Search results

1 – 4 of 4
Article
Publication date: 9 October 2023

Zhijie Yuan, Hao Wang, Rou Li, Jianxiao Mao and Hui Gao

This paper aims to investigate the equivalent relationship between accelerated corrosion tests and real environmental spectrum of suspenders in long-span suspension bridge…

Abstract

Purpose

This paper aims to investigate the equivalent relationship between accelerated corrosion tests and real environmental spectrum of suspenders in long-span suspension bridge considering multiple factors action.

Design/methodology/approach

Based on Faraday's law, corrosion current was used as a measure of metal corrosion, and the equivalent conversion relationship between laboratory environment and real service environment was established. The equivalent conversion method for bridge structural steel had been determined under different temperature, humidity, pH value and NaCl concentration conditions. The compilation of environmental spectra for large span bridges considering multiple factors and the principle of equivalent conversion have been proposed.

Findings

Environmental factors, including temperature, humidity, pH value and NaCl concentration, have significant impact on the corrosion degree of suspension steel wires, and only considering these two factors for equivalent conversion cannot accurately reflect the true service environment of the bridge. The 33.8-h salt spray accelerated corrosion test using the standard conditions can be equivalent to one year of suspenders corrosion in a real service environment.

Originality/value

The equivalent accelerated corrosion method for steel wires proposed in this study can effectively predict the corrosion degree of the suspenders, which has been verified to be correct and can provide theoretical guidance for the development of corrosion test plans for steel wires and engineering technical basis for anti-corrosion control and calendar life research of suspension bridge suspenders.

Details

Anti-Corrosion Methods and Materials, vol. 70 no. 6
Type: Research Article
ISSN: 0003-5599

Keywords

Article
Publication date: 12 December 2023

Niveen Badra, Hosam Hegazy, Mohamed Mousa, Jiansong Zhang, Sharifah Akmam Syed Zakaria, Said Aboul Haggag and Ibrahim Abdul-Rashied

This research aims to create a methodology that integrates optimization techniques into preliminary cost estimates and predicts the impacts of design alternatives of steel…

Abstract

Purpose

This research aims to create a methodology that integrates optimization techniques into preliminary cost estimates and predicts the impacts of design alternatives of steel pedestrian bridges (SPBs). The cost estimation process uses two main parameters, but the main goal is to create a cost estimation model.

Design/methodology/approach

This study explores a flexible model design that uses computing capabilities for decision-making. Using cost optimization techniques, the model can select an optimal pedestrian bridge system based on multiple criteria that may change independently. This research focuses on four types of SPB systems prevalent in Egypt and worldwide. The study also suggests developing a computerized cost and weight optimization model that enables decision-makers to select the optimal system for SPBs in keeping up with the criteria established for that system.

Findings

In this paper, the authors developed an optimization model for cost estimates of SPBs. The model considers two main parameters: weight and cost. The main contribution of this study based on a parametric study is to propose an approach that enables structural engineers and designers to select the optimum system for SPBs.

Practical implications

The implications of this research from a practical perspective are that the study outlines a feasible approach to develop a computerized model that utilizes the capabilities of computing for quick cost optimization that enables decision-makers to select the optimal system for four common SPBs based on multiple criteria that may change independently and in concert with cost optimization during the preliminary design stage.

Social implications

The model can choose an optimal system for SPBs based on multiple criteria that may change independently and in concert with cost optimization. The resulting optimization model can forecast the optimum cost of the SPBs for different structural spans and road spans based on local unit costs of materials cost of steel structures, fabrication, erection and painting works.

Originality/value

The authors developed a computerized model that uses spreadsheet software's capabilities for cost optimization, enabling decision-makers to select the optimal system for SPBs meeting the criteria established for such a system. Based on structural characteristics and material unit costs, this study shows that using the optimization model for estimating the total direct cost of SPB systems, the project cost can be accurately predicted based on the conceptual design status, and positive prediction outcomes are achieved.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 21 November 2023

Tianyao Ping, Wei Pan and Zhiqian Zhang

Modular construction is an innovative method that enhances the performance of building construction projects. However, the performance of steel modular construction has not been…

Abstract

Purpose

Modular construction is an innovative method that enhances the performance of building construction projects. However, the performance of steel modular construction has not been systematically understood, and the existing measurement methods exhibit limitations in effectively addressing the features of steel modular building construction. Therefore, this study aims to develop a new performance measurement framework for systematically examining the performance of steel modular construction in building projects.

Design/methodology/approach

This study was conducted through a mixed-method research design that combines a comprehensive review of the state-of-the-art practices of construction performance measurement and a case study with a 17-story steel modular apartment building project in Hong Kong. The case project was measured with data collected from the project teams and other reliable channels, and the measurement practices and findings were referenced to establish a systematic performance measurement framework for steel modular construction.

Findings

Considering steel modular construction as a complex socio-technical system, a systematic performance measurement framework was developed, which considers the features of steel modular construction, focuses on the construction stage, incorporates the views of various stakeholders, integrates generic and specific key performance indicators and provides a benchmarking process. Multifaceted benefits of adopting steel modular construction were demonstrated with case study, including improved economic efficiency (e.g. nearly 10% cost savings), improved environmental friendliness (e.g. approximately 90% waste reduction) and enhanced social welfare (e.g. over 60% delivery trips reduction).

Originality/value

This paper extends the existing performance measurement methods with a new framework proposed and offers experience for future steel modular construction. The measured performance of the case project also contributes in-depth understanding on steel modular construction with benefits demonstrated. The study is expected to accelerate an effective uptake of steel modular construction in building projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 13 March 2024

Lina Gharaibeh, Kristina Eriksson and Björn Lantz

Perceived benefits of building information modelling (BIM) have been discussed for some time, but cost–benefit benchmarking has been inconsistent. The purpose of this paper is to…

Abstract

Purpose

Perceived benefits of building information modelling (BIM) have been discussed for some time, but cost–benefit benchmarking has been inconsistent. The purpose of this paper is to investigate BIM feasibility and evaluate investment worth to elucidate and develop the current understanding of BIM merit. The aim of the study is to propose a research agenda towards a more holistic perspective of BIM use incorporating quantifying investment return.

Design/methodology/approach

An in-depth examination of research patterns has been conducted to identify challenges in the assessment of the investment value and return on investment (ROI) for BIM in the construction industry. A total of 75 research articles were considered for the final literature review. An evaluation of the literature is conducted using a combination of bibliometric analysis and systematic reviews.

Findings

This study, which analysed 75 articles, unveils key findings in quantifying BIM benefits, primarily through ROI calculation. Two major research gaps are identified: the absence of a standardized BIM ROI method and insufficient exploration of intangible benefits. Research focus varies across phases, emphasizing design and construction integration and exploring post-construction phases. The study categorizes quantifiable factors, including productivity, changes and rework reduction, requests for information reduction, schedule efficiency, safety, environmental sustainability and operations and facility management. These findings offer vital insights for researchers and practitioners, enhancing understanding of ’BIM’s financial benefits and signalling areas for further exploration in construction.

Originality/value

The ’study’s outcomes offer the latest insights for researchers and practitioners to create effective approaches for quantifying ’BIM’s financial benefits. Additionally, the proposed research agenda aims to improve the current limited understanding of BIM feasibility and investment worth evaluation. Results of the study could assist practitioners in overcoming limitations associated with BIM investment and economic evaluations in the construction industry.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

1 – 4 of 4