Search results

1 – 10 of over 10000
Article
Publication date: 19 July 2023

Hasith Chathuranga Victar, B.A.K.S. Perera, Asha Dulanjalie Palihakkara and Kaveesha Gihani Dewagod

The construction industry is shifting towards becoming more circular by reducing waste, reusing building materials and embracing regenerative solutions for energy generation and…

Abstract

Purpose

The construction industry is shifting towards becoming more circular by reducing waste, reusing building materials and embracing regenerative solutions for energy generation and biodiversity conservation. Thus, construction professionals must perform diversified services to achieve a circular built environment (CBE). Implementing resource planning and waste management in CBE has already posed challenges to the quantity surveying profession; thus, quantity surveyors (QSs) should be equipped with new roles and competencies to tackle challenges in achieving a CBE. Hence, this study aimed to investigate the functions and competencies of QSs at the design and building material sourcing stages in achieving a CBE according to 3R principles.

Design/methodology/approach

The research apprehended a qualitative approach, including two expert interview rounds adhering to the Delphi technique with 14 and 11 experts per each round. Manual content analysis was incorporated to analyse the collected data.

Findings

The research findings revealed the important roles and competencies of QSs in achieving a CBE. In addition, essential functions and competencies were categorised according to the 3R principles (reduce, reuse, recycle) to successfully implement CBE during the Design and Building Material Sourcing stages. According to the 3R principles of CBE, cost control, cost planning, feasibility studies, measurement and quantification, risk management, value engineering and innovations and technologies were well-received by most interviewees as essential roles of QSs during the Design and Building Material Sourcing stages. Further, basic/mandatory competencies (personal, interpersonal, professional practice and business skills), economic analysis, BIM management, cost management and risk management are highly regarded by experts for QS as important competencies to achieve CBE.

Originality/value

With new construction trends, QSs must enhance their conventional roles and competencies and search for new skills and competencies. Those skills and competencies could be linked to the CE concept, either directly or indirectly. Since QS holds a prominent place in sustainable construction in CBE, adapting to changes in the construction industry such as CBE is timely for QSs. Further, there is a shortage of literature regarding QSs' roles and competencies in achieving a CBE; thus, this study will contribute by identifying new avenues for QSs in achieving a CBE in the practice and the research.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Open Access
Article
Publication date: 22 April 2020

David Ness

While most efforts to combat climate change are focussed on energy efficiency and substitution of fossil fuels, growth in the built environment remains largely unquestioned. Given…

Abstract

While most efforts to combat climate change are focussed on energy efficiency and substitution of fossil fuels, growth in the built environment remains largely unquestioned. Given the current climate emergency and increasing scarcity of global resources, it is imperative that we address this “blind spot” by finding ways to support required services with less resource consumption.

There is now long overdue recognition to greenhouse gas emissions “embodied” in the production of building materials and construction, and its importance in reaching targets of net zero carbon by 2050. However, there is a widespread belief that we can continue to “build big”, provided we incorporate energy saving measures and select “low carbon materials” – ignoring the fact that excessive volume and area of buildings may outweigh any carbon savings. This is especially the case with commercial real estate.

As the inception and planning phases of projects offer most potential for reduction in both operational and embodied carbon, we must turn our attention to previously overlooked options such as “build nothing” or “build less”. This involves challenging the root cause of the need, exploring alternative approaches to meet desired outcomes, and maximising the use of existing assets. If new build is required, this should be designed for adaptability, with increased stewardship, so the building stock of the future will be a more valuable and useable resource.

This points to the need for increased understanding and application of the principles of strategic asset management, hitherto largely ignored in sustainability circles, which emphasize a close alignment of assets with the services they support.

Arguably, as the built environment consumes more material resources and energy than any other sector, its future configuration may be critical to the future of people and the planet. In this regard, this paper seeks to break new ground for deeper exploration.

Article
Publication date: 23 September 2022

Visar Hoxha and Veli Lecaj

The purpose of this paper is to highlight the regulatory barriers to achieving sustainable buildings in Kosovo. The present paper focuses on regulatory barriers viewed from the…

Abstract

Purpose

The purpose of this paper is to highlight the regulatory barriers to achieving sustainable buildings in Kosovo. The present paper focuses on regulatory barriers viewed from the perspective of construction industry experts in achieving sustainable buildings.

Design/methodology/approach

The present study uses a qualitative research method and semi-structured interviews as a research instrument. The present study interviews around 20 experts in construction and property management, property development, spatial planning and energy management.

Findings

The study finds that Kosovo building laws and regulations provide for the materials assessment criteria, but the materials assessment criteria are only for mechanic strength. The study further finds that the sustainability concept is not included and incorporated in Kosovo's urban planning laws and regulations. The study also finds that despite specific clauses mentioning energy performance certificates in the Law on Energy Performance of Buildings in Kosovo, energy performance certificates appears to be not enforced and the nature of the barrier is more organizational rather than regulatory. Finally, the study finds that Kosovo laws are silent as far as green labeling of building materials is concerned.

