Search results

1 – 10 of 638
Article
Publication date: 22 February 2024

Zoubida Chorfi

As supply chain excellence matters, designing an appropriate health-care supply chain is a great consideration to the health-care providers worldwide. Therefore, the purpose of…

Abstract

Purpose

As supply chain excellence matters, designing an appropriate health-care supply chain is a great consideration to the health-care providers worldwide. Therefore, the purpose of this paper is to benchmark several potential health-care supply chains to design an efficient and effective one in the presence of mixed data.

Design/methodology/approach

To achieve this objective, this research illustrates a hybrid algorithm based on data envelopment analysis (DEA) and goal programming (GP) for designing real-world health-care supply chains with mixed data. A DEA model along with a data aggregation is suggested to evaluate the performance of several potential configurations of the health-care supply chains. As part of the proposed approach, a GP model is conducted for dimensioning the supply chains under assessment by finding the level of the original variables (inputs and outputs) that characterize these supply chains.

Findings

This paper presents an algorithm for modeling health-care supply chains exclusively designed to handle crisp and interval data simultaneously.

Research limitations/implications

The outcome of this study will assist the health-care decision-makers in comparing their supply chains against peers and dimensioning their resources to achieve a given level of productions.

Practical implications

A real application to design a real-life pharmaceutical supply chain for the public ministry of health in Morocco is given to support the usefulness of the proposed algorithm.

Originality/value

The novelty of this paper comes from the development of a hybrid approach based on DEA and GP to design an appropriate real-life health-care supply chain in the presence of mixed data. This approach definitely contributes to assist health-care decision-makers design an efficient and effective supply chain in today’s competitive word.

Details

Journal of Modelling in Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1746-5664

Keywords

Open Access
Article
Publication date: 20 October 2023

Marisol S. Romero-Mancilla, Kenneth E. Hernandez-Ruiz and Diana L. Huerta-Muñoz

The purpose of this paper is to introduce a three-echelon multimodal transportation problem applied to a humanitarian logistic case study that occurred in Mexico.

Abstract

Purpose

The purpose of this paper is to introduce a three-echelon multimodal transportation problem applied to a humanitarian logistic case study that occurred in Mexico.

Design/methodology/approach

This study develops a methodology combining a transshipment problem and an adaptation of the multidepot heterogeneous fleet vehicle routing problem to construct a mathematical model that incorporates the use of land-based vehicles and drones. The model was applied to the case study of the Earthquake on September 19, 2017, in Mexico, using the Gurobi optimization solver.

Findings

The results ratified the relevance of the study, showing an inverse relationship between transportation costs and delivery time; on the flip side, the model performed in a shorter CPU time with medium and small instances than with large instances.

Research limitations/implications

While the size of the instances limits the use of the model for big-scale problems, this approach manages to provide a good representation of a transportation network during a natural disaster using drones in the last-mile deliveries.

Originality/value

The present study contributes to a model that combines a vehicle routing problem with transshipment, multiple depots and a heterogeneous fleet including land-based vehicles and drones. There are multiple models present in the literature for these types of problems that incorporate the use of these transportation modes; however, to the best of the authors’ knowledge, there are still no proposals similar to this study.

Details

Journal of Humanitarian Logistics and Supply Chain Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2042-6747

Keywords

Article
Publication date: 29 May 2023

Peipei Wang, Kun Wang, Yunhan Huang and Peter Fenn

Time-cost trade-off is normal conduct in construction projects when projects are expectedly late for delivery. Existing research on time-cost trade-off strategic management mostly…

Abstract

Purpose

Time-cost trade-off is normal conduct in construction projects when projects are expectedly late for delivery. Existing research on time-cost trade-off strategic management mostly focused on the technical calculation towards the optimal combination of activities to be accelerated, while the managerial aspects are mostly neglected. This paper aims to understand the managerial efforts necessary to prepare construction projects ready for an upcoming trade-off implementation.

Design/methodology/approach

A preliminary list of critical factors was first identified from the literature and verified by a Delphi survey. Quantitative data was then collected by a questionnaire survey to first shortlist the preliminary factors and quantify the predictive model with different machine learning algorithms, i.e. k-nearest neighbours (kNN), radial basis function (RBF), multiplayer perceptron (MLP), multinomial logistic regression (MLR), naïve Bayes classifier (NBC) and Bayesian belief networks (BBNs).

