Search results

1 – 10 of 10
Article
Publication date: 26 April 2018

Ralph Olusola Aluko, Emmanuel Itodo Daniel, Olalekan Shamsideen Oshodi, Clinton Ohis Aigbavboa and Abiodun Olatunji Abisuga

In recent years, there has been a tremendous increase in the number of applicants seeking placements in undergraduate architecture programs. It is important during the selection…

Abstract

Purpose

In recent years, there has been a tremendous increase in the number of applicants seeking placements in undergraduate architecture programs. It is important during the selection phase of admission at universities to identify new intakes who possess the capability to succeed. Admission variable (i.e. prior academic achievement) is one of the most important criteria considered during the selection process. This paper aims to investigates the efficacy of using data mining techniques to predict the academic performance of architecture students based on information contained in prior academic achievement.

Design/methodology/approach

The input variables, i.e. prior academic achievement, were extracted from students’ academic records. Logistic regression and support vector machine (SVM) are the data mining techniques adopted in this study. The collected data were divided into two parts. The first part was used for training the model, while the other part was used to evaluate the predictive accuracy of the developed models.

Findings

The results revealed that SVM model outperformed the logistic regression model in terms of accuracy. Taken together, it is evident that prior academic achievement is a good predictor of academic performance of architecture students.

Research limitations/implications

Although the factors affecting academic performance of students are numerous, the present study focuses on the effect of prior academic achievement on academic performance of architecture students.

Originality/value

The developed SVM model can be used as a decision-making tool for selecting new intakes into the architecture program at Nigerian universities.

Details

Journal of Engineering, Design and Technology, vol. 16 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 2 April 2019

Emmanuel Itodo Daniel and Christine Pasquire

The purpose of this paper is to present the current knowledge surrounding social value (SV) and show how lean approach supports SV realisation in the delivery of construction…

1913

Abstract

Purpose

The purpose of this paper is to present the current knowledge surrounding social value (SV) and show how lean approach supports SV realisation in the delivery of construction projects.

Design/methodology/approach

A critical literature review was adopted, to gather the current knowledge surrounding SV from mainstream management sciences, construction management and lean literature. A total of 70 studies were critically reviewed.

Findings

The study establishes that the current level of awareness on SV is still low and there is a dearth of scholarly publications on SV especially in the construction management literature. The investigation reveals the potentials of lean approach in supporting the delivery of SV on construction projects.

Social implications

This study conceptualises the community and the physical environment around where the construction project is executed as customers using lean production approach. It shows that the transformation, flow and value view supports smooth workflow, which enhances the achievement of SV objectives. This creates a new insight into how SV can be realised in construction project delivery.

Originality/value

This study extends the on-going debate around the need for SV in construction project delivery and contributes to construction management and lean construction literature on SV. Future studies could build on this to obtain empirical data and develop an approach/method that would support the evidencing of SV delivery on construction projects.

Details

Engineering, Construction and Architectural Management, vol. 26 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 15 May 2017

Emmanuel Itodo Daniel, Christine Pasquire, Graham Dickens and Herman Glenn Ballard

The purpose of this paper is to identify how the newly emerging UK practice of “collaborative planning” (CP) for construction project delivery aligns with the advocated principles…

4380

Abstract

Purpose

The purpose of this paper is to identify how the newly emerging UK practice of “collaborative planning” (CP) for construction project delivery aligns with the advocated principles of the global last planner system (LPS) of production planning and control.

Design/methodology/approach

A mixed, qualitative, exploratory approach was adopted for the study. This entailed qualitative data through three techniques, namely: semi-structured interviews, documents analysis, and structured observation. In total, 30 in-depth interviews were conducted over a 12 month period with lean construction consultants, clients, main contractors, and subcontractors drawn from the building, highways and infrastructure and rail sector. In all, 15 projects were visited where practices were observed.

Findings

The study reveals that the current practice of CP in the UK partially aligns with the LPS principles. Where practitioners have heard of the LPS they believe it to be the same practice as CP.

Research limitations/implications

This study is limited to 30 interviews, observation of 15 projects and document analysis. The aim of the study is not to generalise the findings, however, since the study examined top construction companies and practitioners in the UK and the findings were consistent across the sample, some conclusions could be made. The study is also limited to examining the construction phase only, future studies should incorporate the design phase.

Practical implications

A clear identification of the elements of current practice compared to the components of the LPS provides a contribution to the future practice of project production planning and management in the construction industry.

Social implications

The study highlights a continuing resistance to collaboration within the industry. This resistance is subtly embedded within implemented practices even though they are based on collaborative working for their success.

Originality/value

This is among the first studies in the UK that comprehensively examines and reports the application of LPS/CP practice in construction across the major construction sectors. Future studies could build on the findings from this work to develop an approach/methodology to improve the current practice.