Practical implications

The implication of the present finding is that policymakers in Kosovo not only should include clear sustainable materials assessment criteria in the law, but also enforce those criteria through testing and inspection mechanisms included in the law and implemented in practice through funding and organizational support. Nonetheless, policymakers in Kosovo should contemplate amending the urban planning laws in Kosovo and include both the term of sustainability at the planning level and conformity guidelines for sustainable design that can be done at the administrative directive level. Further, the clauses in the law do not suffice if the clauses are not accompanied by specific systemic and organizational support in the issuance of energy performance certificates. Policymakers in Kosovo should be proactive in designing clauses that specify green labeling standards for materials; however, these labeling standards should not adversely affect the cost of construction and reduce the demand for real estate.

Originality/value

The study is the first qualitative study about the perception of construction professionals in Kosovo, regarding the regulatory barriers of sustainable buildings in Kosovo.

Details

Property Management, vol. 42 no. 2
Type: Research Article
ISSN: 0263-7472

Keywords

Open Access
Article
Publication date: 12 January 2024

Patrik Jonsson, Johan Öhlin, Hafez Shurrab, Johan Bystedt, Azam Sheikh Muhammad and Vilhelm Verendel

This study aims to explore and empirically test variables influencing material delivery schedule inaccuracies?

Abstract

Purpose

This study aims to explore and empirically test variables influencing material delivery schedule inaccuracies?

Design/methodology/approach

A mixed-method case approach is applied. Explanatory variables are identified from the literature and explored in a qualitative analysis at an automotive original equipment manufacturer. Using logistic regression and random forest classification models, quantitative data (historical schedule transactions and internal data) enables the testing of the predictive difference of variables under various planning horizons and inaccuracy levels.

Findings

The effects on delivery schedule inaccuracies are contingent on a decoupling point, and a variable may have a combined amplifying (complexity generating) and stabilizing (complexity absorbing) moderating effect. Product complexity variables are significant regardless of the time horizon, and the item’s order life cycle is a significant variable with predictive differences that vary. Decoupling management is identified as a mechanism for generating complexity absorption capabilities contributing to delivery schedule accuracy.

Practical implications

The findings provide guidelines for exploring and finding patterns in specific variables to improve material delivery schedule inaccuracies and input into predictive forecasting models.

Originality/value

The findings contribute to explaining material delivery schedule variations, identifying potential root causes and moderators, empirically testing and validating effects and conceptualizing features that cause and moderate inaccuracies in relation to decoupling management and complexity theory literature?

Details

International Journal of Operations & Production Management, vol. 44 no. 13
Type: Research Article
ISSN: 0144-3577

Keywords

Abstract

Details

Understanding Intercultural Interaction: An Analysis of Key Concepts, 2nd Edition
Type: Book
ISBN: 978-1-83753-438-8

Article
Publication date: 12 April 2024

Ogün Bi̇lge and Yüksel Dede

This study aimed to determine the expectations of students from mathematics teachers in the planning phase of lesson study (LS) in mathematics classrooms.

Abstract

Purpose

This study aimed to determine the expectations of students from mathematics teachers in the planning phase of lesson study (LS) in mathematics classrooms.

Design/methodology/approach

This study reported only a part of large-scale action research. The participants were Grade 8 students selected by the convenience sampling method. The data were obtained through open-ended questions. The content analysis method was used to analyze the data.

Findings

Four categories emerged: connection, technology-supported teaching, use of concrete materials, practice, and teacher behavior and teaching style.

Research limitations/implications

This study reveals how students in a different culture and education system, such as Türkiye, want to learn mathematics in the LS process of Japanese origin. It also gives some important clues for applying LS in a different culture.

Practical implications

This study may attract the attention of educational stakeholders who want to implement LS in mathematics classrooms by considering student perspectives.

Social implications

Due to the nature of LS, this study may emphasize teacher–student and teacher–teacher interactions. Thus, it can draw attention to the importance of social learning environments where students take responsibility and interact.

Originality/value

This study emphasizes the importance of listening to student voices in LS. Some ideas about mathematics teaching in Turkey should also be given. Finally, it can provide a good basis for understanding and comparing LS practices in different cultures and understandings.

Details

International Journal for Lesson & Learning Studies, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-8253

Keywords

Abstract

Details

Embracing Chaos
Type: Book
ISBN: 978-1-83753-635-1

Open Access
Article
Publication date: 20 June 2023

William R. Illsley

By reconsidering the concept of the historic environment, the aim of this study is to better understand how heritage is expressed by examining the networks within which the…

Abstract

Purpose

By reconsidering the concept of the historic environment, the aim of this study is to better understand how heritage is expressed by examining the networks within which the cultural performances of the historic environment take place. The goal is to move beyond a purely material expression and seek the expansion of the cultural dimension of the historic environment.