Findings

The model's independent variable importance ranking revealed that the top challenges faced were the realism of contractual obligation, contractor planning and control and client management and monitoring. Among the tested machine learning algorithms, multilayer perceptron was demonstrated to be the most suitable in this case. This model accuracy reached 96.5% with the training dataset and 95.6% with an independent test dataset and could be used as the contingency approach for time-cost trade-offs.

Originality/value

The identified factor list contributed to the theoretical explanation of the failed implementation in general and practical managerial improvement to better avoid such failure. In addition, the established predictive model provided an ad-hoc early warning and diagnostic tool to better ensure time-cost implementation success.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 30 August 2023

Donghui Yang, Yan Wang, Zhaoyang Shi and Huimin Wang

Improving the diversity of recommendation information has become one of the latest research hotspots to solve information cocoons. Aiming to achieve both high accuracy and…

Abstract

Purpose

Improving the diversity of recommendation information has become one of the latest research hotspots to solve information cocoons. Aiming to achieve both high accuracy and diversity of recommender system, a hybrid method has been proposed in this paper. This study aims to discuss the aforementioned method.

Design/methodology/approach

This paper integrates latent Dirichlet allocation (LDA) model and locality-sensitive hashing (LSH) algorithm to design topic recommendation system. To measure the effectiveness of the method, this paper builds three-level categories of journal paper abstracts on the Web of Science platform as experimental data.

Findings

(1) The results illustrate that the diversity of recommended items has been significantly enhanced by leveraging hashing function to overcome information cocoons. (2) Integrating topic model and hashing algorithm, the diversity of recommender systems could be achieved without losing the accuracy of recommender systems in a certain degree of refined topic levels.

Originality/value

The hybrid recommendation algorithm developed in this paper can overcome the dilemma of high accuracy and low diversity. The method could ameliorate the recommendation in business and service industries to address the problems of information overload and information cocoons.

Details

Aslib Journal of Information Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2050-3806

Keywords

Article
Publication date: 6 December 2023

Fatma Lehyani, Alaeddine Zouari, Ahmed Ghorbel and Michel Tollenaere

Companies should enhance their market position and competitiveness by improving staff effectiveness, skills, resource commitment, and applying relevant managerial methods. This…

Abstract

Purpose

Companies should enhance their market position and competitiveness by improving staff effectiveness, skills, resource commitment, and applying relevant managerial methods. This study aims to examine the impact of knowledge management (KM) and total quality management (TQM) on employee effectiveness (EE) and supply chain performance (SCP) in emerging economies.

Design/methodology/approach

The used methodology consists on conducting a survey within Tunisian companies, where the authors gathered 206 responses. Collected data was analyzed using statistical package for the social sciences (SPSS) software, enabling the authors to establish a conceptual model. This model was further examined through structural equation modeling, using analysis of moment structures (AMOS) software for hypothesis validation. Additionally, the authors’ research aimed to enhance SCP and boost EE while minimizing costs through a nonlinear mathematical model and the quality function deployment method.

Findings

The results indicate that TQM and KM positively impact EE, and KM and EE positively impact SCP. However, the significance of employee performance on SCP varies depending on company location and industry sector studied.

Originality/value

This work emphasized the involvement of small- and medium-sized enterprise managers from emerging economies in the studied concepts and confirmed the effects of KM and TQM practices on EE and SCP.

Details

International Journal of Lean Six Sigma, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 12 June 2023

Sarasadat Alavi, Ali Bozorgi-Amiri and Seyed Mohammad Seyedhosseini

Fortification-interdiction models provide system designers with a broader perspective to identify and protect vital components. Based on this concept, the authors examine how…

Abstract

Purpose

Fortification-interdiction models provide system designers with a broader perspective to identify and protect vital components. Based on this concept, the authors examine how disruptions impact critical supply systems and propose the most effective protection strategies based on three levels of decision-makers. This paper aims to investigate location and fortification decisions at the first level. Moreover, a redesign problem is presented in the third level to locate backup facilities and reallocate undisrupted facilities following the realization of the disruptive agent decisions at the second level.

