Search results
1 – 10 of over 1000Tom McNamara, Sabry Shaaban and Sarah Hudson
The purpose of this paper is to investigate the performance of unpaced reliable production lines that are unbalanced in terms of their mean operation times, coefficients of…
Abstract
Purpose
The purpose of this paper is to investigate the performance of unpaced reliable production lines that are unbalanced in terms of their mean operation times, coefficients of variation and buffer capacities.
Design/methodology/approach
Simulations were carried out for five‐ and eight‐station lines with various buffer capacities and degrees of means imbalance. Throughput, idle time and average buffer level performance indicators were generated and statistically analysed.
Findings
The results show that an inverted bowl allocation of mean service times, combined with a bowl configuration for coefficients of variation and a decreasing order of buffer sizes results in higher throughput and lower idle times than a balanced line counterpart. In addition, considerable reductions in average inventory levels were consistently obtained when utilizing a configuration of progressively faster stations, coupled with a bowl‐shaped pattern for coefficients of variation and an ascending buffer size order.
Research limitations/implications
The results for these specific experiments imply that resources expended on trying to achieve a balanced line could be better used by seizing upon possible enhanced performance via controlled mean time, variability and buffer imbalance. Results are valid for only the line type and parameter values used (simulation results are specific and not general).
Practical implications
Guidelines are provided on design strategies for allocating labour and capital unevenly in unpaced lines for better performance in terms of increased throughput or lowered idle time or average buffer levels.
Originality/value
This paper might be viewed as one of the first simulation investigations into the performance of unpaced production lines with three sources of imbalance.
Details
Keywords
Biman Das, Jesus M. Sanchez‐Rivas, Alberto Garcia‐Diaz and Corinne A. MacDonald
The purpose of this paper is to develop a computer simulation model to evaluate the bowl phenomenon and the allocation at the end of the line of stations with either greater mean…
Abstract
Purpose
The purpose of this paper is to develop a computer simulation model to evaluate the bowl phenomenon and the allocation at the end of the line of stations with either greater mean operation times or higher variability of operation times.
Design/methodology/approach
The model was developed on the basis of a realistic case problem and applied to a six‐station assembly line. The evaluation criteria were the: minimization of the total elapsed time; maximization of the average percentage of working time; and minimization of the average time in the system.
Findings
The performance of an assembly line with independently normally distributed operation times could be improved by applying the bowl phenomenon. The allocation of large operation mean times to stations located near the end of the line did not produce improved results. Instead a more balanced allocation proved to be more significantly effective. On the other hand, the assignment of larger variability of operation times to the stations near the end of the line improved the performance of the assembly line.
Originality/value
The investigation contributed to the computer simulation approach to solving assembly line problems that dealt with the impact of normally distributed operation times on the bowl phenomenon and assembly lines with increasing mean operation times and higher variability of operation times at the end of the line of stations.
Details
Keywords
The monograph examines firstly the magnitude of demand for capital investment in individual items of distribution equipment—ships, aircraft and motor vehicles, It then…
Abstract
The monograph examines firstly the magnitude of demand for capital investment in individual items of distribution equipment—ships, aircraft and motor vehicles, It then concentrates on financing motor transport, examining the objectives of acquisition analysis and the relative importance of the company controlling its own fleet. Alternative methods of distributing the product are examined to show how transport involvement can be minimised according to the marketing strategy adopted. The monograph considers, in some detail, alternative approaches to commercial vehicle acquisition. The broad principles of the subject are discussed and three common methods presented—outright purchase, hire purchase and leasing. Worked examples are shown for each method, using discounted cash flow techniques and the net present costs of the alternatives compared. The final section of the paper examines the changing demand for capital in the company for transport from its launch as a one man operation through to the mature large organisation.
