Search results

1 – 2 of 2
Open Access
Article
Publication date: 4 October 2021

Nathaniel Ayinde Olatunde, Imoleayo Abraham Awodele and Henry Agboola Odeyinka

The purpose of the study is to examine the stakeholder identification (SI) methods used in building projects procured by private corporate organisations in Southwestern Nigeria to…

4615

Abstract

Purpose

The purpose of the study is to examine the stakeholder identification (SI) methods used in building projects procured by private corporate organisations in Southwestern Nigeria to draw a correlation between methods used for SI and project performance in the study area, thereby enhancing project performance.

Design/methodology/approach

The study used a census survey to purposively select 30 projects managers (who indicated from a first-stage questionnaire) that they have participated in structured stakeholder management (SM) from a list of 106 project managers and client representatives who have been involved in SM of building projects procured by private corporate organisations between 2008 and 2017 in the study area. A second-stage questionnaire was designed to elicit information from the respondents. The quantitative data that were collected were analysed using mean score (MS) analysis and Analysis of variance (ANOVA).

Findings

The study found that brainstorming in group meetings (MS = 4.33), interviews with the expert (MS = 3.20) and identification by other stakeholders (MS = 3.00) are the most frequently used SI methods in the study area. It was also found that the use of a questionnaire (MS = 0.87), Delphi method (MS = 0.80) and public hearing (MS = 0.57) was rare for SI in the study area. A further result showed that there was no significant difference in the opinion of project managers on 85% of methods used for SI in the study area irrespective of the procurement method employed.

Practical implications

The study examined the methods project managers used for SI on building projects procured by private corporate organisations to advocate for more robust and all-inclusive SI methods.

Originality/value

The study empirically examined methods used for SI and correlated them to project performance.

Details

Frontiers in Engineering and Built Environment, vol. 1 no. 2
Type: Research Article
ISSN: 2634-2499

Keywords

Open Access
Article
Publication date: 20 December 2022

Nathaniel Ayinde Olatunde, Angel M. Gento, Victor N. Okorie, Olumide W. Oyewo, Modupe Cecilia Mewomo and Imoleayo Abraham Awodele

Construction 4.0 technology is a novel innovative technology that has been proved to enhance project performance. However, information on the concept's awareness, adoption…

2882

Abstract

Purpose

Construction 4.0 technology is a novel innovative technology that has been proved to enhance project performance. However, information on the concept's awareness, adoption readiness and challenges in developing economies is still scanty. The purpose of the study is to appraise awareness, adoption readiness and challenges of Construction 4.0 technologies in Nigeria to bring to the fore the state of art of these innovative technologies in the study area.

Design/methodology/approach

The study used a convenient sampling technique to select 129 construction professionals (architects, engineers and quantity surveyors) in Osun State, Nigeria, who provided data for the study through a closed-ended structure questionnaire survey. The quantitative data supplied were analysed using frequency, percentile, Cronbach's alpha, mean score (MS) analysis and analysis of variance (ANOVA).

Findings

The overall awareness level of construction professionals in the study area about Construction 4.0 technologies is at a moderate level (MS = 3.03). The analysis of each component of the Construction 4.0 technologies shows that BIM (MS = 3.69) has the highest level of awareness, while augmented reality (MS = 2.51) has the least awareness level. More results show a significant difference in the opinion of the respondents, a significant difference in the respondents on 36% of the components of Construction 4.0 technologies. The adoption readiness of the Nigerian construction industry (NCI) to Construction 4.0 technologies is at an initial level (MS = 2.86). However, the 3D printing (MS = 3.36) and augmented reality (MS = 2.49) have the highest and lowest adoption readiness ratings, respectively. There is no significant difference in how respondents ranked the NCI adoption readiness on 73% of the components of Construction 4.0 technologies. The main challenges of Construction 4.0 technologies in the study area are lack of standardisation (MS = 4.02), lack of investment in research and development and cost of implementation (MS = 3.87) each. The result shows that there is perfect unanimity in the way respondents ranked the challenges of Construction 4.0.

Practical implications

The study provided information on the status quo of Construction 4.0 technologies in the NCI to enhance improvement in practice and the attendant project delivery.

Originality/value

The study attempted to bring to the fore the state of the art on awareness, adoption readiness and challenges of Construction 4.0 technologies in Nigeria. The study's information will be valuable to improve project delivery.

Details

Frontiers in Engineering and Built Environment, vol. 3 no. 2
Type: Research Article
ISSN: 2634-2499

Keywords

Access

Only Open Access

Year

Content type

1 – 2 of 2