Design/methodology/approach

To address this problem, the authors develop a tri-level planner-attacker-defender optimization model. The model minimizes investment and demand satisfaction costs and alleviates maximal post-disruption costs. While decisions are decentralized at different levels, the authors develop an integrated solution algorithm to solve the model using the column-and-constraint generation (CCG) method.

Findings

The model and the solution approach are tested on a real supply system consisting of several hospitals and demand areas in a region in Iran. Results indicate that incorporating redesign decisions at the third level reduces maximum disruption costs.

Originality/value

The paper makes the following contributions: presenting a novel tri-level optimization model to formulate facility location and interdiction problems simultaneously, considering corrective measures at the third level to reconfigure the system after interdiction, creating a resilient supply system that can fulfill all demands after disruptions, employing a nested CCG method to solve the model.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 13 July 2023

S.M. Taghavi, V. Ghezavati, H. Mohammadi Bidhandi and S.M.J. Mirzapour Al-e-Hashem

This paper proposes a two-level supply chain including suppliers and manufacturers. The purpose of this paper is to design a resilient fuzzy risk-averse supply portfolio selection…

Abstract

Purpose

This paper proposes a two-level supply chain including suppliers and manufacturers. The purpose of this paper is to design a resilient fuzzy risk-averse supply portfolio selection approach with lead-time sensitive manufacturers under partial and complete supply facility disruption in addition to the operational risk of imprecise demand to minimize the mean-risk costs. This problem is analyzed for a risk-averse decision maker, and the authors use the conditional value-at-risk (CVaR) as a risk measure, which has particular applications in financial engineering.

Design/methodology/approach

The methodology of the current research includes two phases of conceptual model and mathematical model. In the conceptual model phase, a new supply portfolio selection problem is presented under disruption and operational risks for lead-time sensitive manufacturers and considers resilience strategies for risk-averse decision makers. In the mathematical model phase, the stages of risk-averse two-stage fuzzy-stochastic programming model are formulated according to the above conceptual model, which minimizes the mean-CVaR costs.

Findings

In this paper, several computational experiments were conducted with sensitivity analysis by GAMS (General algebraic modeling system) software to determine the efficiency and significance of the developed model. Results show that the sensitivity of manufacturers to the lead time as well as the occurrence of disruption and operational risks, significantly affect the structure of the supply portfolio selection; hence, manufacturers should be taken into account in the design of this problem.

Originality/value

The study proposes a new two-stage fuzzy-stochastic scenario-based mathematical programming model for the resilient supply portfolio selection for risk-averse decision-makers under disruption and operational risks. This model assumes that the manufacturers are sensitive to lead time, so the demand of manufacturers depends on the suppliers who provide them with services. To manage risks, this model also considers proactive (supplier fortification, pre-positioned emergency inventory) and reactive (revision of allocation decisions) resilience strategies.

Article
Publication date: 30 June 2023

Hana Begić, Mario Galić and Uroš Klanšek

Ready-mix concrete delivery problem (RMCDP), a specific version of the vehicle routing problem (VRP), is a relevant supply-chain engineering task for construction management with…

Abstract

Purpose

Ready-mix concrete delivery problem (RMCDP), a specific version of the vehicle routing problem (VRP), is a relevant supply-chain engineering task for construction management with various formulations and solving methods. This problem can range from a simple scenario involving one source, one material and one destination to a more challenging and complex case involving multiple sources, multiple materials and multiple destinations. This paper presents an Internet of Things (IoT)-supported active building information modeling (BIM) system for optimized multi-project ready-mix concrete (RMC) delivery.

Design/methodology/approach

The presented system is BIM-based, IoT supported, dynamic and automatic input/output exchange to provide an optimal delivery program for multi-project ready-mix-concrete problem. The input parameters are extracted as real-time map-supported IoT data and transferred to the system via an application programming interface (API) into a mixed-integer linear programming (MILP) optimization model developed to perform the optimization. The obtained optimization results are further integrated into BIM by conventional project management tools. To demonstrate the features of the suggested system, an RMCDP example was applied to solve that included four building sites, seven eligible concrete plants and three necessary RMC mixtures.