Details

Engineering, Construction and Architectural Management, vol. 24 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 11 January 2023

Emmanuel Itodo Daniel, Olalekan Oshodi, Daniel Dabara and Nenpin Dimka

Housing provides constructed space for human activities. Literature indicates that housing impacts wealth, education attainment and health outcomes, among others. Because of its…

Abstract

Purpose

Housing provides constructed space for human activities. Literature indicates that housing impacts wealth, education attainment and health outcomes, among others. Because of its contributions to society, it is essential to develop and implement strategies that address the housing shortage experienced in most cities across the globe. This study aims to unpack the factors affecting housing production in the UK and chart the way forward.

Design/methodology/approach

In addressing this study's aim, an interprivitst approach was adopted and semi-structured interviews were conducted with 18 experienced professionals. Data were collected across the four nations of the UK (England, Wales, Scotland and Northern Ireland).

Findings

The results indicated that the opportunistic behaviour of stakeholders is one of the main factors affecting housing production in the study area. Also, modern construction methods, collaborative practices, government intervention and affordable housing schemes were identified as key strategies for addressing housing production factors.

Practical implications

This study identified strategies for mitigating housing production issues that provide a focal point to all stakeholders keen on filling the housing shortage gap and improving productivity to channel their resources and effort accordingly.

Originality/value

To the best of the authors’ knowledge, this study is one of the first to empirically analyse the influencing factors on the housing gap in the UK from the perspective of the supply side to provide information that could lead towards closing the said gap.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 23 June 2023

David Oloke, Louis Gyoh, Emmanuel Itodo Daniel, Olugbenga Oladinrin and Nagwan Abdallah

This study aims to understand the impact of the Covid-19 pandemic disruptive event on delivery of the built environment degree apprentice programme in higher education in the UK…

Abstract

Purpose

This study aims to understand the impact of the Covid-19 pandemic disruptive event on delivery of the built environment degree apprentice programme in higher education in the UK and identify the key strategies to minimise the effect.

Design/methodology/approach

A qualitative approach was used to collect and analyse data from a sample set of built environment degree apprenticeship stakeholders. Semi-structured interviews were conducted with 17 key stakeholders to collate emerging themes on their perceptions of the impacts of the pandemic and strategies to adopted to minimise it.

Findings

The investigation reveals that the core impacts of Covid-19 on the apprentices training programme are lack of access to the site, furlough, limited access to off the job training, limited interaction with tutors and peers, too much time on the screen, limited pastoral care and lack of contact with a mentor. The census from the research participants is that despite the development and gain with the various virtual platform used during pandemic physical meetings with their mentor remain pivotal to the built environment apprentices learning and training.

Practical implications

The results provide relevant stakeholders and actors supporting degree apprentices training programmes (training providers and employers, among others) with the information needed to improve the delivery of built environment degree apprenticeship training programmes during a disruptive event Covid-19. The study identifies various strategies to minimise the impact of disruptive events on the apprentices training, including technology, regular meeting with mentors online, and personal and pastoral care.

Originality/value

The study is the first to document the impact of the Covid-19 pandemic on degree apprenticeship programs in the built environment. This study provides an in-depth understanding of how these programs have been affected and offers potential solutions to reduce or mitigate potential damage. The research will inform future policy decisions related to degree apprenticeship programs in the built environment.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 17 June 2022

Emmanuel Itodo Daniel and Olalekan Oshodi

The purpose of this study is to present an overview of the existing knowledge on the combined application of lean, off-site and simulation (LOS) in housing delivery.

Abstract

Purpose

The purpose of this study is to present an overview of the existing knowledge on the combined application of lean, off-site and simulation (LOS) in housing delivery.

Design/methodology/approach

A systematic literature review approach was adopted. Based on a comprehensive search using Scopus, Web of Science and the International Group for Lean Construction databases, 66 relevant journal articles were identified and analysed.

Findings

This study found that the most significant impacts of the combined application of LOS in housing delivery are the capacity to visualise the production processes as a whole in real time, exposure and removal of non-value-adding activities from the production and faster delivery. However, the combined application of LOS is low compared to a single application of each technique in housing delivery.

Practical implications

The results provide relevant stakeholders and actors in the housing sector (private and public housing developers, off-site housing manufacturers and constructors, housing associations and government housing agencies, among others) with the information needed to improve the outcomes of housing delivery through the application of LOS.

Originality/value

This study contributes to the ongoing debate on addressing the global housing shortage by presenting an integrated overview of the existing knowledge on the impact of the nexus of LOS and providing compelling evidence for its usage in housing delivery. It also demonstrates how the combined application of LOS supports the achievement of the flow and value view in the transformation flow value model, which was not previously reported.

Details

Construction Innovation , vol. 23 no. 5
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 2 January 2020

Emmanuel Itodo Daniel, Olalekan Shamsideen Oshodi, Louis Gyoh and Ezekiel Chinyio

Apprenticeship programmes are designed to provide young trainees with essential broad-based skills. Through apprenticeships, different sectors that are underpopulated can fill up…

Abstract

Purpose

Apprenticeship programmes are designed to provide young trainees with essential broad-based skills. Through apprenticeships, different sectors that are underpopulated can fill up their skills gaps. Apprenticeships are particularly useful to the construction sector which has a high ageing workforce and associated lower labour productivity. However, the completion rates of apprenticeship training programmes in the construction sector remain low in several countries across the globe. Thus, the purpose of this paper is to review the published research on apprenticeship training that is specifically focused on the construction sector, to determine the current status quo and suggest a direction for future research.

