Managing megaprojects is challenging due to their inherent complexity and uncertainty. Collaborative project delivery models have been introduced as an alternative to traditional…

Abstract

Purpose

Managing megaprojects is challenging due to their inherent complexity and uncertainty. Collaborative project delivery models have been introduced as an alternative to traditional project management in public infrastructure megaprojects and are often realized through collaborative contracts. These project organizations act as institutional arenas for logic interaction as actors with differing institutional backgrounds interact within the project. This paper aims to study the delivery phase of three megaprojects through an institutional lens, investigating the institutional interaction and alignment of logics therein.

Design/methodology/approach

A multiple case study was employed to reach deep insight into the phenomenon. Sixty-one interviews were conducted over 3 cases with representatives from all levels of the project hierarchy. Respondents were selected through snowball sampling. In two cases, observations of the shared project office were conducted. Data analysis built on first-order codes and second-order themes, collected into a theoretical framework.

Findings

The empirical evidence demonstrates the dynamics shaping institutional logics and gives evidence for changing logics in projects with a well-applied collaborative contract. However, there is a risk of resistance and a return to traditional logics since institutional change is slow and an unsuitably applied collaborative contract can lead to adherence to the conventional way of work.

Originality/value

Current research has focused on the regulatory framework and procurement phase of such models, but little attention has been given to the delivery phase and the interaction of conflicting logics. This paper can serve as an exemplar of the different logics found within public infrastructure projects and their interaction and alignment. Contributions include a heightened emphasis on the start of the project as a meeting point for differing institutional logics and the role change necessary when using a collaborative contract.

Open Access
Article
Publication date: 14 August 2024

Huijun Tu and Shitao Jin

Due to the complexity and diversity of megaprojects, the architectural programming process often involves multiple stakeholders, making decision-making difficult and susceptible…

Abstract

Purpose

Due to the complexity and diversity of megaprojects, the architectural programming process often involves multiple stakeholders, making decision-making difficult and susceptible to subjective factors. This study aims to propose an architectural programming methodology system (APMS) for megaprojects based on group decision-making model to enhance the accuracy and transparency of decision-making, and to facilitate participation and integration among stakeholders. This method allows multiple interest groups to participate in decision-making, gathers various perspectives and opinions, thereby improving the quality and efficiency of architectural programming and promoting the smooth implementation of projects.

Design/methodology/approach

This study first clarifies the decision-making subjects, decision objects, and decision methods of APMS based on group decision-making theory and value-based architectural programming methods. Furthermore, the entropy weight method and fuzzy TOPSIS method are employed as calculation methods to comprehensively evaluate decision alternatives and derive optimal decision conclusions. The workflow of APMS consists of four stages: preparation, information, decision, and evaluation, ensuring the scientific and systematic of the decision-making process.

Findings

This study conducted field research and empirical analysis on a practical megaproject of a comprehensive transport hub to verify the effectiveness of APMS. The results show that, in terms of both short-distance and long-distance transportation modes, the decision-making results of APMS are largely consistent with the preliminary programming outcomes of the project. However, regarding transfer modes, the APMS decision-making results revealed certain discrepancies between the project's current status and the preliminary programming.

Originality/value

APMS addresses the shortcomings in decision accuracy and stakeholder participation and integration in the current field of architectural programming. It not only enhances stakeholder participation and interaction but also considers various opinions and interests comprehensively. Additionally, APMS has significant potential in optimizing project performance, accelerating project processes, and reducing resource waste.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Content available

Abstract

Details

Engineering, Construction and Architectural Management, vol. 31 no. 9
Type: Research Article
ISSN: 0969-9988

Open Access
Article
Publication date: 23 August 2024

Lauri Vuorinen, Jere Lehtinen and Matias Ståhle

Citizen engagement can promote value creation in urban development projects. This potential stems from the granting of decision-making authority to citizens, labeled citizen…

Abstract

Purpose

Citizen engagement can promote value creation in urban development projects. This potential stems from the granting of decision-making authority to citizens, labeled citizen enfranchisement in this study. Citizens are focal stakeholders of urban development projects and enfranchisement grants them an explicit say on such projects. Despite this potential for enhanced value creation, there remains limited understanding about how project organizations enfranchise stakeholders in the front end of urban development projects.

Design/methodology/approach

In this research, we designed a multiple-case study to analyze two novel citizen engagement processes in Northern-European cities. In these processes, citizens were enfranchised in ideating, designing, and making selections on urban development projects. We followed a multimethod approach to data collection. The collected datasets include document data, interview data and observation data.

Findings

Our findings demonstrated a distribution and redistribution of decision-making authority throughout the phases of the citizen engagement processes. Citizens’ voices were amplified throughout the project front end, although episodes of decision-making authority held by the cities took place periodically as well. By granting explicit decision-making authority to citizens, citizen enfranchisement facilitated a more democratic urban development process, promoting value creation.