Findings

The system provides the optimum delivery schedule for multiple RMCs to multiple construction sites, as well as the optimum RMC quantities to be delivered, the quantities from each concrete plant that must be supplied, the best delivery routes, the optimum execution times for each construction site, and the total minimal costs, while also assuring the dynamic transfer of the optimized results back into the portfolio of multiple BIM projects. The system can generate as many solutions as needed by updating the real-time input parameters in terms of change of the routes, unit prices and availability of concrete plants.

Originality/value

The suggested system allows dynamic adjustments during the optimization process, andis adaptable to changes in input data also considering the real-time input data. The system is based on spreadsheets, which are widely used and common tool that most stakeholders already utilize daily, while also providing the possibility to apply a more specialized tool. Based on this, the RMCDP can be solved using both conventional and advanced optimization software, enabling the system to handle even large-scale tasks as necessary.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 January 2024

Mohsen Rajabzadeh, Seyed Meysam Mousavi and Farzad Azimi

This paper investigates a problem in a reverse logistics (RLs) network to decide whether to dispose of unsold goods in primary stores or re-commercialize them in outlet centers…

Abstract

Purpose

This paper investigates a problem in a reverse logistics (RLs) network to decide whether to dispose of unsold goods in primary stores or re-commercialize them in outlet centers. By deducting the costs associated with each policy from its revenue, this study aims to maximize the profit from managing unsold goods.

Design/methodology/approach

A new mixed-integer linear programming model has been developed to address the problem, which considers the selling prices of products in primary and secondary stores and the costs of transportation, cross-docking and returning unwanted items. As a result of uncertain nature of the cost and time parameters, gray numbers are used to deal with it. In addition, an innovative uncertain solution approach for gray programming problems is presented that considers objective function satisfaction level as an indicator of optimism.

Findings

According to the results, higher costs, including transportation, cross-docking and return costs, make sending goods to outlet centers unprofitable and more goods are disposed of in primary stores. Prices in primary and secondary stores heavily influence the number of discarded goods. Higher prices in primary stores result in more disposed of goods, while higher prices in secondary stores result in fewer. As a result of the proposed method, the objective function satisfaction level can be viewed as a measure of optimism.

Originality/value

An integral contribution of this study is developing a new mixed-integer linear programming model for selecting the appropriate goods for re-commercialization and choosing the best outlet center based on the products' price and total profit. Another novelty of the proposed model is considering the matching percentage of boxes with secondary stores’ desired product lists and the probability of returning goods due to non-compliance with delivery dates. Moreover, a new uncertain solution approach is developed to solve mathematical programming problems with gray parameters.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 12 September 2023

Mohammad Hossein Dehghani Sadrabadi, Ahmad Makui, Rouzbeh Ghousi and Armin Jabbarzadeh

The adverse interactions between disruptions can increase the supply chain's vulnerability. Accordingly, establishing supply chain resilience to deal with disruptions and…

Abstract

Purpose

The adverse interactions between disruptions can increase the supply chain's vulnerability. Accordingly, establishing supply chain resilience to deal with disruptions and employing business continuity planning to preserve risk management achievements is of considerable importance. The aforementioned idea is discussed in this study.

Design/methodology/approach

This study proposes a multi-objective optimization model for employing business continuity management and organizational resilience in a supply chain for responding to multiple interrelated disruptions. The improved augmented e-constraint and the scenario-based robust optimization methods are adopted for multi-objective programming and dealing with uncertainty, respectively. A case study of the automotive battery manufacturing industry is also considered to ensure real-world conformity of the model.

Findings

The results indicate that interactions between disruptions remarkably increase the supply chain's vulnerability. Choosing a higher fortification level for the supply chain and foreign suppliers reduces disruption impacts on resources and improves the supply chain's resilience and business continuity. Facilities dispersion, fortification of facilities, lateral transshipment, order deferral policy, dynamic capacity planning and direct transportation of products to markets are the most efficient resilience strategies in the under-study industry.

Originality/value

Applying resource allocation planning and portfolio selection to adopt preventive and reactive resilience strategies simultaneously to manage multiple interrelated disruptions in a real-world automotive battery manufacturing industry, maintaining the long-term achievements of supply chain resilience using business continuity management and dynamic capacity planning are the main contributions of the presented paper.

1 – 10 of 638