Design/methodology/approach

A systematic review approach was adopted. Based on a comprehensive search using SCOPUS databases, 33 relevant journal articles were identified and analysed.

Findings

It was found that monitoring and control is the most mentioned factor responsible for improvements in the completion rates of apprenticeship training. In contrast, the length of time required for going through the full training is the most common factor responsible for low completion rates. Three research gaps were identified, among which is the dearth of studies that has focused on apprentices training in developing countries.

Research limitations/implications

The gaps identified in the current knowledge on apprenticeship training would serve as a justification for future investigations. However, the scope of the review is limited to papers published in academic journals and citable through SCOPUS.

Practical implications

The outcomes of the study provide researchers and other relevant stakeholders with a concise report on the findings of previous studies. It also provides insight into strategies for improving the completion rates of apprenticeship training in the construction sector.

Originality/value

A systematic evaluation of the extant literature draws on theoretical evidence and highlights the factors that are more likely to influence the outcomes of apprentice training for craftspeople in the construction sector.

Details

Education + Training, vol. 62 no. 2
Type: Research Article
ISSN: 0040-0912

Keywords

Abstract

Details

Journal of Intelligent Manufacturing and Special Equipment, vol. 4 no. 1
Type: Research Article
ISSN: 2633-6596

Article
Publication date: 23 May 2023

Olabode Emmanuel Ogunmakinde, Temitope Egbelakin, Willy Sher, Temitope Omotayo and Mercy Ogunnusi

Establishing a more sustainable built environment is an increasing global concern for the construction industry. Despite the intrinsic and extrinsic obstacles the stakeholders…

Abstract

Purpose

Establishing a more sustainable built environment is an increasing global concern for the construction industry. Despite the intrinsic and extrinsic obstacles the stakeholders face, huge efforts are required to transition to a smooth, sustainable construction (SC) practice. This study identifies and discusses cogent obstacles to SC in developing nations.

Design/methodology/approach

The Preferred Reporting Item for systematic reviews and Meta-Analysis (PRISMA) approach was employed to establish research work in SC for developing countries. The databases used were Scopus and Web of Science. Meta-analysis of keywords was analysed thematically. The initial broad search returned 8,420 publications which were filtered and reviewed in-depth to fit the aim of the study, produced only 21 relevant publications from the years 2000–2021.

Findings

The four identified themes of obstacles to SC in developing countries are as follows: construction professional training and education, clients' attitudes and awareness, construction industries' culture and capacity and governments' regulation, policies and economy. The key barriers identified from the meta-analysis include inadequate training and education amongst construction professionals, poor execution of sustainability ethics, poor populace attitude towards sustainability, poor awareness and understanding, dearth of precise data and integrated study and inappropriate priorities about sustainability.

Originality/value

The originality in this study are themes drawn from millennium development goals (MDGs) and sustainable development goals (SDGs) publications related to SC. Consequently, the final framework presented a holistic approach to surmounting the established limitations and aided recommendations for future studies. Thus, setting a background for developing strategies to overcome the limitations and further attain sustainable development (SD).

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 17 July 2017

Obuks Augustine Ejohwomu, Olalekan Shamsideen Oshodi and Ka Chi Lam

Communication plays an important role in the quality of the relationship, trust and collaboration among construction project teams. Literature suggests that effective…

3962

Abstract

Purpose

Communication plays an important role in the quality of the relationship, trust and collaboration among construction project teams. Literature suggests that effective communication is vital for achieving improved project performance. The purpose of this paper is to identify and assess the barriers to effective communication in the Nigerian construction industry, using attribution theory paradigm.

Design/methodology/approach

Questionnaires detailing 15 barriers to effective communication were administered to consultants and contractors engaged in the Nigerian construction sector. In total, 100 valid responses were analysed using mean score, factor analysis and factor score.

Findings

Unclear project objectives, ineffective reporting systems and poor leadership were ranked as the most significant barriers to effective communication. Factor analysis uncovered that the principal reasons responsible for ineffective communication include: managerial and technical barriers and credibility and background barriers.

Practical implications

The results provide information on barriers which needs to be addressed in order to improve communication in construction projects in Nigeria. There is a need to conduct post-completion reviews of construction projects so that project team members can learn and share knowledge on past experiences. Although the present study was conducted in the Nigerian context, it is envisaged that the research outcome will be widely applicable to other developing countries.

Originality/value

The study provides insights on the perceived barriers to effective communication in Nigerian construction projects. The paper presents the direction for further research aimed at improving communication in construction projects in Nigeria.

Details

Engineering, Construction and Architectural Management, vol. 24 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of 10