Search results
1 – 2 of 2Mats Janné and Anna Fredriksson
The construction industry is reluctant to utilize construction logistics centres (CLC). To understand why, the purpose of the study is to increase the understanding of drivers and…
Abstract
Purpose
The construction industry is reluctant to utilize construction logistics centres (CLC). To understand why, the purpose of the study is to increase the understanding of drivers and challenges of CLC utilization.
Design/methodology/approach
Adopting an activity-based cost methodology, nine construction projects' CLC utilization in a Swedish urban development project is analyzed for a time period of three years (2013–2016).
Findings
There is a difference between drivers and challenges for implementing and utilizing CLCs, which are often implemented to reduce third-party disturbances. The drivers to utilize a CLC, however, stem from achieving efficient logistics. The authors identify two different utilization strategies; the CLC is used either for just-in-time (JIT) deliveries or as a consolidation point.
Research limitations/implications
The study shows that construction logistics is to some extent repeating some mistakes of its big brother, city logistics. The study hypothesizes that there are differences between CLC implementation and utilization drivers and challenges that are often overlooked, which can explain the lack of CLC utilization.
Practical implications
The study shows that it is crucial for construction projects to develop and formulate a logistics strategy for how to utilize the setup, i.e. deciding whether to use the setup as a consolidation point leading to fewer deliveries and more materials on-site, or as JIT, leading to more deliveries but fewer materials on-site.
Social implications
CLCs can reduce environmental impact and third-party disturbances. However, to make this come true, acceptance among the users is needed. The study provides understanding of drivers and barriers for CLC implementation and utilization that can increase acceptance among users (i.e. construction projects).
Originality/value
The current study is one of the first studies to analyze CLC utilization.
Details
Keywords
Ziboud Van Veldhoven and Jan Vanthienen
Digital transformation (DT) projects are complex and often unsuccessful. While researchers have suggested many guidelines and best practices on how to successfully roll out DT…
Abstract
Purpose
Digital transformation (DT) projects are complex and often unsuccessful. While researchers have suggested many guidelines and best practices on how to successfully roll out DT projects and how they are spread among a large number of scientific papers. The aim of this paper is to synthesize these guidelines into clear overviews.
Design/methodology/approach
A systematic literature review was conducted on both Scopus and Web of Science to search for papers suggesting DT guidelines or best practices. In total, 150 papers dealing with DT and guidelines were fully analyzed.
Findings
Eight main DT guidelines were found and each one was expanded with several best practices on how to implement these. The results are eight tables giving an overview of the commonly agreed-upon best practices for each DT guideline.
Research limitations/implications
These overviews are useful for both researchers and practitioners, to guide future work and to be inspired respectively. This paper calls for more research on how these guidelines are followed in practice, how these differ per industry and what their impact is on the overall success of DT projects.
Originality/value
The synthesis of DT guidelines organized into an accessible format has not yet been conducted before, and can serve as a seminal pinpoint for future research.
Details