Sini Laari, Harri Lorentz, Patrik Jonsson and Roger Lindau
Drawing on information processing theory, the linkage between buffering and bridging and the ability on the part of procurement to resolve demand–supply imbalances is…
Abstract
Purpose
Drawing on information processing theory, the linkage between buffering and bridging and the ability on the part of procurement to resolve demand–supply imbalances is investigated, as well as contexts in which these strategies may be particularly useful or detrimental. Buffering may be achieved through demand change or redundancy, while bridging may be achieved by the means of collaboration or monitoring.
Design/methodology/approach
This study employs a hierarchical regression analysis of a survey of 150 Finnish and Swedish procurement and sales and operations planning professionals, each responding from the perspective of their own area of supply responsibility.
Findings
Both the demand change and redundancy varieties of buffering are associated with procurement's ability to resolve demand–supply imbalances without delivery disruptions, but not with cost-efficient resolution. Bridging is associated with the cost-efficient resolution of imbalances: while collaboration offers benefits, monitoring seems to make things worse. Dynamism diminishes, while the co-management of procurement in S&OP improves procurement's ability to resolve demand–supply imbalances. The most potent strategy for tackling problematic contexts appears to be buffering via demand change.
Practical implications
The results highlight the importance of procurement in the S&OP process and suggest tactical measures that can be taken to resolve and reduce the effects of supply and demand imbalances.
Originality/value
The results contribute to the procurement and S&OP literature by increasing knowledge regarding the role and integration of procurement to the crucial process of balancing demand and supply operations.
Details
Keywords
Sabry Shaaban, Tom McNamara and Sarah Hudson
The purpose of this paper is to investigate the performance of unpaced unreliable production lines that are deliberately unbalanced in terms of their coefficients of variation…
Abstract
Purpose
The purpose of this paper is to investigate the performance of unpaced unreliable production lines that are deliberately unbalanced in terms of their coefficients of variation (CVs).
Design/methodology/approach
A series of simulation experiments were carried out for five and eight station lines with mean buffer space set at one, two, four and six units. CVs were allocated in 12 different configurations for each of these lines.
Findings
The results show that the best unbalanced CV patterns in terms of throughput rates or idle times as compared to a balanced line counterpart are those where the steadiest stations are concentrated near the centre of the line. On the other hand, either concentrating the steadier operators towards the centre or close to the end of the line gives best average buffer level results.
Practical implications
The results provide guidelines for production line managers when designing unpaced unbalanced lines depending on their performance aims.
Originality/value
The investigation of the effects of unbalancing CVs in unreliable lines has not previously been studied and can provide insights into how best to place workstations with differing variability along the line.
Details
Keywords
A. MacFarlane, J.A. McCann and S.E. Robertson
An issue that tends to be ignored in information retrieval is the issue of updating inverted files. This is largely because inverted files were devised to provide fast query…
Abstract
Purpose
An issue that tends to be ignored in information retrieval is the issue of updating inverted files. This is largely because inverted files were devised to provide fast query service, and much work has been done with the emphasis strongly on queries. This paper aims to study the effect of using parallel methods for the update of inverted files in order to reduce costs, by looking at two types of partitioning for inverted files: document identifier and term identifier.
Design/methodology/approach
Raw update service and update with query service are studied with these partitioning schemes using an incremental update strategy. The paper uses standard measures used in parallel computing such as speedup to examine the computing results and also the costs of reorganising indexes while servicing transactions.
Findings
Empirical results show that for both transaction processing and index reorganisation the document identifier method is superior. However, there is evidence that the term identifier partitioning method could be useful in a concurrent transaction processing context.
Practical implications
There is an increasing need to service updates, which is now becoming a requirement of inverted files (for dynamic collections such as the web), demonstrating that a shift in requirements of inverted file maintenance is needed from the past.
Originality/value
The paper is of value to database administrators who manage large‐scale and dynamic text collections, and who need to use parallel computing to implement their text retrieval services.
Details
Keywords
Gul Afshan, Muhammad Kashif, Firdous Khanum, Mansoor Ahmed Khuhro and Umair Akram
Based on the conservation of resources theory, this study aims to investigate high involvement work practices (HIWP) as an antecedent to burnout with a mediating role of perceived…
Abstract
Purpose
Based on the conservation of resources theory, this study aims to investigate high involvement work practices (HIWP) as an antecedent to burnout with a mediating role of perceived work–family (WF) imbalance. Moreover, this study examines whether humble leadership moderates the relationship between HIWP and WF imbalance.
