Article
Publication date: 3 November 2023

Kavya Jain and Ganesh Devkar

Set-based design (SBD) is a lean tool widely adopted for improving design processes and providing value maximization to clients. The purpose of this paper is to present the…

Abstract

Purpose

Set-based design (SBD) is a lean tool widely adopted for improving design processes and providing value maximization to clients. The purpose of this paper is to present the development and testing of a lean simulation game that incorporated point-based and SBD principles. The objective of the game was to enhance learning of lean design management among construction students.

Design/methodology/approach

After a thorough and comprehensive literature review consisting of secondary data in journal papers, books, thesis references and primary data in the form of interviews with lean practitioners, the simulation game prototype was developed. The testing of the game was carried out with a study group. Data were collected during the gameplay with the help of a questionnaire survey on a confidence scale and Likert scale and assessed using the Wilcoxon signed-rank test, histogram, one-sample t-test and false discovery rate (Benjamini–Hochberg) correction method.

Findings

The data collected both pre- and post-simulation showed an increase in average confidence in understanding from 3.33 to 3.89, a 16.7% rise. The data was further interpreted by using Wilcoxon signed-rank test, indicating that the post-simulation learning experience was significantly better than the pre-simulation one. Promising positive results were obtained for the questions on game design, engagement and understanding of point-based design and SBD concepts.

Originality/value

The simulation game helps bridge the gap between knowledge building and real-life by effectively imitating the process. The game facilitates a dynamic and critical approach toward developing new educational simulation games and their successful incorporation in propagating lean principles in the construction industry.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 27 October 2023

Muhammad Saiful Islam, Madhav Nepal and Martin Skitmore

Power plant projects are very complex and encounter serious cost overruns worldwide. Their cost overrun risks are not independent but interrelated in many cases, having structural…

Abstract

Purpose

Power plant projects are very complex and encounter serious cost overruns worldwide. Their cost overrun risks are not independent but interrelated in many cases, having structural relationships among each other. The purpose of this study is, therefore, to establish the complex structural relationships of risks involved.

Design/methodology/approach

In total, 76 published articles from the previous literature are reviewed using the content analysis method. Three risk networks in different phases of power plant projects are depicted based on literature review and case studies. The possible methods of solving these risk networks are also discussed.

Findings

The study finds critical cost overrun risks and develops risk networks for the procurement, civil and mechanical works of power plant projects. It identifies potential models to assess cost overrun risks based on the developed risk networks. The literature review also revealed some research gaps in the cost overrun risk management of power plants and similar infrastructure projects.

Practical implications

This study will assist project risk managers to understand the potential risks and their relationships to prevent and mitigate cost overruns for future power plant projects. It will also facilitate decision-makers developing a risk management framework and controlling projects’ cost overruns.

Originality/value

The study presents conceptual risk networks in different phases of power plant projects for comprehending the root causes of cost overruns. A comparative discussion of the relevant models available in the literature is presented, where their potential applications, limitations and further improvement areas are discussed to solve the developed risk networks for modeling cost overrun risks.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 25 March 2024

Francis Nuako, Frank Ato Ghansah and Thomas Adusei

It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been…

Abstract

Purpose

It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been advancements in the management of building projects throughout time but cost overruns remain a key concern in the construction sector internationally, particularly in emerging economies such as Ghana. This study aims to answer the question, “What are the critical success factors (CSFs) that can assist reduce cost overruns in public sector infrastructure projects in the Ghanaian construction industry?”

Design/methodology/approach

This study used a quantitative survey method. The questionnaire was pre-tested by interviewing 15 contractors to ascertain the validity of the content. Factor analysis and multiple regression were adopted to analyze the data.

Findings

This study discovered that the critical factors that can reduce cost overruns in construction projects in Ghana are directly linked to five themes: early contractor involvement in the project planning stage, adequate funding, good project team relations, competent managers/supervisors and project participant incentives/bonuses. This study identifies indestructible, empirically measurable important success criteria for reducing cost overruns in public building projects in Ghana.

Practical implications

When well thought through from the project initiation stage to completion, these critical successes can also be used to deal with damaging economic effects such as allocative inefficiency of scarce resources, further delays, contractual disputes, claims and litigation, project failure and total abandonment.

Originality/value

The uniqueness of this research resides in the fact that it is, to the best of the authors’ knowledge, a first-of-its-kind investigation of the CSFs for reducing cost overruns in public building projects in developing countries.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article