Methods and Materials, vol. 60 no. 2
Type: Research Article
ISSN: 0003-5599

Content available
Article
Publication date: 1 December 2001

97

Abstract

Details

Anti-Corrosion Methods and Materials, vol. 48 no. 6
Type: Research Article
ISSN: 0003-5599

Keywords

Open Access
Article
Publication date: 12 May 2023

Kesavan Manoharan, Pujitha Dissanayake, Chintha Pathirana, Dharsana Deegahawature and Renuka Silva

Sources highlight that insufficient skills of site supervisors considerably influence the progress of many construction projects in numerous countries. This study intends to…

1064

Abstract

Purpose

Sources highlight that insufficient skills of site supervisors considerably influence the progress of many construction projects in numerous countries. This study intends to identify the crucial supervisory competencies that influence the effectiveness of building project operations in the context of developing countries.

Design/methodology/approach

The crucial construction site supervisory competencies were qualitatively identified through a comprehensive literature survey and a series of expert interviews with the use of thematic analysis approaches. A questionnaire survey was then carried out among 154 building project firms to quantify the impacts of the competencies on the effectiveness of project tasks with the use of the relative importance index approach. Additionally, industry-consultative meetings were held using problem-focused communication strategies to scrutinise the necessary actions.

Findings

Overall, 22 cognitive elements and 24 skills/abilities of supervisors were determined as being critical according to their impact values, where the site supervisors cognitive domains in construction planning and construction materials were determined as the top-ranking competencies in the list, with their manual skills/abilities in labour management and labour performance evaluation. Accordingly, a group of key competency outcomes were produced for the considerations in developing new site supervisory training components. Relevant statistical analysis results and the industry consultative outcomes substantiated the validity and dependability of the overall results.

Research limitations/implications

Although the study's focus was to site supervision procedures used in Sri Lankan building construction projects, the overall findings/outcomes might be put to the test in related situations in other emerging industries in other countries.

Originality/value

The study has constructed a base that shows how the significant site supervisory competencies influence the effectiveness of building construction operations, contributing to making a big difference in the methods of reskilling/upskilling in the industry associated with construction labour, supervision, efficiency management and productivity enhancement.

Details

International Journal of Industrial Engineering and Operations Management, vol. 6 no. 1
Type: Research Article
ISSN: 2690-6090

Keywords

Content available
Article
Publication date: 1 July 2005

Stephen Todd

64

Abstract

Details

Structural Survey, vol. 23 no. 3
Type: Research Article
ISSN: 0263-080X

Open Access
Article
Publication date: 16 April 2018

Guillermo A. Riveros and Manuel E. Rosario-Pérez

The combined effects of several complex phenomena cause the deterioration of elements in steel hydraulic structures (SHSs) within the US lock system: corrosion, cracking and…

1747

Abstract

Purpose

The combined effects of several complex phenomena cause the deterioration of elements in steel hydraulic structures (SHSs) within the US lock system: corrosion, cracking and fatigue, impact and overloads. Predicting the future condition state of these structures by the use of current condition state inspection data can be achieved through the probabilistic chain deterioration model. The purpose of this study is to derive the transition probability matrix using final elements modeling of a miter gate.

Design/methodology/approach

If predicted accurately, this information would yield benefits in determining the need for rehabilitation or replacement of SHS. However, because of the complexity and difficulties on obtaining sufficient inspection data, there is a lack of available condition states needed to formulate proper transition probability matrices for each deterioration case.

Findings

This study focuses on using a three-dimensional explicit finite element analysis (FEM) of a miter gate that has been fully validated with experimental data to derive the transition probability matrix when the loss of flexural capacity in a corroded member is simulated.

Practical implications

New methodology using computational mechanics to derive the transition probability matrices of navigation steel structures has been presented.

Originality/value

The difficulty of deriving the transition probability matrix to perform a Markovian analysis increases when limited amount of inspection data is available. The used state of practice FEM to derive the transition probability matrix is not just necessary but also essential when the need for proper maintenance is required but limited amount of the condition of the structural system is unknown.

Open Access
Article
Publication date: 18 July 2022

Kesavan Manoharan, Pujitha Dissanayake, Chintha Pathirana, Dharsana Deegahawature and Renuka Silva

Past studies highlight a wide range of labour-related problems resulting in productivity loss in the construction industry of many developing countries. This study aims to…

4175

Abstract

Purpose

Past studies highlight a wide range of labour-related problems resulting in productivity loss in the construction industry of many developing countries. This study aims to quantify the impacts of labour-related factors on the productivity of construction operations in Sri Lankan building projects based on the viewpoint of engineers and construction managers for upgrading management/organisational policies and practices.

Design/methodology/approach

Qualitative and quantitative approaches were used to identify the critical factors. Further, a series of industry consultative discussions were conducted through problem-based communication approaches to analyse the actions required.

Findings

A total of 21 factors were determined as critical, where skills shortage, labourers’ thinking abilities, work experience, knowledge in construction works and discipline were leading in the list. The statistical tests and the experts’ discussion outcomes ensured the validity and reliability of the study findings.

Research limitations/implications

The study outcomes will contribute to finding out better ways for directing labour in the industry practices and revising organisational policies towards achieving higher productivity levels in construction operations. Though the study findings are limited to the Sri Lankan context, some findings may be tested in other developing countries in similar scenarios.

Originality/value

The study findings show why the identified factors are critical, how those influence construction practices and what actions need to be considered for addressing the industry’s productivity-related challenges. These can play a key role in upgrading the construction management practices and organisational policies to the near-future stages.

Details

Frontiers in Engineering and Built Environment, vol. 2 no. 4
Type: Research Article
ISSN: 2634-2499

Keywords

Open Access
Article
Publication date: 3 February 2023

Kesavan Manoharan, Pujitha Dissanayake, Chintha Pathirana, Dharsana Deegahawature and Renuka Silva

Labour efficiency is the key component for the long-term sustainability of construction firms. Recent studies show that modernising organisational/managerial processes is…

Abstract

Purpose

Labour efficiency is the key component for the long-term sustainability of construction firms. Recent studies show that modernising organisational/managerial processes is necessary to raise labour efficiency in many emerging nations. Construction supervision is a crucial element in organisational/managerial practices, which provide blood circulation to the project operations by directing labour. Accordingly, this study aims to quantify the impacts of crucial organisational/managerial elements on the efficiency of labour in building construction projects based on the viewpoint of construction supervisors.

Findings

A total of 28 factors were determined as critical, where lack of labour motivation, poor labour training facilities, poor performance evaluation practices, no labour rewarding mechanism and poor communication/cooperation between parties were judged to be the top five key issues in the list. The validity and reliability of the study findings were ensured through statistical tests and the experts' discussion outcomes. In view of the evolving challenges facing the industry, the results indicate that the organisational policies of construction enterprises in place addressing financial procedures, communication strategies, resource management and performance management practices must be enhanced.

Research limitations/implications

The study findings will make a substantial contribution to reducing the disparity between organisation/management policies and labour practices towards changing how the sector operates to increase labour efficiency in construction projects.

Originality/value

This study contributes to addressing the knowledge gap in the industry associated with the organisational protocols, especially to understand/predict how such elements are significant, how much they influence the efficiency of construction practices and what steps can be made to limit their effects on labour efficiency in construction. These could be crucial in modernising organisational policies and procedures for construction management.

Details

International Journal of Industrial Engineering and Operations Management, vol. 5 no. 1
Type: Research Article
ISSN: 2690-6090

Keywords

Access

Only content I have access to

Year

Content type

Article (7)
1 – 7 of 7