Design/methodology/approach
Using a time-lagged survey approach, data are collected from 200 employees working in the Indian services sector organizations.
Findings
The findings demonstrate that HIWP has a direct negative effect on burnout and an indirect effect via WF imbalance. Also, humble leadership moderates the relationship between HIWP and WF imbalance.
Originality/value
By studying the pessimistic view of HIWP in the Indian context, this study contributes to the scant studies available on its effect on burnout in collectivistic societies. Furthermore, humble leadership's moderating role in the relationship between HIWP and WF imbalance is unique to this study.
Details
Keywords
Biman Das, Alberto Garcia‐Diaz, Corinne A. MacDonald and Kalyan K. Ghoshal
The purpose of this paper is to develop a computer simulation model to evaluate increasing versus decreasing mean operation times assembly line arrangement for normal and…
Abstract
Purpose
The purpose of this paper is to develop a computer simulation model to evaluate increasing versus decreasing mean operation times assembly line arrangement for normal and exponential distributions and the variances equal to 1 and 16.
Design/methodology/approach
The model was developed on the basis of a realistic case problem and applied to a six‐station assembly line. The evaluation criteria were: the minimization of the total elapsed time; the maximization of the average percentage of working time; and the minimization of the average time in the system.
Findings
The increasing mean operation times line arrangement is superior to the decreasing mean operation times line arrangement for the normal and exponential distributions and the variances equal to 1 and 16, in terms of the total elapsed time and the average percentage of the working time evaluation criteria. The decreasing mean operation times lines is marginally superior to the increasing operation times line for the normal distribution for the variances equal to 1 and 16, in terms of the average time in the system evaluation criterion. The above inference can be made for the exponential distribution for the variance 16, but no definitive conclusion can be made for the variance 1. Overall, the increasing mean operation times line arrangement has proven to be superior to the decreasing operation times line arrangement for both the stated distributions and variances, in terms of the important evaluation criteria.
Originality/value
The paper contributes to the computer simulation approach to solving assembly line problems that deal with the impact of normally and exponentially distributed operation times, with variances equal to 1 and 16, on the increasing and decreasing mean operation times assembly line arrangements.
Details
Keywords
D.R.J. Owen and Y.T. Feng
This paper outlines a dynamic domain decomposition‐based parallel strategy for combined finite/discrete element analysis of multi‐fracturing solids and discrete systems. Attention…
Abstract
This paper outlines a dynamic domain decomposition‐based parallel strategy for combined finite/discrete element analysis of multi‐fracturing solids and discrete systems. Attention is focused on the parallelised interaction detection between discrete objects. Two graph representation models for discrete objects in contact are proposed which lay the foundation of the current development. In addition, a load imbalance detection and re‐balancing scheme is also suggested to enhance the parallel performance. Finally, numerical examples are provided to illustrate the parallel performance achieved with the current implementation.
Details
Keywords
W. Rocky Newman, Mark Hanna and Mary Jo Maffei
Provides an empirically based discussion of the uncertainties facedby typical manufacturing firms and how they attempt to accommodate thatuncertainty through increased…
Abstract
Provides an empirically based discussion of the uncertainties faced by typical manufacturing firms and how they attempt to accommodate that uncertainty through increased manufacturing flexibility. Suggests a dynamic equilibrium model which helps to illustrate the trade‐offs and interrelationships between the manufacturing flexibility inherent in a firm′s processes and infrastructure, the uncertainties faced by the firm, and the way in which the firm′s processes and infrastructures are buffered with inventory, lead time, and capacity. In addition, suggests a set of auditing checklists which build on earlier work by Skinner. This process helps the firm to identify its relative position in terms of the dynamic equilibrium model and also to identify long‐term objectives for improving its competitiveness within the marketplace.
Details