Originality/value

In contrast to the earlier research, the findings of our study illustrate citizen engagement taking place at so-called higher levels of stakeholder engagement. In particular, our study reveals a granting of de facto decision-making authority to citizens, also known as citizen enfranchisement. These findings contribute to the earlier research on stakeholder engagement in projects, where the influence of stakeholder engagement has often been considered symbolic or limited.

Details

International Journal of Managing Projects in Business, vol. 17 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 27 February 2024

Maryam R. Nezami, Mark L.C. de Bruijne, Marcel J.C.M. Hertogh and Hans L.M. Bakker

Societies depend on interconnected infrastructures that are becoming more complex over the years. Multi-disciplinary knowledge and skills are essential to develop modern…

Abstract

Purpose

Societies depend on interconnected infrastructures that are becoming more complex over the years. Multi-disciplinary knowledge and skills are essential to develop modern infrastructures, requiring close collaboration of various infrastructure owners. To effectively manage and improve inter-organizational collaboration (IOC) in infrastructure construction projects, collaboration status should be assessed continually. This study identifies the assessment criteria, forming the foundation of a tool for assessing the status of IOC in interconnected infrastructure projects.

Design/methodology/approach

A systematic literature study and in-depth semi-structured interviews with practitioners in interconnected infrastructure construction projects in the Netherlands are performed to identify the criteria for assessing the status of IOC in infrastructure construction projects, based on which an assessment tool is developed.

Findings

The identified assessment criteria through the literature and the practitioner’s perspectives results in the designing and development of a collaboration assessment tool. The assessment tool consists of 12 criteria and 36 sub-criteria from three different categories of collaborative capacity: individual, relational, and organizational.

Originality/value

The assessment tool enables practitioners to monitor the status of IOC between infrastructure owners and assists them in making informed decisions to enhance collaboration. The assessment tool provides the opportunity to assess and analyze the status of collaboration based on three categories (i.e., individual, relational, and organizational).

Details

Engineering, Construction and Architectural Management, vol. 31 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 28 June 2022

Sahar Jawad, Ann Ledwith and Rashid Khan

There is growing recognition that effective project control systems (PCS) are critical to the success of projects. The relationship between the individual elements of PCS and…

1979

Abstract

Purpose

There is growing recognition that effective project control systems (PCS) are critical to the success of projects. The relationship between the individual elements of PCS and successfully achieving project objectives has yet to be explored. This research investigates the enablers and barriers that influence the elements of PCS success and drive project objectives.

Design/methodology/approach

This study adopts a mixed approach of descriptive analysis and regression models to explore the impact of six PCS elements on project outcomes. Petroleum and chemical projects in Saudi Arabia were selected as a case study to validate the research model.

Findings

Data from a survey of 400 project managers in Saudi’s petroleum and chemical industry reveal that successful PCS are the key to achieving all project outcomes, but they are particularly critical for meeting project cost objectives. Project Governance was identified as the most important of the six PCS elements for meeting project objectives. A lack of standard processes emerged as the most significant barrier to achieving effective project governance, while having skilled and experienced project team members was the most significant enabler for implementing earned value.

Practical implications

The study offers a direction for implementing and developing PCS as a strategic tool and focuses on the PCS elements that can improve project outcomes.

Originality/value

This research contributes to project management knowledge and differs from previous attempts in two ways. Firstly, it investigates the elements of PCS that are critical to achieving project scope, schedule and cost objectives; secondly, enablers and barriers of PCS success are examined to see how they influence each element independently.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 15 July 2024

Andrew Ebekozien, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala, Mohamed Ahmed Hafez and Mohamad Shaharudin Samsurijan

Despite advancements in construction digitalisation and alternative building technologies, cost overrun is still a challenge in the construction industry. The inflation rate is…

Abstract

Purpose

Despite advancements in construction digitalisation and alternative building technologies, cost overrun is still a challenge in the construction industry. The inflation rate is increasing, especially in developing countries, and is critical in cost overrun matters. It can deviate construction built-up rate components. This may thwart improving construction-related Sustainable Development Goals (SDGs). Studies concerning the impact of the inflation rate on construction-related SDGs are scarce in developing countries, including Nigeria. The study investigated the impact of inflation on Nigeria’s construction projects and their outcome on SDGs and suggested possible ways to improve achievement of construction-related SDGs and their targets.

Design/methodology/approach

The researchers employed a qualitative research design. This is because of the study’s unexplored dimension. The researchers engaged 35 participants across major cities in Nigeria via semi-structured virtual and face-to-face interviews. The research utilised a thematic method for collated data and accomplished saturation.

Findings

Findings reveal that the impact of inflation on construction projects, if not checked, could hinder achieving construction-related SDGs in Nigeria. This is because of the past three years of hyperinflation that cut across major construction components. It shows that the upward inflation rate threatens achieving construction-related SDGs and proffered measures to mitigate inflation and, by extension, enhance achieving construction-related SDGs. This includes a downward review of the Monetary Policy Rate, control of exchange rate volatility and addressing insecurity to restore FDIs and FPIs confidence.

