Search results

1 – 10 of 67
Open Access
Article
Publication date: 16 July 2024

Enrico Bracci, Mouhcine Tallaki and Vincenzo Riso

This paper aims to contribute to the management control systems (MCS) changes in public-private partnerships (PPSs) by developing a conceptual archetype explaining the…

Abstract

Purpose

This paper aims to contribute to the management control systems (MCS) changes in public-private partnerships (PPSs) by developing a conceptual archetype explaining the relationship between trust and MCSs in PPPs, and highlighting how this relationship may evolve over time.

Design/methodology/approach

The paper adopts a longitudinal case study methodology focusing on a hospital built and operated under a project finance deal. The methods adopted include semistructured interviews, direct observation and internal documentation analysis. We conducted 15 semistructured interviews from 2019 to 2021. In analyzing different documents and interviews, we triangulated data to ensure solid interpretation.

Findings

The case shows how trust can take different configurations depending on the type of MCS used. The results highlight how different patterns of MCSs, about trust, can be combined to govern PPPs. The case also shows the temporal dynamics of how MCS and trust evolve at different organizational levels and how bureaucratic control matched with contractual trust and trust-based control matched with competence trust can coexist at different times and organizational levels.

Practical implications

Managers involved in PPPs will be aware of the role of different types of trust in shaping and managing the relationship between partners at different organizational levels. Furthermore, the findings could help policymakers to adopt more informed decisions and to promote practice-based trust at various organizational levels of PPPs.

Originality/value

The paper proposes a management control archetype based on bureaucracy- and trust-based patterns concerning the level of programmability of tasks, as well as defined risks.

Details

Journal of Accounting & Organizational Change, vol. 20 no. 6
Type: Research Article
ISSN: 1832-5912

Keywords

Article
Publication date: 6 April 2023

Gao Shang, Low Sui Pheng and Roderick Low Zhong Xia

The construction industry has arrived at a crossroads of rapid technological progress. While it is foreseen that the advent of new construction technologies will disrupt the…

Abstract

Purpose

The construction industry has arrived at a crossroads of rapid technological progress. While it is foreseen that the advent of new construction technologies will disrupt the construction industry’s future, such disruptions often create the ideal environment for innovation. As poor payment practices continue to plague the construction industry, the advent of smart contracts has created an opportunity to rectify the inherent flaws in the mitigation of payment problems in traditional construction contracts. Given the intrinsic resistance of construction firms to such revolutionary changes, this study aims to understand the various factors influencing the adoption of smart contracts in the Singapore construction industry.

Design/methodology/approach

A mixed method was adopted involving quantifying respondents’ perceptions of the factors influencing smart contract adoption, and validation from a group of interviewees on the matter. Out of 461 registered quantity surveyor members contacted via the Singapore institute of surveyors and valuers website, 55 respondents took part in the survey. This is followed by semi-structured interviews to validate the survey results.

Findings

The findings indicate that construction firms have neither a significant knowledge of nor willingness to adopt smart contracts. A total of 29 institutional factors were also identified that significantly influence the adoption of smart contracts. The quantitative findings were further reinforced by qualitative interviews with five industry experts.

Originality/value

With recognition of and the successful formulation of the significant institutional drivers and barriers, the key findings of this study will be integral in driving the commercial adoption of smart contracts within the construction industry.

Details

Construction Innovation , vol. 24 no. 5
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 6 August 2024

Kristina Frid, Elin K. Funck and Anna H. Glenngård

This paper aims to extend insights about the relationship between inter-organizational collaboration and approaches to control from the perspective of decision-makers. We…

Abstract

Purpose

This paper aims to extend insights about the relationship between inter-organizational collaboration and approaches to control from the perspective of decision-makers. We investigate the relationship between approaches to control and intended forms of integration between actors responsible for solving the complex problem of integrated person-centered care for elderly with diverse and significant needs.

Design/methodology/approach

The empirical study is based on a content analysis of contractual agreements. We have analyzed a total of 118 collaboration agreements and associative documents between all Swedish regions and municipalities.

Findings

The study shows that intended integration is subject to remarkable variation in intended forms of inter-organizational collaboration in this Swedish case. The paper illustrates that decision-makers’ intentions with proposed collaboration in each given context are important for the chosen approach to control. Regardless of intended forms of integration, our study suggests that an imminent soft approach to control is expressed alongside limited signs of hard control. Various forms of intended integration can be managed by the two approaches simultaneously insofar as the agreements appear to have a two-sided purpose.

