Search results

1 – 1 of 1
Article
Publication date: 1 June 2012

Heidi Auvinen, Anu Tuominen and Toni Ahlqvist

This paper aims to introduce a process for constructing long‐term visions of the transport system. The vision building process is demonstrated by creating a concise test vision of

1834

Abstract

Purpose

This paper aims to introduce a process for constructing long‐term visions of the transport system. The vision building process is demonstrated by creating a concise test vision of the Finnish transport system in 2100.

Design/methodology/approach

The vision building process combines four futures methods that support the long‐term foresight approach: transition management, PESTE analysis, the futures table and the Delphi method. The process is validated with a test vision.

Findings

A three‐step vision building process for long‐term transport system visions is structured. The three consecutive steps of the process are environmental scanning, constructing futures tables and visions, and describing visions. In addition, a demonstrative test vision is created to describe a possible future transport system in 2100 in a metropolitan Finland. The successful application of the developed method supports further work on creating full‐scale strategy‐driven visions.

Originality/value

Futures studies analyzing transport systems and infrastructures tend to focus on short‐ to medium‐term perspectives. This paper presents a unique method for constructing alternative long‐term visions as far as 50 to 100 years into the future.

Details

Foresight, vol. 14 no. 3
Type: Research Article
ISSN: 1463-6689

Keywords

1 – 1 of 1