Design/methodology/approach

Conceptually, the historic environment is considered a valuable resource for heritage expression and exploration. The databases and records that house historic environment data are venerated and frequented entities for archeologists, but arguably less so for non-specialist users. In inventorying the historic environment, databases fulfill a major role in the planning process and asset management that is often considered to be more than just perfunctory. This paper approaches historic environment records (HERs) from an actor network perspective, particularizing the social foundation and relationships within the networks governing the historic environment and the environment's associated records.

Findings

The paper concludes that the performance of HERs from an actor-network perspective is a hegemonic process that is biased toward the supply and input to and from professional users. Furthermore, the paper provides a schematic for how many of the flaws in heritage transmission have come about.

Originality/value

The relevance here is largely belied by the fact that HERs as both public digital resources and as heritage networks were awaiting to be addressed in depth from a theoretical point of view.

Details

Journal of Cultural Heritage Management and Sustainable Development, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-1266

Keywords

Open Access
Article
Publication date: 10 July 2023

Moses Muhwezi, Henry Mutebi, Samuel Ssekajja Mayanja, Benjamin Tukamuhabwa, Sheila Namagembe and Robert Kalema

Procuring relief products and services is a challenging process for humanitarian organizations (HOs), yet it accounts for approximately 65% of relief operations’ costs (Moshtari…

1963

Abstract

Purpose

Procuring relief products and services is a challenging process for humanitarian organizations (HOs), yet it accounts for approximately 65% of relief operations’ costs (Moshtari et al., 2021). This paper aims to examine how procurement internal controls, materials and purchasing procedure standardization influence information integration and procurement performance.

Design/methodology/approach

In this study, partial least square structural equation models and multigroup analysis were used to analyze data collected from 170 HOs.

Findings

Procurement internal controls and material and purchasing procedure standardization fully mediate between information integration and procurement performance.

Research limitations/implications

The study focuses only on HOs. Since humanitarian procurement projects take place over a period of several years, it is difficult to capture the long-term effects of information integration, procurement internal controls, material and purchasing procedure standardization and procurement performance. In this regard, a longitudinal study could be undertaken, provided that the required resources are available.

Practical implications

Procurement managers should implement information integration practices within acceptable procurement internal controls and standardize material and purchasing procedures to boost procurement performance.

Originality/value

By integrating information through procurement internal controls and standardizing material and purchasing procedures, procurement performance in a humanitarian setting can be systematically optimized.

Details

Journal of Humanitarian Logistics and Supply Chain Management, vol. 13 no. 4
Type: Research Article
ISSN: 2042-6747

Keywords

Article
Publication date: 1 January 2024

Masoud Parsi, Vahid Baradaran and Amir Hossein Hosseinian

The purpose of this study is to develop an integrated model for the stochastic multiproject scheduling and material ordering problems, where some of the prominent features of…

Abstract

Purpose

The purpose of this study is to develop an integrated model for the stochastic multiproject scheduling and material ordering problems, where some of the prominent features of offshore projects and their environmental-degrading effects have been embraced as well. The durations of activities are uncertain in this model. The developed formulation is tri-objective that seeks to minimize the expected time, total cost and CO2 emission of all projects.

Design/methodology/approach

A new version of the multiobjective multiagent optimization (MOMAO) algorithm has been proposed to solve the amalgamated model. To empower the MOMAO, various procedures of this algorithm have been modified based on the multiattribute utility theory (MAUT) technique. Along with the MOMAO, this study has employed four other meta-heuristic methodologies to solve the model as well.

Findings

The outputs of the MOMAO have been put to test against four other optimizers in terms of convergence, diversity, uniformity and computation times. The results of the Mean Ideal Distance (MID) metric have revealed that the MOMAO has strongly prevailed its rival optimizers. In terms of diversity of the acquired solutions, the MOMAO has ranked the first among all employed optimizers since this algorithm has offered the best solutions in 56.66 and 63.33% of the test problems regarding the diversification metric and hyper-volume metrics. Regarding the uniformity of results, which is measured through the spacing metric (SP), the MOMAO has presented the best SP values in more than 96% of the test problems. The MOMAO has needed more computation times in comparison to its rivals.

Practical implications

A real case study comprising two concurrent offshore projects has been offered. The proposed formulation and the MOMAO have been implemented for this case study, and their effectiveness has been appraised.

Originality/value

Very few studies have focused on presenting an integrated formulation for the stochastic multiproject scheduling and material ordering problems. The model embraces some of the characteristics of the offshore projects which have not been adequately studied in the literature. Limited capacities of the offshore platforms and cargo vessels have been embedded in the proposed model. The offshore platforms have spatial limitations in storing the required materials. The vessels are also capacitated and they also have limited shipment capacities. Some of the required materials need to be transported from the base to the offshore platform via a fleet of cargo vessels. The workforces and equipment can become idle on the offshore platform due to material shortage. Various offshore-related costs have been integrated as a minimization objective function in the model. The cargo vessels release CO2 detrimental emissions to the environment which are sought to be minimized in the developed formulation. To the best of the authors' knowledge, the MOMAO has not been sufficiently employed as a solution methodology for the stochastic multiproject scheduling and material ordering problems.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of over 10000