Originality/value

Our paper proposes an empirically driven taxonomy of intended forms of integration initiatives. The taxonomy provides resources for studies about how collaboration can be managed when it is stipulated by national legislation but local self-governance gives actors considerable freedom to decide on how to organize and manage services. By presenting the taxonomy and relating this to approaches of control, our iterative study builds on and adds to a recent stream of research arguing that the relationship between collaboration and approaches to control may by fuzzier and more complex than originally thought.

Details

Journal of Public Budgeting, Accounting & Financial Management, vol. 36 no. 6
Type: Research Article
ISSN: 1096-3367

Keywords

Book part
Publication date: 26 September 2024

Jakob B Sørensen

Clause 1 [General Provisions] contains the provisions that in many contracts are bundled together under the ‘miscellaneous’ or ‘other provisions’ heading and includes a list of…

Abstract

Clause 1 [General Provisions] contains the provisions that in many contracts are bundled together under the ‘miscellaneous’ or ‘other provisions’ heading and includes a list of definitions, some interpretation principles, rules on communication between the Parties, documents forming the Contract, assignment, confidentiality etc. But Clause 1 also contains other provisions, like the Employer's right to use documentation and other deliverables provided by the Contractor (in other contracts usually referred to as a license to use), and a substantive Sub-Clause on limitation of liability.

Details

FIDIC Yellow Book: A Companion to the 2017 Plant and Design-Build Contract, Revised Edition
Type: Book
ISBN: 978-1-83608-164-7

Keywords

Book part
Publication date: 26 September 2024

Jakob B Sørensen

This chapter provides a general introduction to the companion, to FIDIC as an organisation and to the FIDIC contractual framework. It also includes a general guide to drafting…

Abstract

This chapter provides a general introduction to the companion, to FIDIC as an organisation and to the FIDIC contractual framework. It also includes a general guide to drafting international contracts as well as a more specific guide to drafting FIDIC based contracts. It includes a comparison of main features of the FIDIC conditions, a guide on selecting the right FIDIC form, and a general introduction on structuring a FIDIC based contract. Finally, it includes a list of suggested further reading.

Details

FIDIC Yellow Book: A Companion to the 2017 Plant and Design-Build Contract, Revised Edition
Type: Book
ISBN: 978-1-83608-164-7

Keywords

Book part
Publication date: 26 September 2024

Jakob B Sørensen

This Clause deals with the Contractor’s contractual obligations during the Defects Notification Period. Primarily, the Contractor shall remedy any defect or damage to the Works if…

Abstract

This Clause deals with the Contractor’s contractual obligations during the Defects Notification Period. Primarily, the Contractor shall remedy any defect or damage to the Works if such defect or damage is notified to the Contractor before the expiry of the DNP, regardless of what caused the defect or damage. This Clause also outlines the consequences of the Contractor failing to remedy defects or damage, the Contractor’s obligation to establish the cause of the defect or damage and provisions on the expiry of the DNP.

Details

FIDIC Yellow Book: A Companion to the 2017 Plant and Design-Build Contract, Revised Edition
Type: Book
ISBN: 978-1-83608-164-7

Keywords

Open Access
Article
Publication date: 3 July 2024

Anna af Hällström

Managing megaprojects is challenging due to their inherent complexity and uncertainty. Collaborative project delivery models have been introduced as an alternative to traditional…

Abstract

Purpose

Managing megaprojects is challenging due to their inherent complexity and uncertainty. Collaborative project delivery models have been introduced as an alternative to traditional project management in public infrastructure megaprojects and are often realized through collaborative contracts. These project organizations act as institutional arenas for logic interaction as actors with differing institutional backgrounds interact within the project. This paper aims to study the delivery phase of three megaprojects through an institutional lens, investigating the institutional interaction and alignment of logics therein.

Design/methodology/approach

A multiple case study was employed to reach deep insight into the phenomenon. Sixty-one interviews were conducted over 3 cases with representatives from all levels of the project hierarchy. Respondents were selected through snowball sampling. In two cases, observations of the shared project office were conducted. Data analysis built on first-order codes and second-order themes, collected into a theoretical framework.

Findings

The empirical evidence demonstrates the dynamics shaping institutional logics and gives evidence for changing logics in projects with a well-applied collaborative contract. However, there is a risk of resistance and a return to traditional logics since institutional change is slow and an unsuitably applied collaborative contract can lead to adherence to the conventional way of work.