Originality/value

Besides suggesting possible solutions to mitigate hyperinflation on construction components to improve achieving construction-related SDGs, findings will stipulate government policymakers put measures in place through favourable fiscal and monetary policy implementation and encourage moving from a consumption to a production nation.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 24 July 2024

Gijsbert van de Waerdt, Leentje Volker, Lynn Vosman and Hans Voordijk

The aim of this research is to explore how a programmatic multi-project context influences project-based firms (PBFs) in organizing their relations with other PBFs and suppliers…

Abstract

Purpose

The aim of this research is to explore how a programmatic multi-project context influences project-based firms (PBFs) in organizing their relations with other PBFs and suppliers in a project-based industry.

Design/methodology/approach

A multiple case study research is conducted. Data are collected from two case studies in the construction infrastructure sector. Eleven interviews with contractors and other suppliers are the primary source of data collection. The data are complemented by procurement documents and expert consultations.

Findings

The findings show that within a programmatic multi-project context, PBFs settle relations with (1) key partners for program management capacity, PBFs establish relations with (2) main contractors to divide projects and (innovation) tasks, and PBFs intensify relations with (3) suppliers to ensure continuity and expertise.

Research limitations/implications

The study contributes to the body of project management literature by exploring PBF’s relations with other PBFs and suppliers in a multi-project context. Based on empirical data, the study provides a distinction in layers presenting distinct levels of PBF’s supplier relations. This layer structure provides an excellent starting point for future studies exploring the program perspective of PBFs in the integrated supply chain.

Originality/value

Given the increase in programmatic multi-project context for project-based domains, discussed in both literature and practice, this study explores the effect of programs on relations of PBFs with other PBFs and suppliers. The study distinguishes PBF’s relations with the different suppliers in three layers and discusses the characteristics of these relations.

Details

International Journal of Managing Projects in Business, vol. 17 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 21 May 2024

Daniela Sorrentino, Pasquale Ruggiero, Alessandro Braga and Riccardo Mussari

This paper delves into a pivotal juncture within the co-production literature, intersecting with the ongoing debate about performance challenges in public sector accounting…

Abstract

Purpose

This paper delves into a pivotal juncture within the co-production literature, intersecting with the ongoing debate about performance challenges in public sector accounting scholarship. It explores how public managers conceive and measure the performance of co-produced public services.

Design/methodology/approach

A case study is conducted on three instances of neighbourhood watching – that is, a type of collective co-production – in a homogeneous institutional setting. The analysis and interpretation of empirical data are guided by a systematic conceptual space delineating the qualities that performance criteria can take in contexts where public services are produced.

Findings

Findings reveal that when the co-production activation is driven by both state and lay actors, public managers tend to conceptualise and measure its performance in a way that contributes to building a more structured co-productive space, where the roles to play, how to interact and what to achieve are clearly defined.

Originality/value

This paper breaks new ground by scrutinising the conceptualisation of performance in settings where public services involve actors beyond traditional public administrations. By exploring the diverse “shapes” and meanings that performance can take in co-production arrangements, this paper enriches discussions on how public sector accounting can inform co-production literature.

Details

Journal of Public Budgeting, Accounting & Financial Management, vol. 36 no. 6
Type: Research Article
ISSN: 1096-3367

Keywords

Open Access
Article
Publication date: 27 February 2024

Vartenie Aramali, George Edward Gibson, Hala Sanboskani and Mounir El Asmar

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on…

1719

Abstract

Purpose

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on their technical aspects rather than social. This study aims to hypothesize that improving both the technical maturity of EVMS and the social environment elements of EVMS applications together will significantly impact project performance outcomes. For the first time, empirical evidence supports a strong relationship between EVMS maturity and environment.

Design/methodology/approach

Data was collected from 35 projects through four workshops, attended by 31 industry practitioners with an average of 19 years of EVMS experience. These experts, representing 23 organizations, provided over 2,800 data points on sociotechnical integration and performance outcomes, covering projects totaling $21.8 billion. Statistical analyses were performed to derive findings on the impact of technical maturity and social environment on project success.

Findings

The results show statistically significant differences in cost growth, compliance, meeting project objectives and business drivers and customer satisfaction, between projects with high EVMS maturity and environment and projects with poor EVMS maturity and environment. Moreover, the technical and social dimensions were found to be significantly correlated.

Originality/value

Key contributions include a novel and tested performance-driven framework to support integrated project management using EVMS. The adoption of this detailed assessment framework by government and industry is driving a paradigm shift in project management of some of the largest and most complex projects in the U.S.; specifically transitioning from a project assessment based upon a binary approach for EVMS technical maturity (i.e. compliant/noncompliant to standards) to a wide-ranging scale (i.e. 0–1,000) across two dimensions.

Details

International Journal of Managing Projects in Business, vol. 17 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Access

Only content I have access to

Year

Last week (14)

Content type

1 – 10 of 14