Originality/value

Current research has focused on the regulatory framework and procurement phase of such models, but little attention has been given to the delivery phase and the interaction of conflicting logics. This paper can serve as an exemplar of the different logics found within public infrastructure projects and their interaction and alignment. Contributions include a heightened emphasis on the start of the project as a meeting point for differing institutional logics and the role change necessary when using a collaborative contract.

Open Access
Article
Publication date: 2 May 2024

Jonas Molin and Zahra Ahmadi

The purpose of this study is to develop and validate the business streamlining (BS) model proposed in 2017.

Abstract

Purpose

The purpose of this study is to develop and validate the business streamlining (BS) model proposed in 2017.

Design/methodology/approach

This study/paper develops and validates the qualitatively generated BS model, a conceptual model of service sourcing relationships, by testing it quantitatively. A survey was sent to chief exective officers, chief purchasing officers or facility managers in 764 private or public companies in Sweden with an annual turnover exceeding € 10m. The categories were tested and analyzed by means of factor analysis.

Findings

The BS model for managing service sourcing processes was confirmed to be significant overall, meaning that it is applicable irrespective of service sourcing context. The efficiency pursuing (EP) was found to have an interlinking role that calls for a revision of the BS model. Furthermore, the four categories tended to load pairwise.

Research limitations/implications

Although this cross-sectional study confirms the relevance of the BS model for managing service-sourcing processes, further studies should examine both the relative significance of its categories in different service-sourcing contexts and why the four main categories tend to pair.

Practical implications

The results support that the model is flexible and adaptable to a wide range of service-sourcing circumstances. Irrespective of the relative complexity of facility management (FM) sourcing processes, the categories can be adapted to fit the service sourcing context. Thus, it can be used as a tool to analyze and facilitate strategic decision-making.

Originality/value

The paper validates that the BS model can represent the dynamics of different service-sourcing processes, regardless of the complexity of the context.

Details

Journal of Business & Industrial Marketing, vol. 39 no. 13
Type: Research Article
ISSN: 0885-8624

Keywords

Open Access
Article
Publication date: 26 May 2023

Sina Moradi and Piia Sormunen

The construction industry has considerably evolved in the recent two decades due to the emergence of sustainability, lean construction (LC) and building information modelling…

4259

Abstract

Purpose

The construction industry has considerably evolved in the recent two decades due to the emergence of sustainability, lean construction (LC) and building information modelling (BIM). Despite previous research efforts, there is still a gap concerning the multidimensional nature of their integration. Hence, this study aims to fill the mentioned knowledge gap through exploring and comparing the challenges, enablers, techniques as well as benefits of integrating LC with BIM and sustainability in building construction projects.

Design/methodology/approach

A systematic literature review was conducted to fulfill the purpose of this study.

Findings

The findings reveal and compare the challenges, enablers, techniques and benefits of integrating LC with BIM and sustainability in building construction projects. The results suggest that there are eight common challenges for integrating LC with BIM and sustainability, including high initial cost, lack of collaboration, lack of professionals and lack of compatible contractual framework. The discovered challenges, enablers, techniques and benefits seem to be mostly routed in people. The findings also suggest that the synergistic benefits of integrating LC with BIM and sustainability can overcome the common challenges (safety, reliability, productivity, collaboration and quality) in construction projects.

Originality/value

The findings contribute to the literature and practice concerning the integration of LC with BIM and sustainability by exploring, comparing and discussing the relevant challenges, enablers, techniques as well as benefits. Moreover, the findings reveal the significance of the development of people in construction industry, besides processes and technology, as people are always subject of activities in construction while processes and technology are always objects.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Book part
Publication date: 26 September 2024

Jakob B Sørensen

This chapter provides a general introduction to the companion, to FIDIC as an organisation and to the FIDIC contractual framework. It also includes a general guide to drafting…

Abstract

This chapter provides a general introduction to the companion, to FIDIC as an organisation and to the FIDIC contractual framework. It also includes a general guide to drafting international contracts as well as a more specific guide to drafting FIDIC based contracts. It includes a comparison of main features of the FIDIC conditions, a guide on selecting the right FIDIC form, and a general introduction on structuring a FIDIC based contract. Finally, it includes a list of suggested further reading.

Details

FIDIC Yellow Book: A Companion to the 2017 Plant and Design-Build Contract, Revised Edition
Type: Book
ISBN: 978-1-83608-164-7

Keywords

1 – 10 of 67